Empowering Business in Real Time. Avanceon. All rights Reserved. October 20, 2015 Virtualization for Power Industry
Empowering Business in Real Time. Avanceon. All rights Reserved.
October 20, 2015
Virtualization for Power Industry
About K Electric
The Only VERTICAL INTEGRATED utility in Pakistan
Overview of KE Generation
Business Challenges for KE:
Decision-grade data not available when needed
Plant monitoring is decentralized--- individually at different locations within the plant
No Standardized Performance Calculation tool for determining heat rate, material balance and KPIs in real-time
No integration of plants operational data with KPI calculation & reporting
Costly and scarce fuel availability raises serious optimization challenges
Combined economic impact of different power plants not available in real time.
Data acquisition processing and calculations are man hour intensive
Advantages of Real Time Fleet Performance
Optimization
Enables real-time integrated data reporting and visualization tools to identify new optimization opportunities i.einstead of isolated monitoring of individual plants; Collective /Fleet performance can be monitored
Enables real time remote monitoring and archiving of deviations in operation parameters and plant performance
Maintenance planning and availability improvement. Potential identification of faults before they occur
Identification of generating units where fuel consumption is higher; focus on causes resulting in fuel wastages
Real Time Environmental Monitoring; Leads to reduction in Green House Gases
Essential for Economic Dispatch. Provides data on Loading Optimization of the Stations .
Analysis of Steam. Feed-water, condensate, air-fuel parameters would assist in efficiency improvement and Aux Power reduction measures in real time
Measure to Manage Approach
“You cannot Manage (effectively)
what you cannot Measure
(Accurately) ”
- Jack Welch
7 Value now. Value over time. © Copyright 2009, OSIsoft, LLC. All rights Reserved.
KElectric Centralized
Plant Data Historian
Corporate wide plant historian for individual plant
performances, production summaries, alarms/events, KPI etc
Accessible through windows based explorer or Microsoft
office based add-ins tools
Challenge: Islands of Information
8 Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved.
POWER PLANTDCS/PLC/Control System
Process Management
Business Management
Operation Management
-Thermal Efficiency Plant Factor
-Loss Analysis
-Equipment Performance-Heat & Mass Balance
-Financial Reports
-Performance Reports-Loss / profit Analysis
-Plant Indices
-Operating Guidance-Diary-Electronic Log Book
POWER PLANTDCS/PLC/Control System ,
,
Online Web
Based Application
H
I
S
T
O
R
I
A
N-HMI’s/Screens
-Reports
OPC Interface
OPC Interface
Proposed Application Structure
Utilize an IT approach to Implementation a redundant system and Systems Management
05 Distant Plant Locations
05 FT PI Historian Servers (Virtualized High Availability)
01 Central FT PI Server & Portal Server HO
05 Interface/Buffer Nodes
09 OPC Servers for DCS’s/PLC’s
(Honeywell, Rockwell, ABB, Emerson, GE, Siemens)
05 Individual NAS
05 3G/4G Modems as backup communication with HO
Users for Excel, Process Display and Web Portal
Cyber security and Network security via firewalls
10 Value now. Value over time. © Copyright 2009, OSIsoft, LLC. All rights Reserved.
Proposed System Layout – Virtualized Platform
11 Value now. Value over time. © Copyright 2009, OSIsoft, LLC. All rights Reserved.
Cabinet Details
• Essentials
– 02 Dell Rack Mounted Servers
– High Speed Switch
– X TB Storage Attached
– VMware, vSphere , vCenter
– OPC Buffer VM’s
– Historian VM’s in High Availability
– 24U Server Cabinet
– Cisco Firewalls
Why KE chose Virtualization
• Extended lifespan & easy replacement
• System should be able to run for
years
• Increased reliability
• High Availability of the system
• Virtual Redundant Systems
• Competitive Software Licensing
• KE IT already managing Virtual
Infrastructure
• Reduced operational and lifecycle cost
• Simplified administrative procedures
• Standardized SOPs for Disaster
Recovery Procedures.
• Avanceon – Solutions Expert in the
market
Proposed Sample Layouts
16 Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved.
17 Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved.
Combine Cycle Power Plant
Heat Rate :
Gross Power:
Net Power:
GT 1 efficiency
GT 2 Efficiency
ST Efficiency:
Thank you