41

Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

May 30, 2018

Download

Documents

trandieu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Virginia Avenue Tunnel Reconstruction Project

April 2016 Brandon Knapp, P.E.

Two New Tunnels

Page 2: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

CSX connects the nation and the globe

The 23 State CSX Network… 30,000 employees 21,000 route miles 1,200+ trains/day 5 million+ carloads 3,500+ locomotives 80,000+ freight cars Serves 70 ocean, lake and river

ports

2

. . . Gulfport

Pascagoula Mobile

. Port Manatee

.

. .

.

. Brunswick

Savannah

Charleston

Wilmington

Newport News

Page 3: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

National Gateway: Critical to meeting future freight demands

3

Current and Planned Double Stack Routes

National Gateway Project

Chicago New York

Florida

Boston

St. Louis

Memphis

New Orleans

Wilmington

Hampton Roads

Baltimore

NW Ohio Transfer Yard

Pittsburgh

Chambersburg

Columbus

Charlotte

61 clearance projects in 6 states and the District of Columbia to achieve 21’0” clearance — Construction work varies from

minor modifications to complete reconstruction of bridges, tunnels and other infrastructure

5 new/enhanced terminals along the

National Gateway corridors utilizing the latest technology

Page 4: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

National Gateway Projects

4

Page 5: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Virginia Avenue Tunnel

5

A single track, low clearance tunnel in Southeast DC 3800 feet long / 109+ years old A major bottleneck to east coast rail operations

Page 6: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Tunnel Location

6

Page 7: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Existing Virginia Avenue Tunnel

Constructed in two phases between 1872 and 1904

Approximately 3,800’ long Lies generally beneath Virginia Ave. SE Single track through the tunnel with

double track on either side Vertical clearance is insufficient for

double stack intermodal container freight trains (≈ 18’)

Increased maintenance costs as the tunnel nears the end of its useful life – 350’ section collapsed in 1985

7

Page 8: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Project Purpose and Need

The purpose is to preserve, over the long term, the continued ability to provide efficient freight transportation services in the District of Columbia, the Washington Metropolitan Area, and the eastern seaboard Address the structural deficiencies of the tunnel Accommodate expected increases in freight

transportation that, in part, would stem from the expansion of the Panama Canal

Ensure that during construction freight transportation services remain uninterrupted

8

Page 9: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Project Development

NEPA — Project began as an EA in early 2011 and was

changed to an EIS in May 2012 — Lead federal agency – FHWA — Lead local agency - DDOT — 11 Initial concepts with 4 retained in the EIS — Draft EIS – July 2013 — Final EIS with Preferred Alternative – June 2014 — Record of Decision – November 2014

9

Page 10: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Selected Alternative

Two tunnels with shared middle wall

Double stack clearance Rebuild using protected open

trench construction methods New length: 4,132’ Upgraded security and

drainage features Estimated construction

duration: 30 – 42 months

10

Page 11: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

NEPA Mitigations

Residential Property Mitigation (RPM) Air, noise, and vibration monitoring Pile Drilling Construction protection plan Archeological work plan VA Ave. pavers Community outreach program Virginia Avenue Park – Dog Park Restoration of CP VA Tower Preservation of tunnel portal stones Enhanced streetscape, landscaping, and greenspace

11

Page 12: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Post ROD World

Final design and permitting Agreements Utility design approvals and relocations Site preparation NEPA mitigation implementation Major Construction Start – May 2015

12

Page 13: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Final Design Features

Steel reinforced, cast in-place concrete structure 21’3” Vertical Clearance – 18’ Horizontal Clearance Roof design: AASHTO HS25 (per DDOT standards) Drilled “H-pile” and “secant pile” design support-of-excavation (SOE) in

lieu of driven piles Track: CWR on concrete ties Access from street level – cross passage access to both tunnels Improved drainage system with dual electric pumps and control valves Safety / inspection walkway incorporated on top of duct banks Upgraded security system LED lighting and ventilation fans Back up generators PTC communication compatible

13

Page 14: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Unique Tunnel Features

Three typical tunnel cross-sections — West segment – shared tunnel — Middle segment – shared middle tunnel wall

(majority) — East segment – split tunnels

Tiber Creek Sewer 6th Street Siphon Marine Chiller Underpinning Six Cross-street bridges Phase 1 Tunnel demolition – 370’ under live traffic

14

Page 15: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Sequence of Construction

15

Page 16: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

West Segment

16

Page 17: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

East Segment

17

Page 18: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Surface Restoration

Phase II Tunnel

Phase I Tunnel

Utility Relocations

Site Preparation

Permits - DDOT

Permits - DCRA

Project Completion

Double-Track/Double-Stack

Single-Track/Double-Stack

ROD 11/04/14

Nov-14 Feb-15 May-15 Aug-15 Nov-15 Feb-16 May-16 Aug-16 Nov-16 Feb-17 May-17 Aug-17 Nov-17 Feb-18 May-18 Aug-18 Nov-18

Virginia Avenue Tunnel Reconstruction Project Summary Schedule

Note: Activity start dates are contingent upon receipt of the required permits.

As f 4/01/16

Page 19: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:
Page 20: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Major Milestones Completed

Utility relocations – 95% complete Phase 1 tunnel demolition complete 4th St. temporary bridge deck open Tunnel Invert – 10% compete Walls – 9% 1st Precast roof segment installed Tiber Creek bridge construction started

Page 21: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Utility Relocations

21

Page 22: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

East End Retaining Wall

22

Page 23: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Support of Excavation and Secant Pile Wall Construction

23

Page 24: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Mass Excavation in the 400 Block of VA Ave.

24

Page 25: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Mass Excavation Adjacent to the Marines Facility

Page 26: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Mass Excavation Adjacent to the Marines Facility

Excavate to Subgrade

Page 27: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Mass Excavation in Virginia Avenue Park

Excavate to Subgrade

Page 28: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Cross-Street Bridges

28

Page 29: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Tunnel Demolition - Phase I 100% Complete

Page 30: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Tunnel Demolition - Phase I 100% Complete

30

Page 31: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Tunnel Demo - 200 Block of VA Ave.

Page 32: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

“Four-level” crossing at Tiber Creek

32

(I-695 above 2nd Street)

14’ 6”

Page 33: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Marine Chiller Underpinning

33

Page 34: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Tunnel Concrete Construction – 400 Block of VA Ave.

Page 35: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

East End Tunnel Construction

35

Page 36: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

East End Tunnel Construction

Page 37: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

East End Tunnel Construction

Page 38: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

East end Tunnel Construction

38

Page 39: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

East End Tunnel Construction

39

Page 40: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Upcoming Events and Ways to Stay Connected

Coffee with Chuck - CSX Community Office Wednesday, May 18, 2016 Wednesday, June 15, 2016

Quarterly Open House - Courtyard Marriott Thursday, April 14, 2016 Thursday, July 21, 2016

www.virginiaavenuetunnel.com Sign up for e-mail and text alerts Twitter: @VATNews

Page 41: Virginia Avenue Tunnel Reconstruction Project · Virginia Avenue Tunnel Reconstruction Project ... Marine Chiller Underpinning 33 . ... PowerPoint Presentation Author:

Thank You!

41