www.thamestunnelconsultation.co.uk Victoria Embankment  Victoria Embankment Gardens Golden Jubilee Footbridges C   h  a  r  i  n   g  C   r  o  s  s  S   t  a  t  i  o  n     S    t   r   a   n   d  V  i c  t  o  r  i a   E  m  b  a  n  k  m  e  n  t N o r t h u m b e r l a n d  Av e n u e Hungerford Bridge Low Level Sewer No.1 Regent Street CSO Northumberland Street CSO N CITY OF WESTMINSTER LAMBETH Local authority boundary Draft limit of land to be acquired or used Proposed tunnel route – centreline Existing sewer Existing CSO Location plan  Jack up barge servicing piling operations Two way traffic Initial closure of westbound carriageway (advance works only – diversion of underground utilities) Tattershall Castle to be relocated Possible location of permanentlyrelocated TattershallCastle Westboundcarriageway partly re-opened on completion of advance works, part closed for site access Barge N Maximum extent of construction site for phase 1 Site hoarding/ traffic barrier Cofferdam Local authority boundary Sitesupport/welfare Traffic lane coned off for site access Site access Existing Thames Path Thames Path diversion CITY OF WESTMINSTER LAMBETH Phase one construction plan Phases two and three construction plan  N Option for contractor to transport materials using barges Cranes Drop shaft Maximum extent of construction site for phases 2 and 3 Sitehoarding/ traffic barrier Cofferdam Local authority boundary Sitesupport/welfare Excavatedmaterial storage and processing Maintenance workshop and storage Internal site road Traffic lane coned off for site access Site access Existing Thames Path Thames Path diversion CITY OF WESTMINSTER LAMBETH Possible location of permanentlyrelocated TattershallCastle  Aerial view of the completed works  Viewing platforms along southern edge Ramps provide step free access to viewing platform Granite paving Stone clad electrical and control kiosks Central section of canopy removable for maintenanceaccess Canopy planted with jasmine New Regent Street CSO outlet Ventilationcolumns Access hatches with brass inlay panels Replacement tree planting Raised viewing platform with balustrade edge protection and stone seating  V  i  c  t  o  r  i  a   E  m  b  a  n  k  m  e  n  t N Layout of the site once construction works complete  [Tames Water to provide plan] N Option for contractor to transport materials using barges Cranes Drop shaft Maximum extent of construction site for phase 4 Site hoarding/ traffic barrier Cofferdam Local authority boundary Site support/welfare Excavated material storage and processing Maintenance workshop and storage Internal site road Traffic lane coned off for site access Site access Existing Thames Path Thames Path diversion CITY OF WESTMINSTER LAMBETH Possible location of permanently relocated Tattershall Castle Phase four construction plan
2

Victoria Embankment display board

Apr 06, 2018

Download

Documents

thamestunnel
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Victoria Embankment display board

8/3/2019 Victoria Embankment display board

http://slidepdf.com/reader/full/victoria-embankment-display-board 1/1

www.thamestunnelconsultation.co.uk

Victoria Embankment

 

Victoria

Embankment

Gardens

Golden JubileeFootbridges

C   h  a  r  i  n   g  C   r  o  s  s  

S   t  a  t  i  o  n  

   S   t  r  a

  n  d

                    V                   i              c

                  t              o              r                   i              a

                     E              m

                     b              a              n

                     k              m              e              n

                  t

N o r t h u m b e r l a n d  Av e n u e  HungerfordBridge

Low LevelSewer No.1

RegentStreet CSO

NorthumberlandStreet CSO

N

CITY OF WESTMINSTER

LAMBETH

Local authorityboundary

Draft limit of land tobe acquired or used

Proposed tunnelroute – centreline

Existing sewer

Existing CSO

Location plan

 

Jack up bargeservicing pilingoperations

Two waytraffic

Initial closure of westboundcarriageway (advance

works only – diversion of underground utilities)

TattershallCastle to berelocated

Possible location of permanently relocatedTattershall Castle

Westbound carriagewaypartly re-opened on

completion of advance works,part closed for site access

Barge

N

Maximum extentof construction sitefor phase 1

Site hoarding/traffic barrier

Cofferdam

Local authorityboundary

Site support/welfare

Traffic lane coned off for site access

Site access

Existing Thames Path

Thames Path diversion

CITY OF WESTMINSTER

LAMBETH

Phase one construction plan Phases two and three construction plan

 

N

Option for contractorto transport materials

using barges

Cranes

Drop shaft

Maximum extent of construction site forphases 2 and 3

Site hoarding/traffic barrier

Cofferdam

Local authority boundary

Site support/welfare

Excavated materialstorage and processing

Maintenance workshopand storage

Internal site road

Traffic lane coned off for site access

Site access

Existing Thames Path

Thames Path diversion

CITY OF WESTMINSTER

LAMBETH

Possible location of permanently relocated

Tattershall Castle

 

Aerial view of the completed works

 

Viewing platformsalong southern edge

Ramps providestep free access toviewing platformGranite paving

Stone clad electricaland control kiosks

Central section of canopy removable formaintenance access

Canopy plantedwith jasmine

New Regent StreetCSO outlet

Ventilation columns

Access hatches withbrass inlay panels

Replacementtree planting

Raised viewing platformwith balustrade edgeprotection and stoneseating

              V             i         c            t         o

          r             i         a               E

          m              b

         a          n              k

          m         e          n            t

N

Layout of the site once construction works complete

 

[Tames Water to provide plan]

N

Option for contractorto transport materials

using barges

Cranes

Drop shaft

Maximum extent of construction site for

phase 4

Site hoarding/traffic barrier

Cofferdam

Local authorityboundary

Site support/welfare

Excavated materialstorage and processing

Maintenanceworkshop and storage

Internal site road

Traffic lane coned off for site access

Site access

Existing Thames Path

Thames Path diversion

CITY OF WESTMINSTER

LAMBETH

Possible location of permanently relocated

Tattershall Castle

Phase four construction plan