www.thamestunnelconsultation.co.uk Victoria Embankment Victoria Embankment Gardens Golden Jubilee Footbridges C h a r i n g C r o s s S t a t i o n S t r a n d V i c t o r i a E m b a n k m e n t N o r t h u m b e r l a n d Av e n u e Hungerford Bridge Low Level Sewer No.1 Regent Street CSO Northumberland Street CSO N CITY OF WESTMINSTER LAMBETH Local authority boundary Draft limit of land to be acquired or used Proposed tunnel route – centreline Existing sewer Existing CSO Location plan Jack up barge servicing piling operations Two way traffic Initial closure of westbound carriageway (advance works only – diversion of underground utilities) Tattershall Castle to be relocated Possible location of permanentlyrelocated TattershallCastle Westboundcarriageway partly re-opened on completion of advance works, part closed for site access Barge N Maximum extent of construction site for phase 1 Site hoarding/ traffic barrier Cofferdam Local authority boundary Sitesupport/welfare Traffic lane coned off for site access Site access Existing Thames Path Thames Path diversion CITY OF WESTMINSTER LAMBETH Phase one construction plan Phases two and three construction plan N Option for contractor to transport materials using barges Cranes Drop shaft Maximum extent of construction site for phases 2 and 3 Sitehoarding/ traffic barrier Cofferdam Local authority boundary Sitesupport/welfare Excavatedmaterial storage and processing Maintenance workshop and storage Internal site road Traffic lane coned off for site access Site access Existing Thames Path Thames Path diversion CITY OF WESTMINSTER LAMBETH Possible location of permanentlyrelocated TattershallCastle Aerial view of the completed works Viewing platforms along southern edge Ramps provide step free access to viewing platform Granite paving Stone clad electrical and control kiosks Central section of canopy removable for maintenanceaccess Canopy planted with jasmine New Regent Street CSO outlet Ventilationcolumns Access hatches with brass inlay panels Replacement tree planting Raised viewing platform with balustrade edge protection and stone seating V i c t o r i a E m b a n k m e n t N Layout of the site once construction works complete [Tames Water to provide plan] N Option for contractor to transport materials using barges Cranes Drop shaft Maximum extent of construction site for phase 4 Site hoarding/ traffic barrier Cofferdam Local authority boundary Site support/welfare Excavated material storage and processing Maintenance workshop and storage Internal site road Traffic lane coned off for site access Site access Existing Thames Path Thames Path diversion CITY OF WESTMINSTER LAMBETH Possible location of permanently relocated Tattershall Castle Phase four construction plan