Top Banner
Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations 9-10 May, 2016
19

Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Mar 30, 2019

Download

Documents

leduong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium

Rob Thurgur Vice President, Operations 9-10 May, 2016

Page 2: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Outline • Our Facilities • Our ATS Service Options • Selecting the ‘Right’ Service

Level • A Remote Service Approach

– Drivers – Business Case

• Developing a Remote Service Strategy – Strategy – Regulator – Flex Service

2

Page 3: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Our Facilities 7 Area Control Centres 41 Air Traffic Control Towers

38 Remote Flight Service Stations

55 Flight Service Stations

Page 4: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Our ATS Services Options • Airport Control Service • Airport Advisory Service – FSS • Remote Advisory Service –

RAAS • Flight Information Services –

FIC • Remote Weather Reporting –

(AWOS, LWIS, DWC)

• Remote Control Service - RTS

Page 5: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Total Aircraft Movements

20,000

40,000

60,000

7,500

May qualify for Airport Advisory Service provided from a Flight Service Station

MF-ATF Communication procedures may be in force

May qualify for Airport Control Service

Scheduled Aircraft Movements

AIRCRAFT MOV M NTS AIRPORT TRAFFIC S RVIC S CHART

Aircraft Movements Airport Traffic Services Chart

Page 6: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Selecting the ‘Right’ Service Level

• Level of Service Policy • Traffic

– Movements – Types – Complexity

• Business Case – Technology investment – Staffing – Existing infrastructure

• SAFETY – HIRA

6

Page 7: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Remote Services Approach

• Services provided from another location – Approach Control – Traffic – Weather – Vehicle Advisory Service

Page 8: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

What Drives a Remote Service Approach?

• Geography • Climate • Infrastructure

• Traffic • Cost efficiency • Technology

Page 9: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Making a Business Case for Remote Services

• Considerations: – Salaries, Benefits, Allowances – Facility Costs/Upgrades – Provision of

Telecom/Networking services – Service and maintenance

costs of sophisticated equipment

– Training

9

Page 10: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Business Case Examples • Scenario 1: Build a new or replacement ATC facility

– Costs for new medium size facility? – Average annual Operating costs approx?

• Scenario 2: Increase in Level of Service from Advisory to ATC

– Average Cost increase to transition from FSS to full ATC service – Addition of staff to provide remote service from existing tower

• Scenario 3: Combine Services from 2 ATC Towers

– Cost to operate two ATC towers of similar size – Addition of staff to provide remote services

• Scenario 4: Provide Remote Services from ACC Specialties – Additional Staff costs in the Area Control Centers – Training and licensing costs for ACC staff

10

Page 11: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Developing A Remote Services Strategy

• Support the service required • Put the right technology in place for the type of remote

operation • Incremental approach

Page 12: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Integration w/ ATC & Airport

Systems

Intelligent Video Applications

Remote Tower Toolbox

Page 13: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Integrated Tower Technology Remote or Otherwise

Page 14: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Remote Services Strategy (using video technology)

• Large Complex Airports • Video capabilities used equivalent to existing surface detection 1. Video Ground Surveillance

• Controlled Airports requiring enhanced “Out the Window View” • Enhanced control service with video for targeted areas, visual verification 2. Video Enhanced Control Service

• Advisory Airports requiring enhanced “Out the Window View” • Enhanced advisory service with video for targeted areas, visual verification 3. Video Enhanced Advisory Service

• Enhancing existing advisory services • Enhanced RAAS with video for seasonal peaks and to optimize LOS 4. Video Enhanced RAAS

• Airports that have a mixture of control and advisory service • Existing control services remoted to another location and/or to optimize LOS 5. Control Service Transfer

• Airports requiring RAAS • Existing advisory services remoted to another location and/or to optimize LOS 6. Advisory Service Transfer

• Airports requiring Control Service • Airport control services provided by a controller in a remote control facility 7. Remote Control Service

• Low density airports • Airport control services provided by enroute controller in a remote control facility 8. Enroute/Airport Control Service

Page 15: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Regulator Strategy

Task Analysis

SME Human Factors Standards & Procedures Safety Training

• Technical Requirements • Safety Case • Procedures / Manual of Operations • Training Package • HMI Development • Regulatory Approval

Business Cases Site Selections

Page 16: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Flex Service Solution • Provide ‘on-demand’ tower

control services from anywhere to anywhere. – Multiple low-volume sites

(midnight shift balancing/consolidation)

– Seasonal peaks ( tourism) – Single contingency operation for

multiple towers (tower evacuation, construction, etc.)

• Training efficiencies (fewer personnel)

• Standardized tower control toolset • No need to redeploy staff • Risk management

16

Page 17: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Remote Air Traffic Control in Canada Proof of Concept

• Joint Project: – NAV CANADA and Searidge

Technologies • Proof of Concept for Remote ATC

from Halifax to Fredericton (midnights)

• Using two currently staffed ATC Towers

• NAVCANsuite and Searidge Integrated Tower technology

• Project underway

Page 18: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

Keys to Success • Offer cost and operational efficiencies

– Focus on automation innovation and technology

• Use an incremental approach • Determine and develop procedures • Put the right technology in place for the type of operation • Involve employees at all stages • Communicate with the Regulator at all stages

Page 19: Vice President, Operations - International Civil Aviation ... 5... · Challenges of Remote Technologies Panel ICAO Remote ATS and RPAS Symposium Rob Thurgur Vice President, Operations

THANK YOU