Top Banner
Jeromy Markwort PACIFIC NORTHWEST NATIONAL LABORATORY A conversation of data, process and agriculture – www.aprecs.com/agx AGx © ApRecs. Trademarks property of their owners. 1-888-610-4230 - Published: Winter 14/15 Vertical Integration Drives The Need For Vertical Integration Drives The Need For Vertical Integration Drives The Need For Vertical Integration Drives The Need For Standardized Work & Enables Improvement Standardized Work & Enables Improvement Standardized Work & Enables Improvement Standardized Work & Enables Improvement
18

Vertical Integration Drives Need for Standardized Work & Enables Improvement

Jul 26, 2015

Download

Drew Zabrocki
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Vertical Integration Drives Need for Standardized Work & Enables Improvement

Jeromy MarkwortPACIFIC NORTHWEST NATIONAL LABORATORY

A conversation of data, process and agriculture – www.aprecs.com/agx

AGx© ApRecs. Trademarks property of their owners.

1-888-610-4230 - Published: Winter 14/15

Vertical Integration Drives The Need For Vertical Integration Drives The Need For Vertical Integration Drives The Need For Vertical Integration Drives The Need For

Standardized Work & Enables ImprovementStandardized Work & Enables ImprovementStandardized Work & Enables ImprovementStandardized Work & Enables Improvement

Page 2: Vertical Integration Drives Need for Standardized Work & Enables Improvement

How vertical integration drives the need for Standardized Work and enables improvement

JEROMY MARKWORT – LEAN COACH, PACIFIC NORTHWEST NATIONAL LABORATORY

December 16, 2014 45

AGx Three Rivers Convention Center Kennewick, WA

December 1st 2014

[email protected]@jmarkwort

PNNL-SA-106947

Page 3: Vertical Integration Drives Need for Standardized Work & Enables Improvement

Background

Vertical integration example

Challenges

Shift from Manage By Objectives to Manage By Means with focus on staff development

Understand “OK” vs. “Not OK”

Grasp the situation

Standardize

Coach staff to ID opportunities for improvement

PDCA for the win

December 16, 2014 46

Outline

Page 4: Vertical Integration Drives Need for Standardized Work & Enables Improvement

The vertically integrated apple pie

Golden Delicious apples

No worms

Ripe

Un-blemished

Clean

Firm

Consistent size/taste

How do we think from our customers’ needs

backward, not from our assets forward?

–Steve Bell

Page 5: Vertical Integration Drives Need for Standardized Work & Enables Improvement

What are the challenges?

Page 6: Vertical Integration Drives Need for Standardized Work & Enables Improvement

Making sure what we make is what they want

12/16/2014 49

Page 7: Vertical Integration Drives Need for Standardized Work & Enables Improvement

Rework

12/16/2014 50

Making sure what we make is what they want

Page 8: Vertical Integration Drives Need for Standardized Work & Enables Improvement

We must first have a shared understanding of "OK," "Not

OK"

UNDERSTAND THE DIRECTION

Page 9: Vertical Integration Drives Need for Standardized Work & Enables Improvement

Where are we today?

UNDERSTAND THE GAP

Page 10: Vertical Integration Drives Need for Standardized Work & Enables Improvement

You can't get there from here…

HOW DO WE GET THROUGH UNCERTAINTY TO OUR GOAL?

Page 11: Vertical Integration Drives Need for Standardized Work & Enables Improvement

Standardize our processes in order to deliver consistent

results

Page 12: Vertical Integration Drives Need for Standardized Work & Enables Improvement

Standard Work Vs.

Documentation

DATA AND FACTS

Not scrapbooking

for the business!

Page 13: Vertical Integration Drives Need for Standardized Work & Enables Improvement

Standardized Work as the "current best known way to do

the work”

December 16, 2014 56

Page 14: Vertical Integration Drives Need for Standardized Work & Enables Improvement

Once our process has been stabilized/standardized, now

look to improve

Page 15: Vertical Integration Drives Need for Standardized Work & Enables Improvement

What are the obstacles? What are the opportunities for

improvement?

December 16, 2014 58

Page 16: Vertical Integration Drives Need for Standardized Work & Enables Improvement

Manage By Objectivesto

Manage By Means

Page 17: Vertical Integration Drives Need for Standardized Work & Enables Improvement

Experimentation: Shewhart Cycle

60

Title

Plan

Do

Check Adjust

A3 thinking

Page 18: Vertical Integration Drives Need for Standardized Work & Enables Improvement

Books

Lean Thinking, Womack and Jones

Toyota Kata, Rother

The Lean Startup, Ries

2 Second Lean, Akers

Videos

Meals Per Hour, Toyota helps a food bank improve efficiency

Lean is simple, Paul Akers

December 16, 2014 61

Resources