VeriSTAR Project ManagementIntoduction

February 2009

Page 2: VeriSTAR Project Management Intoduction February 2009.

2VPM Introduction

1- What is VPM ?

2- Main objectives

3- Features

4- Animation

5-

Table of content

Page 3: VeriSTAR Project Management Intoduction February 2009.

What is VPM

Page 4: VeriSTAR Project Management Intoduction February 2009.

4VPM Introduction

What is VeriSTAR Project Management ?

www.Veristarpm.com

•A WEB based collaborative platform for Project management where all actors ( depending on assigned rights) can review, edit and exchange information on real-time basis.

. Initially developped, within Marine Division of Bureau Veritas, for the management of New construction and its transversal activities, it has been extended to some specific activities of Ship in Service

Page 5: VeriSTAR Project Management Intoduction February 2009.

Main objectives

Page 6: VeriSTAR Project Management Intoduction February 2009.

6VPM Introduction

Main objectives of VPM

VPM

Efficieny increase

Quality

improvement

Added services

to client

Page 7: VeriSTAR Project Management Intoduction February 2009.

7VPM Introduction

Main objectives

- Increasing the efficiency of our services :

- introducing a production tool

- Sharing Data (Collaborative Platform)

- Changing from a Reactive attitude to a Creative approach

- Improving the Quality

- Pertinency: using relevant references and data

- Traceability: Keeping trace of our interventions

- Transparency: Open to all actors

- Eliminating the redundancies

- Service plus to Clients

- Opening access to the concerned projects

- Communicating thru BV working Platform

- Managing additional services not related to Classification

Page 8: VeriSTAR Project Management Intoduction February 2009.

Features

Page 9: VeriSTAR Project Management Intoduction February 2009.

9VPM Introduction

Features: Type of projects

Different type of projects handled by VPM includes:

- New construction of Ships / Offshore platforms (NC)

- Design assessment (DWG, PDR)

- Product certification (PRC)

- AIS ( Alternative Scheme of Inspection)

- NDC ( Non dedicated certification: Non linked to a project)

- Conversion of units ( NS)

- Follow up of the maintenance on existing vessels/Platforms ( Asset Integrity Management System: AIMS)

Page 10: VeriSTAR Project Management Intoduction February 2009.

10VPM Introduction

Features: Global approach

FOR ALL TYPE OF PROJECT

CONTRACT REVIEW:

- Identification of clients

- Definition of the required services

- References to apply

- Actions and tasks to perform

PERFORMANCE

- Identification of actions, management of outstandings

REPORTING:

- Report

- Certificates,

INVOICING

DASHBOARDS

FEED BACK

Page 11: VeriSTAR Project Management Intoduction February 2009.

11VPM Introduction

WWW.Veristarpm.com

New construction Shelf Products

Reference:Request for Classification (Class &Statutory)

Reference:Customerrequirements

Automatically generated Project and manually customized

Manual entry

Survey at yardSurvey at yard Design reviewDesign review Product CertificationProduct Certification

VPM Database

BVN

Follow up / Certificates / Reports

Independent project

Ship in service

Reference:Suppliersrequirements

LPO

Manual entry

SAY

NC NS, PRC,AIS PDR,DWG NDC

Page 12: VeriSTAR Project Management Intoduction February 2009.

12VPM Introduction

Features: Actors

Project leader / manager Product Certification (BVN)

Survey of Construction (SAY)Design review (LPO)

Shipyard/ConsultantOwner

Equipment supplier

BV Actors

External Actors

Applicant for Product certification

Page 13: VeriSTAR Project Management Intoduction February 2009.

New construction projects

Page 14: VeriSTAR Project Management Intoduction February 2009.

14VPM Introduction

Features: BASIC CONCEP FOR NEW CONSTRUCTION

A Project is managed through its complete lifecycle

- Definition of the contract :"Project data"

- Validation of the conception: "Design review" activity

- Certification of the Material / Equipment:" Product certification (BVN)" activity

- Survey of the Construction: "Survey At Yard" activity

- Delivery & transfer of Ship's file to "Ship in service"

Page 15: VeriSTAR Project Management Intoduction February 2009.

Animation

Page 16: VeriSTAR Project Management Intoduction February 2009.

16VPM Introduction

BV Marine contact

Owner

Yard Manufacturer

New Construction

VeriSTAR Project ManagementNew BuildingProject Setup

Actions

Exchange of DocumentsNot covered by NB

Page 17: VeriSTAR Project Management Intoduction February 2009.

17VPM Introduction

Owner

Yard Manufacturer

Request For Class

New Construction

BV Project leader

• Creates Request• Assigns P L

VeriSTAR Project ManagementNew BuildingProject Setup

Actions

Exchange of DocumentsNot covered byVNB

BV Marine contact

Page 18: VeriSTAR Project Management Intoduction February 2009.

18VPM Introduction

BV Marine contact

Owner

Yard Manufacturer

Request For Class

New Construction

• Initiates Projects

• Creates Request• Assigns PL

VeriSTAR Project ManagementNew BuildingProject Setup

BV Project Leader

Actions

Exchange of DocumentsNot covered by NB

Page 19: VeriSTAR Project Management Intoduction February 2009.

19VPM Introduction

Owner

Yard Manufacturer

BVNSAYLPO

Product CertificationSurvey At YardDesign Review

• Registers documents• Assigns BVN centres• Assignes Contacts• Monitors progress• Generate progress reports

BV Project Leader

Request For Class

New Construction

• Initiates Projects

• Creates Request• Assigns P L

• Customizes projects

VeriSTAR Project ManagementNew BuildingProject Setup

Checklists (customized)

Actions

Exchange of DocumentsNot covered by NB

BV Marine contact

Page 20: VeriSTAR Project Management Intoduction February 2009.

20VPM Introduction

BV Marine Manager

Owner

Yard/Consultant Manufacturer

BVNSAYLPO

Product CertificationSurvey At YardDesign Review

• Registers drawings• Reviews drawings• Generate progress reports• Records status, comments• Identifies categories)

• Registers documents• Assigns BVN centres• Assignes Contacts• Monitors progress• Generate progress reports

BV Project Leader

Request For Class

New Construction

• Initiates Projects

• Creates Request• Assigns PL

• Customizes projects

VeriSTAR Project Management New BuildingDesign review

Checklists (customized)

Actions

Exchange of DocumentsNot covered by NB

Page 21: VeriSTAR Project Management Intoduction February 2009.

21VPM Introduction

BV Marine Manager

Owner

Yard Manufacturer

BVNSAYLPO

Product CertificationSurvey At YardDesign Review

• Registers drawings• Reviews drawings• Generate progress reports• Records status, comments• Identifies categories

• Registers documents• Assigns BVN centres• Assignes Contacts• Monitors progress• Generate progress reports

BV Project Leader

Request For Class

New Construction

• Initiates Projects

• Creates Request• Assigns P M

• Customizes projects

VeriSTAR Project ManagementNew BuildingBVN

Checklists (customized)

RequestforCertification

AdviseManufacturer

• Create product folder for shelf products• Identifies products in a project• Initiate design review• Submits drawings to LPO• Creates/ manages comments• Completes product folder• Generate reports of inspection• Issues certificates

Product Design Review

Actions

Exchange of DocumentsNot covered by NB

Purchase orders(Short list)

Page 22: VeriSTAR Project Management Intoduction February 2009.

22VPM Introduction

BV Marine Manager

Owner

Yard Manufacturer

BVNSAYLPO

Product CertificationSurvey At YardDesign Review

• Monitors surveys• Manages comments

• Registers drawings• Reviews drawings• Generate progress reports• Records status, comments• Identifies categories

• Registers documents• Assigns BVN centres• Assignes Contacts• Monitors progress• Generate progress reports

BV Project Leader

Request For Class

New Construction

• Initiates Projects

• Creates Request• Assigns P M

• Customizes projects

VeriSTAR Project ManagementNew BuildingSURVEY AT YARD

Checklists (customized)

RequestforCertification

AdviseManufacturer

• Create product folder for shelf products• Identifies products in a project• Initiate design review• Submits drawings to LPO• Creates/ manages comments• Completes product folder• Generate reports of inspection• Issues certificates

Product Design Review

Actions

Exchange of DocumentsNot covered by NB

Request for surveyCommentsdocuments

Page 23: VeriSTAR Project Management Intoduction February 2009.

23VPM Introduction

Client for Product Certification Manufacturer

BV Project ManagerNew Construction

• Creates projects

VeriSTAR Project ManagementIndependant projectProduct certification

RequestforCertification

Exchange of Documents

Actions

Not covered by NB

Page 24: VeriSTAR Project Management Intoduction February 2009.

24VPM Introduction

Client for Product Certification Manufacturer

BVN

Product Certification

• Registers documents• Assigns BVN centres• Assignes Contacts• Monitors progress• Generate progress reports

BV Project ManagerNew Construction

Product Certification

• Creates projects

Checklists (customized)

RequestforCertification

Exchange of Documents

Actions

Not covered by NB

VeriSTAR Project ManagementIndependant projectProduct certification

Page 25: VeriSTAR Project Management Intoduction February 2009.

25VPM Introduction

Client for Product Certification Manufacturer

• Create product folder for shelf products• Identifies products in a project• Initiate design review• Submits drawings to LPO• Creates/ manages comments• Completes product folder• Generate reports of inspection• Issues certificates

BVNLPO

Product CertificationDesign Review

• Registers drawings• Reviews drawings• • Records status, comments

• Registers documents• Assigns BVN centres• Assignes Contacts• Monitors progress• Generate progress reports

BV Project ManagerNew Construction

Product Certification

Product Design Review

• Creates projects

Checklists (customized)

RequestforCertification

AdviseManufacturer

RequestforCertification

Exchange of Documents

Actions

Not covered by NB

VeriSTAR Project ManagementIndependant projectProduct certification

Page 26: VeriSTAR Project Management Intoduction February 2009.

26VPM Introduction

Manufacturer

BVN HO Manager

New Construction

• Creates projects• Assigns Project Manager

Request for Alternative Inspection Scheme

Exchange of Documents

Actions

Not covered by NB

VeriSTAR Project ManagementIndependant projectAlternative Inspection Scheme

Page 27: VeriSTAR Project Management Intoduction February 2009.

27VPM Introduction

Manufacturer

BVN HO Manager

BV Project Manager

BV Mode 1

New Construction

• Creates projects• Assigns Project Manager

Request for Alternative Inspection Scheme

Exchange of Documents

Actions

Not covered by NB

VeriSTAR Project ManagementIndependant projectAlternative Inspection Scheme

• Creates projects

Page 28: VeriSTAR Project Management Intoduction February 2009.

28VPM Introduction

Manufacturer

BVN HO Manager

BV Project Manager

BV Mode 1

New Construction

• Creates projects• Assigns Project Manager

Product Design Review

• Customizes projects

Request for Alternative Inspection SchemeSubmitCertificate/Supporting doc.

Exchange of Documents

Actions

Not covered by NB

VeriSTAR Project ManagementIndependant projectAlternative Inspection Scheme

Validate Certificat

Page 29: VeriSTAR Project Management Intoduction February 2009.

29VPM Introduction

LPO

Design Review

Creates Projects Registers drawings• Reviews drawings• Generate progress reports• Records status, comments

BV Project ManagerNew Construction

Drawing

Exchange of Documents

Actions

Not covered by NB

Request for

Design Review

VeriSTAR Project ManagementIndependant projectDesign Review

Yard/Consultant

Page 30: VeriSTAR Project Management Intoduction February 2009.

30VPM Introduction

BV Marine contact

Owner

Yard/consultantClient for Product

Certification Manufacturer

BVN HO Manager

• Create product folder for shelf products• Identifies products in a project• Initiate design review• Submits drawings LPO• Creates/ manages comments• Completes product folder• Generate reports of inspection• Issues certificates• Endorses Certificate of Conformity

BVNSAYLPO

Product CertificationSurvey At YardDesign Review

• Monitors surveys• Manages comments

• Registers drawings• Reviews drawings• Generate progress reports• Records status, comments• Identifies categories

• Creates Projects (drawing or product design)

• Registers documents• Assigns BVN centres• Assignes Contacts• Monitors progress• Generate progress reports

BV Project Leader/Manager

Request For Class

BV Mode 1

New Construction

Product Certification

• Creates projects• Assigns Project Manager

Drawing

• Initiates Projects

• Creates Request• Assigns P M

Product Design Review

• Creates projects

• Customizes projects

VeriSTARNew Building

Checklists (customized)

Request for Alternative Inspection Scheme

RequestforCertification

AdviseManufacturer

RequestforCertification

Request for

Design Review

Exchange of Documents

Actions

Not covered by NB

ChecklistsPurchase orders

Submit

Validate

Page 31: VeriSTAR Project Management Intoduction February 2009.

31VPM Introduction

Questions, comments

•Questions ?

Page 32: VeriSTAR Project Management Intoduction February 2009.

32VPM Introduction

VeriSTARNew Building

END