VenjarSørli Project Supplier meeting 2017-02-02 Lien - Andersen
19

Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

Aug 30, 2019

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

Venjar–Sørli Project

Supplier meeting 2017-02-02

Lien - Andersen

Page 2: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

Venjar – Sørli Project

• The project is part of the InterCity section between Oslo and Hamar – construction of new double tracks

• Construction completed in 2024

• Venjar – Langset

• Kleverud – Sørli

2

Page 3: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

Venjar – Langset Project It has been decided to implement the project with the following construction contracts:

• An execution contract for substructure/ground works and technical railway installations Venjar – Eidsvoll North

• An execution contract for substructure/ground works and technical railway installations Eidsvoll North – Langset

• Extension of the interlocking system on the Gardermoen Line

• An EPC contract for new signalling system on the Dovre Line

3

Page 4: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

IC Venjar – Langset milestones

4

Page 5: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

Investments Venjar – Langset

5

Proj. No: Project name Line section Contract

signing

Constructio

n start

Duration (number of

years)

Preparatory work all disciplines Dovre Line ongoing

VE Venjar – Eidsvoll Gardermoen/

Dovre lines

2018 2018

5

EL Eidsvoll – Langset

Dovre Line 2018 2018

5

Signalling system Eidsvoll – Langset Dovre Line 2021 2021 3

Signalling system Gardermoen Line Gardermoen Line 2017 2020 4

Page 6: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

6

Railway power supply & overhead contact line

Delivery of the railway power supply including:

• New switching post Eidsvoll

• Number of switches 7 x 1p and 11 x 2p.

Delivery of the overhead contact line system including:

• Auto transformers (AT) x 4

• Overhead contact line for all new and temporary tracks, approx. 21 km

Page 7: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

7

Electrical power supply 50 Hz

22 kV high voltage distribution network:

• Transformers 22 kV x 6

• High voltage switchgear x 6

• High voltage cables approx. 10 km

Page 8: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

8

Low voltage power supply 50 Hz system

• Equipment in technical buildings, prefabricated kiosks and radio kiosks

• Backup power supply and emergency power supply systems

• Power supply for signalling system, telecom system

• Power supply for disconnector switches

• Point heaters

• Pumping system

• Fire alarm system

• Control, regulation and monitoring systems (SRO)

• Lighting equipment

• Ventilation

Page 9: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

9

Telecommunications

Several of the installations in the points below are supplied as part of the frame contract with the contractor.

• Cable system for transport network, access network, tunnels, external parties and local networks

• Radio installation

• Radio masts

• Transmission system

• Telecom room and

access control

Page 10: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

Kleverud – Sørli Project

Contract strategy

• Preparatory works

• EPC contracts

• An interdisciplinary EPC contract for Kleverud – Tangen which includes the Hestnes tunnel and Tangenvika railway bridge. Includes technical railway work for the entire Kleverud – Sørli section, excluding signalling.

• EPC contract for substructure/ground works for Tangen – Sørli, including the new Tangen Station.

• An EPC contract for new signalling system.

10

Page 11: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

IC Kleverud – Sørli milestones

11

Page 12: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

Investments Kleverud – Sørli

12

Proj. No: Project name Line section Contract

signing

Constructio

n start

Duration (number of

years)

Preparatory work all disciplines Dovre Line 2017

KS-01 EPC contract Kleverud – Sørli Dovre Line 2018 2018 5

KS-02 EPC contract Tangen – Sørli Dovre Line 2019 2019 4

Thales subcontracts under framework

agreement

Dovre Line 2021 2022 2

Page 13: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

13

Railway power supply & overhead contact line Delivery of the railway power supply includes the following:

• Section limitation switch gear x 2

Delivery of the overhead contact line system includes the following:

• Auto transformers (AT) x 6

• Overhead contact line/AT for all new and temporary tracks, approx. 36 km

• Switch gear, cables and connections to switch gear x 26

Page 14: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

14

Electrical power supply 50 Hz

22 kV high voltage power supply :

• Transformers 22/11kV x 8

• High voltage switch gear x 7

• High voltage cables approx.18 km

Page 15: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

15

Low voltage power supply 50 Hz

• Equipment in technical buildings, prefabricated kiosks and radio kiosks

• Backup power supply and emergency power supply systems

• Power supply for signalling system, telecom system

• Power supply for disconnector switches

• Point heaters

• Pumping system

• Fire alarm system

• Control, regulation and monitoring systems (SRO)

• Lighting equipment

• Ventilation

• Hestnes Tunnel – emergency lighting

and emergency concept

Page 16: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

16

Telecommunications

Several of the installations in the points below are supplied as part of the frame contract with the contractor.

• Cable system for transport network, access network, tunnels, external parties and local network

• Radio installation in tunnel

• Radio masts

• Transmission system

• Passenger Information System (PIS system)

• Camera surveillance system (CCTV system)

• Hearing induction loop

• Ticketing system

• Telecom room (construction client and external) and access control

• Telecom centre at Espa

Page 17: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

17

Tangen Station Installations at the new Tangen Station, including parking spaces with electric vehicle charging sockets, lighting, snow melting system, heating system, passenger information system and ticketing system.

Page 18: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

18

Page 19: Venjar Sørli Project - banenor.no · VE Venjar – Eidsvoll Gardermoen/ Dovre lines 2018 2018 5 EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset

Thank you for your attention!