Top Banner
VELO RF box status at Nikhef Report at the Meeting for new VELO RF foil development Tjeerd Ketel, Erno Roeland a.o., Nikhef 29-03-2011 1 Tjeerd Ketel, Nikhef
8

VELO RF box status at Nikhef

Feb 23, 2016

Download

Documents

Ayame

VELO RF box status at Nikhef. Report at the Meeting for new VELO RF foil development Tjeerd Ketel, Erno Roeland a.o ., Nikhef . Activities in 2010. After a failure in February 2010 to produce a complete leak-tight RF box, we decided to produce a flat box to save on prepared foils. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: VELO RF box status at Nikhef

Tjeerd Ketel, Nikhef 1

VELO RF box status at Nikhef

Report at the Meeting for new VELO RF foil development

Tjeerd Ketel, Erno Roeland a.o., Nikhef

29-03-2011

Page 2: VELO RF box status at Nikhef

Tjeerd Ketel, Nikhef 2

Activities in 2010• After a failure in February 2010 to produce a complete leak-tight

RF box, we decided to produce a flat box to save on prepared foils.– Longer foil extension (4 mm) for welding.– Improvements welding machine.– More flanges (4) milled at the VU.– Inventory of the side foils.

• More manpower promised in May.– New welding machine. Optimization to avoid tiny cracks (leaks) at long

welds.• Flat box is tested in October. It leaks at all corners!

– Corner tests started.– First additional foil pressed at Nikhef.

29-03-2011

Page 3: VELO RF box status at Nikhef

Tjeerd Ketel, Nikhef 3

Activities in 2011

• Prepare side foils for 10 boxes (40 in total).– Ready minus 2 side foils.

• Prepare 7 left and 7 right RF foils.– Still 3+3 to be pressed.

• Produce 6 test cubes (48 corners).– Improvements in first welds.– Improvements in repair, including AlSi addition.

• Produce complete RF boxes.– First in preparation.

29-03-2011

Page 4: VELO RF box status at Nikhef

Tjeerd Ketel, Nikhef 4

The test cubes

1 2 3 4

5 6

29-03-2011

Page 5: VELO RF box status at Nikhef

Tjeerd Ketel, Nikhef 5

Cubes 1-6• Cube 1:

– Test of flat foils, without good cooling contact.• Cube 2:

– 12A. All corners bad. Both solder and weld added. Repair failed• Cube 3:

– 17A. All corners bad. Little cracks. Repairs failed.• Cube 4:

– 19A. Three corners bad. Weld added. One repaired.– Continue with 19 A for the rest.

• Cube 5.– One corner bad. Welded again. Still small leak.

• Cube 6. – Four corners bad. AlSi added. Three repaired. One small leak.

29-03-2011

Page 6: VELO RF box status at Nikhef

Tjeerd Ketel, Nikhef 6

Cubes 5-6

29-03-2011

Page 7: VELO RF box status at Nikhef

Tjeerd Ketel, Nikhef 7

RF box

29-03-2011

Page 8: VELO RF box status at Nikhef

Tjeerd Ketel, Nikhef 8

Conclusion and outlook

• Cube tests improved the welding quality and showed repair with welding AlSi wire.

• Start now with a real box.• Improve on repair simultaneously.• Production rate of one box per month,

foreseen but not yet realized.

29-03-2011