Page 1: Van winkle  portfolio 2012-03

KAREN VAN WINKLESample Projects Portfolio

Page 2: Van winkle  portfolio 2012-03

Eastern Mangroves

Karen Van WinkleAbu Dhabi, UAE

Page 3: Van winkle  portfolio 2012-03

Eastern Mangroves• Mixed use development on a 1.2 km site• Incorporates elements of Arabic design, culture and lifestyle• Site contains a total of 138,000 m2 of gross floor area with an

additional 3,000m2 of ancillary building space Responsible for:• Code evaluation and compliance assurance• Troubleshooting and value engineering in construction• Re-design of restaurants and retail areas• Apartment re-design and coordination• Hotel facade redesign and spa coordination

Page 4: Van winkle  portfolio 2012-03

Eastern Mangroves

Energy Center Luxury Hotel Marina Chandlery

50 ApartmentsGym and pool

224 keysThai RestaurantAll Day Dining3 Club LoungesRooftop Bar

92 ApartmentsGym and pool14 Retail spaces Seafood Restaurant

77 ApartmentsGym and pool

Page 5: Van winkle  portfolio 2012-03

Eastern Mangroves

Page 6: Van winkle  portfolio 2012-03

Camden TuscanyKaren Van Winkle

Camden TuscanyKaren Van Winkle

San Diego, CA USA

Page 7: Van winkle  portfolio 2012-03

Camden Tuscany160 Unit mixed-use building 6 stories over 2 levels of parkingConcrete and Steel construction

Responsible for:• Design Development• Re-work from 4 story wood

to 6 story steel• Extensive value

engineering• Construction Documents

from beginning to end• Full coordination of all

disciplines including over 500 columns per floor

• Construction administration and quality control

• Specification and product selection

Page 8: Van winkle  portfolio 2012-03

Camden Tuscany

Page 9: Van winkle  portfolio 2012-03

Camden Tuscany

Camden Tuscany

Page 10: Van winkle  portfolio 2012-03

Karen Van WinkleLos Angeles, CA USA

Page 11: Van winkle  portfolio 2012-03

• Phase One of two phases, 580 total units

• $189M total construction cost

• 264 units – 825 sf average

• 4 story wood structure surrounding 6 story garage

Responsible for:• Construction

Document Management/Coordination

• Full coordination of all disciplines

• Construction administration and quality control

• Specification and product selection

• Value Engineering

Page 12: Van winkle  portfolio 2012-03

CARILLON

Page 13: Van winkle  portfolio 2012-03

CARILLON

Page 14: Van winkle  portfolio 2012-03

Pacific Highlands Ranch ClubhouseKaren Van Winkle

Del Mar, CA

Page 15: Van winkle  portfolio 2012-03

Pacific Highlands Ranch Clubhouse

Page 16: Van winkle  portfolio 2012-03

Pacific Highlands Ranch Clubhouse

Page 17: Van winkle  portfolio 2012-03

Gallery at Central ParkKaren Van Winkle

Santa Clara, CA USA

Page 18: Van winkle  portfolio 2012-03

Gallery at Central Park833 Unit, Multi product Master Plan

(2) 4-story Wrap Apartment Buildings - 583 units3-story Cluster Townhomes – 152 for sale units3-story Row Townhomes – 73 for sale unitsAlley loaded single family – 25 unitsResponsible for:Full Product DevelopmentDesign DevelopmentEntitlement negotiations with City of Santa Clara and neighborhood outreach. Feasibility studiesModel review and supervisionGreen Building ElementsColor and Specification Selection

Page 19: Van winkle  portfolio 2012-03

Karen Van Winkle

Karen Van WinkleLa Mesa, CA USA

Page 20: Van winkle  portfolio 2012-03

PRAVADA

• Phase One of two phases - 527 total unit mixed use, LEED Silver project with 100kw solar and 45k sf retail

• $141M total construction cost• 338 units – 895 sf average • 325,000 rentable sf – 933 parking stalls• 3 and 4 story wood structures over 2 level concrete

parking garage/podiumResponsible for:• Extensive value engineering• Construction Document Management/Coordination• Full coordination of all disciplines• Construction administration and quality control• Specification and product selection• LEED Retrofit Supervision and Coordination

Page 21: Van winkle  portfolio 2012-03

PRAVADA

Page 22: Van winkle  portfolio 2012-03

PRAVADA

Page 23: Van winkle  portfolio 2012-03

Chula Vista High

Performing Arts CenterLibrarySports facility refurbish

Chula Vista, CA USA

Page 24: Van winkle  portfolio 2012-03

Southwest Middle School

New classrooms 8,690 sf Modernization 20,695 sf • Library• Locker facilities• Administration

Imperial Beach, CA USA

Page 25: Van winkle  portfolio 2012-03

Hilltop High School

Science classrooms 16,147sfIndustrial technology building 5,896sfReplace 4 classroom buildings 8,690sf

Chula Vista, CA USA