Top Banner
Value Engineering
16
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Value engineering _2_

Value Engineering

Page 2: Value engineering _2_

Definition

• Value engineering (VE) is a systematic and organized approach to provide the necessary functions in a project at the lowest cost.

• It promotes the substitution of materials and methods with less expensive alternatives, without sacrificing functionality.

• It is focused solely on the functions of various components and materials, rather than their physical attributes.

• Also called value analysis. • Value is the ratio of function to cost.

Therefore, VALUE = FUNCTION / COST .

Page 3: Value engineering _2_

Apr 18, 2023 Group 1 (VALUE ENGINEERING) 3

VALUE CONCEPT

QUALITY

COSTFUNCTION

Value is an effective balance between the Quality, the Function and the Cost as shown in the given figure:

Page 4: Value engineering _2_

Importance Of VE

Value Engineering can improve decision-making. It leads to optimal expenditure of owner funds

while meeting required function and quality level.

The success of the Value Engineering process is due to its ability to identify opportunities to remove unnecessary costs while assuring quality, reliability, performance and other critical factors that meet or exceed customers expectation.

Page 5: Value engineering _2_

The Job Plan

• Value engineering is often done by systematically following a multi-stage job plan.•  Depending on the application, there may be four, five, six, or more stages.

Page 6: Value engineering _2_

Four basic steps in the job plan are:

• Information gathering - This asks what the requirements are for the object. Function analysis, an important technique in value engineering, is usually done in this initial stage. It tries to determine what functions or performance characteristics are important. It asks questions like;

What does the object do? What must it do?What should it do? What could it do?What must it not do?

Page 7: Value engineering _2_

• Alternative generation (creation) - In this stage value engineers ask;

What are the various alternative ways of meeting requirements?

What else will perform the desired function?

• Evaluation - In this stage all the alternatives are assessed by evaluating how well they meet the required functions and how great the cost savings will be.

• Presentation - In the final stage, the best alternative will be chosen and presented to the client for final decision.

Page 8: Value engineering _2_

How it works

VE follows a structured thought process to evaluate options as follows.

Gather information• What is being done now?• Who is doing it?• What could it do?• What must it not do?Measure• How will the alternatives be measured?• What are the alternate ways of meeting

requirements?• What else can perform the desired function?

Page 9: Value engineering _2_

Analyze• What must be done?• What does it cost?Generate• What else will do the job?Evaluate• Which Ideas are the best?Develop and expand ideas• What are the impacts? • What is the cost? • What is the performance?Present ideas• Sell alternatives

Page 10: Value engineering _2_

Diagram showing Value Engineering

Page 11: Value engineering _2_

Example of Value Engineering

When a product incorporates a computer, it replaces many parts with software that fits into a single light-weight, low-power memory part or microcontroller. As computers grow faster, digital signal processing software is beginning to replace many analog electronic circuits for audio and sometimes radio frequency processing.

Page 12: Value engineering _2_

Case Study: Centex Homes of Dallas, Texas

Over a period of five years Centex Homes, one of the nation’s top ten homebuilders, applied value-engineering methods to save over one billion dollars.

They did it by:• Actively seeking input from suppliers and contractors;• Red-lining to perfection;• Improving communication with contractors and suppliers, to

avoid mistakes;• Focusing on unit pricing of material and labor;• Splitting purchasing into materials and labor and avoiding turn-

key operations whenever possible;• Avoiding over-engineering;• Challenging suppliers and contractors to justify increases; and• Scheduling aggressively to shorten cycle time.

Page 13: Value engineering _2_

This made it possible for Centex to:• Reduce the structure cost of their

homes from 60% to 50% of sales price,

• Lower direct construction costs by nearly $8,000,

• Negotiate $800 per home in rebates, and

Source: Randy Luther, Vice President of Construction Technology, Centex Homes

Page 14: Value engineering _2_

If a value analysis approach is followed the company should reap huge benefits

including:

A reduction in costs but not in quality

Improving product quality and attracting more customers

Increased sales might lead to economies of scale and either increase profits or reduce selling prices

The company may decide to increase selling prices if the quality has improved

Page 15: Value engineering _2_

Thus it can be concluded that...

• Value analysis is not an exact science, and there is no one approach that fits all situations.

• Companies operate in a dynamic environment and need to be able to accommodate the emergence of new products, new competitors, and changing economic circumstances.

• Value analysis is simply one of the many tools available to companies when balancing costs, price and profit.

Page 16: Value engineering _2_