VALORIZACIÓN ADICIONAL DE OBRA N°03 - PINTURA (PERIODO 15.02.13 AL 21.02.2013) VALORIZACION N°03 OBRA RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS CONTRATISTA: BAEZ CONSUL SAC FECHA 2/1/2013 RESIDENTE : MRFH / JSVH Ítem Partidas PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por Ejecutar Und. Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar 1.00.00 PINTURA 1.08.00 PINTURA RETOQUE EXTERIORES 1.08.01 PINTURA M2 1,200.00 3.00 3,600.00 700.00 2,100.00 350.00 1,050.00 1,050.00 3,150.00 87.50% 150.00 450.00 12.50% 1.08.00 PINTURA RETOQUE DUCTOS INTERIORES 1.08.01 PINTURA M2 1,500.00 3.00 4,500.00 700.00 2,100.00 350.00 1,050.00 1,050.00 3,150.00 70.00% 450.00 1,350.00 30.00% 1.08.00 PINTURA VARIOS INTERIORES 1.08.01 PINTURA M2 2,000.00 2.50 5,000.00 960.00 2,400.00 458.95 1,147.37 1,418.95 3,547.37 70.95% 581.05 1,452.64 29.05% 4,700.00 SUB-TOTAL 13,100.00 6,600.00 3,247.37 9,847.37 3,252.64 0.72 IGV 18% 2,358.00 1,188.00 584.53 1,772.53 585.47 0.07 TOTAL 15,458.00 7,788.00 3,831.89 11,619.89 75.17% 3,838.11 24.83% NUEVOS SOLES Costo Unitario S/. Parcial Monto de Valorización Total Monto de Valorización Total Monto de Valorización Total Monto de Valorización Total
29

Valorizacion Pintura Baez

Feb 11, 2016

Download

Documents

valorizacion pintura
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Valorizacion Pintura Baez

VALORIZACIÓN ADICIONAL DE OBRA N°03 - PINTURA(PERIODO 15.02.13 AL 21.02.2013)

VALORIZACION N°03OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 2/1/2013

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 PINTURA

1.08.00 PINTURA RETOQUE EXTERIORES

1.08.01 PINTURA M2 1,200.00 3.00 3,600.00 700.00 2,100.00 350.00 1,050.00 1,050.00 3,150.00 87.50% 150.00 450.00 12.50%

1.08.00 PINTURA RETOQUE DUCTOS INTERIORES

1.08.01 PINTURA M2 1,500.00 3.00 4,500.00 700.00 2,100.00 350.00 1,050.00 1,050.00 3,150.00 70.00% 450.00 1,350.00 30.00%

1.08.00 PINTURA VARIOS INTERIORES

1.08.01 PINTURA M2 2,000.00 2.50 5,000.00 960.00 2,400.00 458.95 1,147.37 1,418.95 3,547.37 70.95% 581.05 1,452.64 29.05%

4,700.00

SUB-TOTAL 13,100.00 6,600.00 3,247.37 9,847.37 3,252.64 0.72

IGV 18% 2,358.00 1,188.00 584.53 1,772.53 585.47 0.07

TOTAL 15,458.00 7,788.00 3,831.89 11,619.89 75.17% 3,838.11 24.83%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 2: Valorizacion Pintura Baez

VALORIZACIÓN ADICIONAL DE OBRA N°02 - PINTURA(PERIODO 15.02.13 AL 21.02.2013)

VALORIZACION N°02OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 2/22/2013

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 PINTURA

1.08.00 PINTURA RETOQUE EXTERIORES

1.08.01 PINTURA M2 1,200.00 3.00 3,600.00 350.00 1,050.00 350.00 1,050.00 700.00 2,100.00 58.33% 500.00 1,500.00 41.67%

1.08.00 PINTURA RETOQUE DUCTOS INTERIORES

1.08.01 PINTURA M2 1,500.00 3.00 4,500.00 350.00 1,050.00 350.00 1,050.00 700.00 2,100.00 46.67% 800.00 2,400.00 53.33%

1.08.00 PINTURA VARIOS INTERIORES

1.08.01 PINTURA M2 2,000.00 2.50 5,000.00 480.00 1,200.00 480.00 1,200.00 960.00 2,400.00 48.00% 1,040.00 2,600.00 52.00%

4,700.00

SUB-TOTAL 13,100.00 3,300.00 3,300.00 6,600.00 6,500.00 1.47

IGV 18% 2,358.00 594.00 594.00 1,188.00 1,170.00 0.15

TOTAL 15,458.00 3,894.00 3,894.00 7,788.00 50.38% 7,670.00 49.62%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 3: Valorizacion Pintura Baez

VALORIZACIÓN ADICIONAL DE OBRA N°01 - PINTURA(PERIODO 08.02.13 AL 14.02.2013)

VALORIZACION N°01OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 2/14/2013

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 PINTURA

1.08.00 PINTURA RETOQUE EXTERIORES

1.08.01 PINTURA M2 1,200.00 3.00 3,600.00 - 350.00 1,050.00 350.00 1,050.00 29.17% 850.00 2,550.00 70.83%

1.08.00 PINTURA RETOQUE DUCTOS INTERIORES

1.08.01 PINTURA M2 1,500.00 3.00 4,500.00 - 350.00 1,050.00 350.00 1,050.00 23.33% 1,150.00 3,450.00 76.67%

1.08.00 PINTURA VARIOS INTERIORES

1.08.01 PINTURA M2 2,000.00 2.50 5,000.00 - 480.00 1,200.00 600.00 1,200.00 24.00% 1,400.00 3,500.00 70.00%

4,700.00

SUB-TOTAL 13,100.00 0.00 3,300.00 3,300.00 9,500.00 2.18

IGV 18% 2,358.00 0.00 594.00 594.00 1,710.00 0.22

TOTAL 15,458.00 0.00 3,894.00 3,894.00 25.19% 11,210.00 72.52%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 4: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°23 - PINTURA(PERIODO 01.02.13 AL 07.02.2013)

VALORIZACION N°23OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 2/7/2013

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 PINTURA

1.04.00 SOTANO 2

1.04.01 SOTANO 2 M2 550.00 5.00 2,750.00 550.00 2,750.00 - - 550.00 2,750.00 100.00% - - 0.00%

1.06.00 SOTANO 1

1.06.01 SOTANO 1 M2 550.00 5.00 2,750.00 550.00 2,750.00 - - 550.00 2,750.00 100.00% - - 0.00%

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 1

1.08.01 PINTURA 1 M2 1,100.00 6.00 6,600.00 1,065.00 6,390.00 35.00 210.00 1,100.00 6,600.00 100.00% - - 0.00%

1.08.00 PINTURA EXTERIORES

1.08.01 PINTURA EXTERIORES M2 1,523.00 8.00 12,184.00 1,500.00 12,000.00 23.00 184.00 1,523.00 12,184.00 100.00% - - 0.00%

1.08.00 PINTURA VECINOS

1.08.01 PINTURA EXTERIORES M2 2,000.00 6.00 12,000.00 1,923.00 11,538.00 77.00 462.00 2,000.00 12,000.00 100.00% - - 0.00%

1.08.00 PINTURA RETOQUE

1.08.01 PINTURA RETOQUE - DESPUES DE COLOCACION DE PUERTAS Y PISOS M2 8,000.00 2.00 16,000.00 6,800.00 13,600.00 1,200.00 2,400.00 8,000.00 16,000.00 100.00% - - 0.00%

17,473.92

SUB-TOTAL 81,389.52 78,133.52 3,256.00 81,389.52 0.00 0.00

IGV 18% 14,650.11 14,064.03 586.08 14,650.11 0.00 0.00

TOTAL 96,039.63 92,197.55 3,842.08 96,039.63 100.00% 0.00 0.00%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 5: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°22 - PINTURA(PERIODO 25.01.13 AL 31.01.2013)

VALORIZACION N°22OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 1/31/2013

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 PINTURA

1.04.00 SOTANO 2

1.04.01 SOTANO 2 M2 550.00 5.00 2,750.00 550.00 2,750.00 - - 550.00 2,750.00 100.00% - - 0.00%

1.06.00 SOTANO 1

1.06.01 SOTANO 1 M2 550.00 5.00 2,750.00 550.00 2,750.00 - - 550.00 2,750.00 100.00% - - 0.00%

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 1

1.08.01 PINTURA 1 M2 1,100.00 6.00 6,600.00 1,065.00 6,390.00 - - 1,065.00 6,390.00 96.82% 35.00 210.00 3.18%

1.08.00 PINTURA EXTERIORES

1.08.01 PINTURA EXTERIORES M2 1,523.00 8.00 12,184.00 1,500.00 12,000.00 - 1,500.00 12,000.00 98.49% 23.00 184.00 1.51%

1.08.00 PINTURA VECINOS

1.08.01 PINTURA EXTERIORES M2 2,000.00 6.00 12,000.00 1,923.00 11,538.00 - 1,923.00 11,538.00 96.15% 77.00 462.00 3.85%

1.08.00 PINTURA RETOQUE

1.08.01 PINTURA RETOQUE - DESPUES DE COLOCACION DE PUERTAS Y PISOS M2 8,000.00 2.00 16,000.00 5,200.00 10,400.00 1,600.00 3,200.00 6,800.00 13,600.00 85.00% 1,200.00 2,400.00 15.00%

17,473.92

SUB-TOTAL 81,389.52 74,933.52 3,200.00 78,133.52 3,256.00 0.24

IGV 18% 14,650.11 13,488.03 576.00 14,064.03 586.08 0.02

TOTAL 96,039.63 88,421.55 3,776.00 92,197.55 96.00% 3,842.08 4.00%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 6: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°21 - PINTURA(PERIODO 18.01.13 AL 24.01.2013)

VALORIZACION N°21OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 1/21/2013

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 PINTURA

1.04.00 SOTANO 2

1.04.01 SOTANO 2 M2 550.00 5.00 2,750.00 550.00 2,750.00 - - 550.00 2,750.00 100.00% - - 0.00%

1.06.00 SOTANO 1

1.06.01 SOTANO 1 M2 550.00 5.00 2,750.00 550.00 2,750.00 - - 550.00 2,750.00 100.00% - - 0.00%

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 1

1.08.01 PINTURA 1 M2 1,100.00 6.00 6,600.00 1,065.00 6,390.00 - - 1,065.00 6,390.00 96.82% 35.00 210.00 3.18%

1.08.00 PINTURA EXTERIORES

1.08.01 PINTURA EXTERIORES M2 1,523.00 8.00 12,184.00 1,500.00 12,000.00 - 1,500.00 12,000.00 98.49% 23.00 184.00 1.51%

1.08.00 PINTURA VECINOS

1.08.01 PINTURA EXTERIORES M2 2,000.00 6.00 12,000.00 1,923.00 11,538.00 - 1,923.00 11,538.00 96.15% 77.00 462.00 3.85%

1.08.00 PINTURA RETOQUE

1.08.01 PINTURA RETOQUE - DESPUES DE COLOCACION DE PUERTAS Y PISOS M2 8,000.00 2.00 16,000.00 3,600.00 7,200.00 1,600.00 3,200.00 5,200.00 10,400.00 65.00% 2,800.00 5,600.00 35.00%

17,473.92

SUB-TOTAL 81,389.52 71,733.52 3,200.00 74,933.52 6,456.00 0.44

IGV 18% 14,650.11 12,912.03 576.00 13,488.03 1,162.08 0.04

TOTAL 96,039.63 84,645.55 3,776.00 88,421.55 92.07% 7,618.08 7.93%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 7: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°20 - PINTURA(PERIODO 11.01.13 AL 17.01.2013)

VALORIZACION N°20OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 1/17/2013

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 PINTURA

1.04.00 SOTANO 2

1.04.01 SOTANO 2 M2 550.00 5.00 2,750.00 550.00 2,750.00 - - 550.00 2,750.00 100.00% - - 0.00%

1.06.00 SOTANO 1

1.06.01 SOTANO 1 M2 550.00 5.00 2,750.00 550.00 2,750.00 - - 550.00 2,750.00 100.00% - - 0.00%

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 1

1.08.01 PINTURA 1 M2 1,100.00 6.00 6,600.00 1,065.00 6,390.00 - - 1,065.00 6,390.00 96.82% 35.00 210.00 3.18%

1.08.00 PINTURA EXTERIORES

1.08.01 PINTURA EXTERIORES M2 1,523.00 8.00 12,184.00 1,500.00 12,000.00 - 1,500.00 12,000.00 98.49% 23.00 184.00 1.51%

1.08.00 PINTURA VECINOS

1.08.01 PINTURA EXTERIORES M2 2,000.00 6.00 12,000.00 1,923.00 11,538.00 - 1,923.00 11,538.00 96.15% 77.00 462.00 3.85%

1.08.00 PINTURA RETOQUE

1.08.01 PINTURA RETOQUE - DESPUES DE COLOCACION DE PUERTAS Y PISOS M2 8,000.00 2.00 16,000.00 1,600.00 3,200.00 2,000.00 4,000.00 3,600.00 7,200.00 45.00% 4,400.00 8,800.00 55.00%

17,473.92

SUB-TOTAL 81,389.52 67,733.52 4,000.00 71,733.52 9,656.00 0.64

IGV 18% 14,650.11 12,192.03 720.00 12,912.03 1,738.08 0.06

TOTAL 96,039.63 79,925.55 4,720.00 84,645.55 88.14% 11,394.08 11.86%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 8: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°19 - PINTURA(PERIODO 04.01.13 AL 10.01.2013)

VALORIZACION N°19OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 1/10/2013

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 PINTURA

1.04.00 SOTANO 2

1.04.01 SOTANO 2 M2 550.00 5.00 2,750.00 550.00 2,750.00 - - 550.00 2,750.00 100.00% - - 0.00%

1.06.00 SOTANO 1

1.06.01 SOTANO 1 M2 550.00 5.00 2,750.00 550.00 2,750.00 - - 550.00 2,750.00 100.00% - - 0.00%

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 1

1.08.01 PINTURA 1 M2 1,100.00 6.00 6,600.00 1,065.00 6,390.00 - - 1,065.00 6,390.00 96.82% 35.00 210.00 3.18%

1.08.00 PINTURA EXTERIORES

1.08.01 PINTURA EXTERIORES M2 1,523.00 8.00 12,184.00 1,500.00 12,000.00 - 1,500.00 12,000.00 98.49% 23.00 184.00 1.51%

1.08.00 PINTURA VECINOS

1.08.01 PINTURA EXTERIORES M2 2,000.00 6.00 12,000.00 1,923.00 11,538.00 - 1,923.00 11,538.00 96.15% 77.00 462.00 3.85%

1.08.00 PINTURA RETOQUE

1.08.01 PINTURA RETOQUE - DESPUES DE COLOCACION DE PUERTAS Y PISOS M2 8,000.00 2.00 16,000.00 - - 1,600.00 3,200.00 1,600.00 3,200.00 20.00% 6,400.00 12,800.00 80.00%

17,473.92

SUB-TOTAL 81,389.52 64,533.52 3,200.00 67,733.52 13,656.00 0.89

IGV 18% 14,650.11 11,616.03 576.00 12,192.03 2,458.08 0.09

TOTAL 96,039.63 76,149.55 3,776.00 79,925.55 83.22% 16,114.08 16.78%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 9: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°18 - PINTURA(PERIODO 28.12.12 AL 03.01.2013)

VALORIZACION N°18OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 1/3/2013

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 PINTURA

1.04.00 SOTANO 2

1.04.01 SOTANO 2 M2 550.00 5.00 2,750.00 550.00 2,750.00 - - 550.00 2,750.00 100.00% - - 0.00%

1.06.00 SOTANO 1

1.06.01 SOTANO 1 M2 550.00 5.00 2,750.00 550.00 2,750.00 - - 550.00 2,750.00 100.00% - - 0.00%

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 1

1.08.01 PINTURA 1 M2 1,100.00 6.00 6,600.00 1,065.00 6,390.00 - - 1,065.00 6,390.00 96.82% 35.00 210.00 3.18%

1.08.00 PINTURA EXTERIORES

1.08.01 PINTURA EXTERIORES M2 1,523.00 8.00 12,184.00 1,500.00 12,000.00 - 1,500.00 12,000.00 98.49% 23.00 184.00 1.51%

1.08.00 PINTURA VECINOS

1.08.01 PINTURA EXTERIORES M2 2,000.00 6.00 12,000.00 1,398.00 8,388.00 525.00 3,150.00 1,923.00 11,538.00 96.15% 77.00 462.00 3.85%

9,473.92

SUB-TOTAL 59,889.52 61,383.52 3,150.00 64,533.52 856.00 0.09

IGV 18% 10,780.11 11,049.03 567.00 11,616.03 154.08 0.01

TOTAL 70,669.63 72,432.55 3,717.00 76,149.55 107.75% 1,010.08 1.43%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 10: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°17 - PINTURA(PERIODO 21.12.12 AL 27.12.2012)

VALORIZACION N°17OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 12/27/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 PINTURA

1.04.00 SOTANO 2

1.04.01 SOTANO 2 M2 550.00 5.00 2,750.00 450.00 2,250.00 100.00 500.00 550.00 2,750.00 100.00% - - 0.00%

1.06.00 SOTANO 1

1.06.01 SOTANO 1 M2 550.00 5.00 2,750.00 500.00 2,500.00 50.00 250.00 550.00 2,750.00 100.00% - - 0.00%

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 1

1.08.01 PINTURA 1 M2 1,100.00 6.00 6,600.00 1,065.00 6,390.00 - 1,065.00 6,390.00 96.82% 35.00 210.00 3.18%

1.08.00 PINTURA EXTERIORES

1.08.01 PINTURA EXTERIORES M2 1,523.00 8.00 12,184.00 1,500.00 12,000.00 - 1,500.00 12,000.00 98.49% 23.00 184.00 1.51%

1.08.00 PINTURA VECINOS

1.08.01 PINTURA EXTERIORES M2 2,000.00 6.00 12,000.00 808.00 4,848.00 590.00 3,540.00 1,398.00 8,388.00 69.90% 602.00 3,612.00 30.10%

9,473.92

SUB-TOTAL 59,889.52 57,093.52 4,290.00 61,383.52 4,006.00 0.35

IGV 18% 10,780.11 10,276.83 772.20 11,049.03 721.08 0.03

TOTAL 70,669.63 67,370.35 5,062.20 72,432.55 102.49% 4,727.08 6.69%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 11: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°16 - PINTURA(PERIODO 14.12.12 AL 20.12.2012)

VALORIZACION N°16OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 12/20/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 PINTURA

1.04.00 SOTANO 2

1.04.01 SOTANO 2 M2 550.00 5.00 2,750.00 350.00 1,750.00 100.00 500.00 450.00 2,250.00 81.82% 100.00 500.00 18.18%

1.06.00 SOTANO 1

1.06.01 SOTANO 1 M2 550.00 5.00 2,750.00 350.00 1,750.00 150.00 750.00 500.00 2,500.00 90.91% 50.00 250.00 9.09%

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 1

1.08.01 PINTURA 1 M2 1,100.00 6.00 6,600.00 1,035.00 6,210.00 30.00 180.00 1,065.00 6,390.00 96.82% 35.00 210.00 3.18%

1.08.00 PINTURA EXTERIORES

1.08.01 PINTURA EXTERIORES M2 1,523.00 8.00 12,184.00 1,400.00 11,200.00 100.00 800.00 1,500.00 12,000.00 98.49% 23.00 184.00 1.51%

1.08.00 PINTURA VECINOS

1.08.01 PINTURA EXTERIORES M2 2,000.00 6.00 12,000.00 458.00 2,748.00 350.00 2,100.00 808.00 4,848.00 40.40% 1,192.00 7,152.00 59.60%

9,473.92

SUB-TOTAL 59,889.52 52,763.52 4,330.00 57,093.52 8,296.00 0.92

IGV 18% 10,780.11 9,497.43 779.40 10,276.83 1,493.28 0.09

TOTAL 70,669.63 62,260.95 5,109.40 67,370.35 95.33% 9,789.28 13.85%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 12: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°15 - PINTURA(PERIODO 07.12.12 AL 13.12.2012)

VALORIZACION N°15OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 12/13/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 PINTURA

1.04.00 SOTANO 2

1.04.01 SOTANO 2 M2 550.00 5.00 2,750.00 200.00 1,000.00 150.00 750.00 350.00 1,750.00 63.64% 200.00 1,000.00 36.36%

1.06.00 SOTANO 1

1.06.01 SOTANO 1 M2 550.00 5.00 2,750.00 300.00 1,500.00 50.00 250.00 350.00 1,750.00 63.64% 200.00 1,000.00 36.36%

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 1

1.08.01 PINTURA 1 M2 1,100.00 6.00 6,600.00 1,025.00 6,150.00 10.00 60.00 1,035.00 6,210.00 94.09% 65.00 390.00 5.91%

1.08.00 PINTURA EXTERIORES

1.08.01 PINTURA EXTERIORES M2 1,523.00 8.00 12,184.00 1,300.00 10,400.00 100.00 800.00 1,400.00 11,200.00 91.92% 123.00 984.00 8.08%

1.08.00 PINTURA VECINOS

1.08.01 PINTURA EXTERIORES M2 1,000.00 6.00 6,000.00 180.00 1,080.00 278.00 1,668.00 458.00 2,748.00 45.80% 542.00 3,252.00 54.20%

8,473.92

SUB-TOTAL 53,889.52 49,235.52 3,528.00 52,763.52 6,626.00 1.41

IGV 18% 9,700.11 8,862.39 635.04 9,497.43 1,192.68 0.14

TOTAL 63,589.63 58,097.91 4,163.04 62,260.95 97.91% 7,818.68 12.30%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 13: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°14 - PINTURA(PERIODO 30.11.12 AL 06.12.2012)

VALORIZACION N°14OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 12/6/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 CONTRAPISOS

1.04.00 SOTANO 2

1.04.01 SOTANO 2 M2 550.00 5.00 2,750.00 - - 200.00 1,000.00 200.00 1,000.00 36.36% 350.00 1,750.00 63.64%

1.06.00 SOTANO 1

1.06.01 SOTANO 1 M2 550.00 5.00 2,750.00 - - 300.00 1,500.00 300.00 1,500.00 54.55% 250.00 1,250.00 45.45%

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 1,212.73 7,276.38 - 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 1

1.08.01 PINTURA 1 M2 1,100.00 6.00 6,600.00 975.00 5,850.00 50.00 300.00 1,025.00 6,150.00 93.18% 75.00 450.00 6.82%

1.08.00 PINTURA EXTERIORES

1.08.01 PINTURA EXTERIORES M2 1,523.00 8.00 12,184.00 1,200.00 9,600.00 100.00 800.00 1,300.00 10,400.00 85.36% 223.00 1,784.00 14.64%

1.08.00 PINTURA VECINOS

1.08.01 PINTURA EXTERIORES M2 1,000.00 6.00 6,000.00 - - 180.00 1,080.00 180.00 1,080.00 18.00% 820.00 4,920.00 82.00%

8,473.92

SUB-TOTAL 53,889.52 44,555.52 4,680.00 49,235.52 10,154.00 2.13

IGV 18% 9,700.11 8,019.99 842.40 8,862.39 1,827.72 0.21

TOTAL 63,589.63 52,575.51 5,522.40 58,097.91 91.36% 11,981.72 18.84%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 14: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°13 - PINTURA(PERIODO 23.11.12 AL 29.11.2012)

VALORIZACION N°12OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 11/29/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 CONTRAPISOS

1.04.00 SOTANO 2

1.04.01 SOTANO 2 M2 550.00 5.00 2,750.00 - - - - 0.00% 550.00 2,750.00 100.00%

1.06.00 SOTANO 1

1.06.01 SOTANO 1 M2 550.00 5.00 2,750.00 - - - - 0.00% 550.00 2,750.00 100.00%

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 1,180.00 7,080.00 32.73 196.38 1,212.73 7,276.38 100.00% - - 0.00%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 1,120.00 6,720.00 92.73 556.38 1,212.73 7,276.38 100.00% - - 0.00%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 1,166.00 6,996.00 46.73 280.38 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 1,130.00 6,780.00 82.73 496.38 1,212.73 7,276.38 100.00% - - 0.00%

1.08.00 PINTURA 1

1.08.01 PINTURA 1 M2 1,100.00 6.00 6,600.00 975.00 5,850.00 - 975.00 5,850.00 88.64% 125.00 750.00 11.36%

1.08.00 PINTURA EXTERIORES

1.08.01 PINTURA EXTERIORES M2 1,523.00 8.00 12,184.00 950.00 7,600.00 250.00 2,000.00 1,200.00 9,600.00 78.79% 323.00 2,584.00 21.21%

1.08.00 PINTURA VECINOS

1.08.01 PINTURA EXTERIORES M2 1,000.00 6.00 6,000.00 - - - - 0.00% 1,000.00 6,000.00 100.00%

8,473.92

SUB-TOTAL 53,889.52 41,026.00 3,529.52 44,555.52 14,834.00 3.33

IGV 18% 9,700.11 7,384.68 635.31 8,019.99 2,670.12 0.33

TOTAL 63,589.63 48,410.68 4,164.83 52,575.51 82.68% 17,504.12 27.53%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 15: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°12 - PINTURA(PERIODO 16.11.12 AL 22.11.2012)

VALORIZACION N°12OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 11/22/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 CONTRAPISOS

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 1,180.00 7,080.00 - 1,180.00 7,080.00 97.30% 32.73 196.38 2.70%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 1,120.00 6,720.00 - 1,120.00 6,720.00 92.35% 92.73 556.38 7.65%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 1,166.00 6,996.00 - 1,166.00 6,996.00 96.15% 46.73 280.38 3.85%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 1,130.00 6,780.00 - 1,130.00 6,780.00 93.18% 82.73 496.38 6.82%

1.08.00 PINTURA 1

1.08.01 PINTURA 1 M2 1,100.00 6.00 6,600.00 450.00 2,700.00 525.00 3,150.00 975.00 5,850.00 88.64% 125.00 750.00 11.36%

1.08.00 PINTURA EXTERIORES

1.08.01 PINTURA EXTERIORES M2 1,000.00 8.00 8,000.00 950.00 7,600.00 - 950.00 7,600.00 95.00% 50.00 400.00 5.00%

6,950.92

SUB-TOTAL 43,705.52 37,876.00 3,150.00 41,026.00 2,679.52 0.37

IGV 18% 7,866.99 6,817.68 567.00 7,384.68 482.31 0.04

TOTAL 51,572.51 44,693.68 3,717.00 48,410.68 93.87% 3,161.83 6.13%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 16: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°11 - PINTURA(PERIODO 09.11.12 AL 15.11.2012)

VALORIZACION N°11OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 11/15/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 CONTRAPISOS

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 1,180.00 7,080.00 - 1,180.00 7,080.00 97.30% 32.73 196.38 2.70%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 1,120.00 6,720.00 - 1,120.00 6,720.00 92.35% 92.73 556.38 7.65%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 1,166.00 6,996.00 - 1,166.00 6,996.00 96.15% 46.73 280.38 3.85%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 1,130.00 6,780.00 - 1,130.00 6,780.00 93.18% 82.73 496.38 6.82%

1.08.00 PINTURA 1

1.08.01 PINTURA 1 M2 1,100.00 6.00 6,600.00 - 450.00 2,700.00 450.00 2,700.00 40.91% 650.00 3,900.00 59.09%

1.08.00 PINTURA EXTERIORES

1.08.01 PINTURA EXTERIORES M2 1,000.00 8.00 8,000.00 950.00 7,600.00 - 950.00 7,600.00 95.00% 50.00 400.00 5.00%

6,950.92

SUB-TOTAL 43,705.52 35,176.00 2,700.00 37,876.00 5,829.52 0.85

IGV 18% 7,866.99 6,331.68 486.00 6,817.68 1,049.31 0.09

TOTAL 51,572.51 41,507.68 3,186.00 44,693.68 86.66% 6,878.83 13.34%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 17: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°10 - PINTURA(PERIODO 01.10.12 AL 08.11.2012)

VALORIZACION N°10OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 11/8/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 CONTRAPISOS

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 1,160.00 6,960.00 20.00 120.00 1,180.00 7,080.00 97.30% 32.73 196.38 2.70%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 1,090.00 6,540.00 30.00 180.00 1,120.00 6,720.00 92.35% 92.73 556.38 7.65%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 1,146.00 6,876.00 20.00 120.00 1,166.00 6,996.00 96.15% 46.73 280.38 3.85%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 1,110.00 6,660.00 20.00 120.00 1,130.00 6,780.00 93.18% 82.73 496.38 6.82%

1.08.00 PINTURA EXTERIORES

1.08.01 PINTURA EXTERIORES M2 1,000.00 8.00 8,000.00 750.00 6,000.00 200.00 1,600.00 950.00 7,600.00 95.00% 50.00 400.00 5.00%

5,850.92

SUB-TOTAL 37,105.52 33,036.00 2,140.00 35,176.00 1,929.52 0.26

IGV 18% 6,678.99 5,946.48 385.20 6,331.68 347.31 0.03

TOTAL 43,784.51 38,982.48 2,525.20 41,507.68 94.80% 2,276.83 5.20%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 18: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°09 - PINTURA(PERIODO 25.10.12 AL 31.10.2012)

VALORIZACION N°09OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 10/31/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 CONTRAPISOS

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 1,080.00 6,480.00 80.00 480.00 1,160.00 6,960.00 95.65% 52.73 316.38 4.35%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 1,010.00 6,060.00 80.00 480.00 1,090.00 6,540.00 89.88% 122.73 736.38 10.12%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 1,066.00 6,396.00 80.00 480.00 1,146.00 6,876.00 94.50% 66.73 400.38 5.50%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 1,030.00 6,180.00 80.00 480.00 1,110.00 6,660.00 91.53% 102.73 616.38 8.47%

1.08.00 PINTURA EXTERIORES

1.08.01 PINTURA EXTERIORES M2 1,000.00 8.00 8,000.00 500.00 4,000.00 250.00 2,000.00 750.00 6,000.00 75.00% 250.00 2,000.00 25.00%

5,850.92

SUB-TOTAL 37,105.52 29,116.00 3,920.00 33,036.00 4,069.52 0.53

IGV 18% 6,678.99 5,240.88 705.60 5,946.48 732.51 0.05

TOTAL 43,784.51 34,356.88 4,625.60 38,982.48 89.03% 4,802.03 10.97%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 19: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°08 - PINTURA(PERIODO 18.10.12 AL 24.10.2012)

VALORIZACION N°08OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 10/24/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 CONTRAPISOS

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 1,080.00 6,480.00 - 1,080.00 6,480.00 89.06% 132.73 796.38 10.94%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 960.00 5,760.00 50.00 300.00 1,010.00 6,060.00 83.28% 202.73 1,216.38 16.72%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 1,036.00 6,216.00 30.00 180.00 1,066.00 6,396.00 87.90% 146.73 880.38 12.10%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 1,000.00 6,000.00 30.00 180.00 1,030.00 6,180.00 84.93% 182.73 1,096.38 15.07%

1.08.00 PINTURA EXTERIORES

1.08.01 PINTURA EXTERIORES M2 1,000.00 8.00 8,000.00 - 500.00 4,000.00 500.00 4,000.00 50.00% 500.00 4,000.00 50.00%

5,850.92

SUB-TOTAL 37,105.52 24,456.00 4,660.00 29,116.00 7,989.52 1.05

IGV 18% 6,678.99 4,402.08 838.80 5,240.88 1,438.11 0.10

TOTAL 43,784.51 28,858.08 5,498.80 34,356.88 78.47% 9,427.63 21.53%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 20: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°07 - PINTURA(PERIODO 11.10.12 AL 17.10.2012)

VALORIZACION N°06OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 10/10/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 CONTRAPISOS

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 830.00 4,980.00 250.00 1,500.00 1,080.00 6,480.00 89.06% 132.73 796.38 10.94%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 730.00 4,380.00 230.00 1,380.00 960.00 5,760.00 79.16% 252.73 1,516.38 20.84%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 810.00 4,860.00 226.00 1,356.00 1,036.00 6,216.00 85.43% 176.73 1,060.38 14.57%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 810.00 4,860.00 190.00 1,140.00 1,000.00 6,000.00 82.46% 212.73 1,276.38 17.54%

4,850.92

SUB-TOTAL 29,105.52 19,080.00 5,376.00 24,456.00 4,649.52 0.64

IGV 18% 5,238.99 3,434.40 967.68 4,402.08 836.91 0.06

TOTAL 34,344.51 22,514.40 6,343.68 28,858.08 84.03% 5,486.43 15.97%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 21: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°06 - PINTURA(PERIODO 04.10.12 AL 10.10.2012)

VALORIZACION N°06OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 10/10/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 CONTRAPISOS

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 680.00 4,080.00 150.00 900.00 830.00 4,980.00 68.44% 382.73 2,296.38 31.56%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 630.00 3,780.00 100.00 600.00 730.00 4,380.00 60.19% 482.73 2,896.38 39.81%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 660.00 3,960.00 150.00 900.00 810.00 4,860.00 66.79% 402.73 2,416.38 33.21%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 660.00 3,960.00 150.00 900.00 810.00 4,860.00 66.79% 402.73 2,416.38 33.21%

4,850.92

SUB-TOTAL 29,105.52 15,780.00 3,300.00 19,080.00 10,025.52 1.38

IGV 18% 5,238.99 2,840.40 594.00 3,434.40 1,804.59 0.14

TOTAL 34,344.51 18,620.40 3,894.00 22,514.40 65.55% 11,830.11 34.45%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 22: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°05 - PINTURA(PERIODO 27.09.12 AL 03.10.2012)

VALORIZACION N°05OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 10/3/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 CONTRAPISOS

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 530.00 3,180.00 150.00 900.00 680.00 4,080.00 56.07% 532.73 3,196.38 43.93%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 530.00 3,180.00 100.00 600.00 630.00 3,780.00 51.95% 582.73 3,496.38 48.05%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 510.00 3,060.00 150.00 900.00 660.00 3,960.00 54.42% 552.73 3,316.38 45.58%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 510.00 3,060.00 150.00 900.00 660.00 3,960.00 54.42% 552.73 3,316.38 45.58%

4,850.92

SUB-TOTAL 29,105.52 12,480.00 3,300.00 15,780.00 13,325.52 1.83

IGV 18% 5,238.99 2,246.40 594.00 2,840.40 2,398.59 0.18

TOTAL 34,344.51 14,726.40 3,894.00 18,620.40 54.22% 15,724.11 45.78%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 23: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°04 - PINTURA(PERIODO 20.09.12 AL 26.09.2012)

VALORIZACION N°04OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 9/26/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 CONTRAPISOS

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 380.00 2,280.00 150.00 900.00 530.00 3,180.00 43.70% 682.73 4,096.38 56.30%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 380.00 2,280.00 150.00 900.00 530.00 3,180.00 43.70% 682.73 4,096.38 56.30%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 360.00 2,160.00 150.00 900.00 510.00 3,060.00 42.05% 702.73 4,216.38 57.95%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 360.00 2,160.00 150.00 900.00 510.00 3,060.00 42.05% 702.73 4,216.38 57.95%

4,850.92

SUB-TOTAL 29,105.52 8,880.00 3,600.00 12,480.00 16,625.52 2.28

IGV 18% 5,238.99 1,598.40 648.00 2,246.40 2,992.59 0.23

TOTAL 34,344.51 10,478.40 4,248.00 14,726.40 42.88% 19,618.11 57.12%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 24: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°03 - PINTURA(PERIODO 13.09.12 AL 19.09.2012)

VALORIZACION N°03OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 9/19/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 CONTRAPISOS

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 280.00 1,680.00 100.00 600.00 380.00 2,280.00 31.33% 832.73 4,996.38 68.67%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 280.00 1,680.00 100.00 600.00 380.00 2,280.00 31.33% 832.73 4,996.38 68.67%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 180.00 1,080.00 180.00 1,080.00 360.00 2,160.00 29.69% 852.73 5,116.38 70.31%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 180.00 1,080.00 180.00 1,080.00 360.00 2,160.00 29.69% 852.73 5,116.38 70.31%

4,850.92 560.00

SUB-TOTAL 29,105.52 5,520.00 3,360.00 8,880.00 20,225.52 2.78

IGV 18% 5,238.99 993.60 604.80 1,598.40 3,640.59 0.28

TOTAL 34,344.51 6,513.60 3,964.80 10,478.40 30.51% 23,866.11 69.49%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 25: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°02 - PINTURA(PERIODO 06.09.12 AL 12.09.2012)

VALORIZACION N°02OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 9/12/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 CONTRAPISOS

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 180.00 1,080.00 100.00 600.00 280.00 1,680.00 23.09% 932.73 5,596.38 76.91%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 180.00 1,080.00 100.00 600.00 280.00 1,680.00 23.09% 932.73 5,596.38 76.91%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 - - 180.00 1,080.00 180.00 1,080.00 14.84% 1,032.73 6,196.38 85.16%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 - - 180.00 1,080.00 180.00 1,080.00 14.84% 1,032.73 6,196.38 85.16%

4,850.92

SUB-TOTAL 29,105.52 2,160.00 3,360.00 5,520.00 23,585.52 3.24

IGV 18% 5,238.99 388.80 604.80 993.60 4,245.39 0.32

TOTAL 34,344.51 2,548.80 3,964.80 6,513.60 18.97% 27,830.91 81.03%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 26: Valorizacion Pintura Baez

VALORIZACIÓN DE OBRA N°01 - PINTURA(PERIODO 30.08.12 AL 05.09.2012)

VALORIZACION N°01OBRA : RESIDENCIAL MALLKI MODALIDAD: A PRECIOS UNITARIOS

CONTRATISTA: BAEZ CONSUL SAC

FECHA : 9/5/2012

RESIDENTE : MRFH / JSVH

Ítem Partidas

PROPUESTA CONTRACTUAL Avance Anterior Avance Actual Avance Acumulado Saldo por EjecutarUnd.

Metrado Metrado Metrado Metrado % Ejecutado Metrado % Por Ejecutar

1.00.00 CONTRAPISOS

1.04.00 PINTURA 4

1.04.01 PINTURA 4 M2 1,212.73 6.00 7,276.38 - 180.00 1,080.00 180.00 1,080.00 14.84% 1,032.73 6,196.38 85.16%

1.05.00 PINTURA 5

1.05.01 PINTURA 5 M2 1,212.73 6.00 7,276.38 - - - - 0.00% 1,212.73 7,276.38 100.00%

1.06.00 PINTURA 6

1.06.01 PINTURA 6 M2 1,212.73 6.00 7,276.38 - 180.00 1,080.00 180.00 1,080.00 14.84% 1,032.73 6,196.38 85.16%

1.07.00 PINTURA 7

1.07.01 PINTURA 7 M2 1,212.73 6.00 7,276.38 - - - - 0.00% 1,212.73 7,276.38 100.00%

1.08.00 PINTURA 8

1.08.01 PINTURA 8 M2 1,212.73 6.00 7,276.38 - - - - 0.00% 1,212.73 7,276.38 100.00%

1.09.00 PINTURA 9

1.03.01 PINTURA 9 M2 1,212.73 6.00 7,276.38 - - - - 0.00% 1,212.73 7,276.38 100.00%

1.09.01 PINTURA 10

1.03.02 PINTURA 9 M2 1,212.73 6.00 7,276.38 - - - - 0.00% 1,212.73 7,276.38 100.00%

1.10.00 PINTURA EXTERIORES

1.04.01 EXTERIORES M2 1,739.55 6.00 10,437.30 - - - - 0.00% 1,739.55 10,437.30 100.00%

10,228.66

SUB-TOTAL 61,371.96 0.00 2,160.00 2,160.00 59,211.96 7.70

IGV 18% 11,046.95 0.00 388.80 388.80 10,658.15 0.77

TOTAL 72,418.91 0.00 2,548.80 2,548.80 3.52% 69,870.11 96.48%

NUEVOS SOLES

Costo Unitario

S/.

Costo Parcial

S. Monto de Valorización Total

Monto de Valorización

Total

Monto de Valorización

Total

Monto de Valorización

Total

Page 27: Valorizacion Pintura Baez

RESUMEN DE VALORIZACION PINTURA ADICIONAL Nº03

OBRA : RESIDENCIAL MALLKICONTRATISTA : BAEZ CONSUL SACPERIODO VALORIZADO : DEL 23.02.13 AL 01.03.13FECHA CONTRATO : 8/13/2012MONTO CONTRATO : S/. NUEVOS SOLES

DESCRIPCION MONTO

COSTO DIRECTO TOTAL S/. 3247.37

IGV 18% S/. 584.53

VALORIZACION NETA S/. 3831.89

RETENCION POR FIEL CUMPLIMIENTO 5% S/. 191.59

TOTAL A PAGAR S/. 3640.30

MONTO A CANCELAR CHEQUE S/. 3640.30 NUEVOS SOLES

A NOMBRE DE : BAEZ CONSUL SAC

Page 28: Valorizacion Pintura Baez

PAGOS EFECTUADOS

OBRA : RESIDENCIAL MALLKICONTRATISTA : BAEZ CONSUL SACPERIODO VALORIZADO : DEL 23.02.13 al 01.03.13FECHA CONTRATO : 8/13/2101MONTO CONTRATO S/. NUEVOS SOLES

FECHA VALORIZACION COSTO DIRECTO IGV 18% VALORIZACION RETENCION TOTALNETA 5%

05.09.12 VALORIZACION N°01 2160.00 388.80 2548.80 127.44 2421.3612.09.12 VALORIZACION N°02 3360.00 604.80 3964.80 198.24 3766.5619.09.12 VALORIZACION N°03 3360.00 604.80 3964.80 198.24 3766.56 26.09.12 VALORIZACION N°04 3600.00 648.00 4248.00 212.40 4035.6003.10.12 VALORIZACION N°05 3300.00 594.00 3894.00 194.70 3699.3010.10.12 VALORIZACION N°06 3300.00 594.00 3894.00 194.70 3699.3017.10.12 VALORIZACION N°07 5376.00 967.68 6343.68 317.18 6026.5024.10.12 VALORIZACION N°08 4660.00 838.80 5498.80 274.94 5223.8631.10.12 VALORIZACION N°09 3920.00 705.60 4625.60 231.28 4394.3208.11.12 VALORIZACION N°10 2140.00 385.20 2525.20 126.26 2398.9415.11.12 VALORIZACION N°11 2700.00 486.00 3186.00 159.30 3026.7022.11.12 VALORIZACION N°12 3150.00 567.00 3717.00 185.85 3531.1529.11.12 VALORIZACION N°13 3529.52 635.31 4164.83 208.24 3956.5906.12.12 VALORIZACION N°14 4680.00 842.40 5522.40 276.12 5246.2813.12.12 VALORIZACION N°15 3528.00 635.04 4163.04 208.15 3954.8920.12.12 VALORIZACION N°16 4330.00 779.40 5109.40 255.47 4853.9327.12.12 VALORIZACION N°17 4290.00 772.20 5062.20 253.11 4809.0903.01.13 VALORIZACION N°18 3150.00 567.00 3717.00 185.85 3531.1510.01.13 VALORIZACION N°19 3200.00 576.00 3776.00 188.80 3587.2017.01.13 VALORIZACION N°20 4000.00 720.00 4720.00 236.00 4484.0024.01.13 VALORIZACION N°21 3200.00 576.00 3776.00 188.80 3587.2031.01.13 VALORIZACION N°22 3200.00 576.00 3776.00 188.80 3587.2007.02.13 VALORIZACION N°23 3256.00 586.08 3842.08 192.10 3649.9814.02.13 ADICIONAL N°01 3300.00 594.00 3894.00 194.70 3699.3021.02.13 ADICIONAL N°02 3300.00 594.00 3894.00 194.70 3699.3001.03.13 ADICIONAL N°03 3247.37 584.53 3831.89 191.59 3640.30

PAGOS TOTALES 91,236.89 16,422.64 107,659.52 5,382.98 102,276.55

A NOMBRE DE : BAEZ CONSUL SAC

Page 29: Valorizacion Pintura Baez

RESUMEN DE VALORIZACION

1.- AVANCE EJECUTADO S/.

VALORZACION N°01 2250.03VALORZACION N°02 2774.97

2.- IMPUESTO IGV 18% (1)S/.

VALORZACION N°01 405.01VALORZACION N°02 499.49

3.- SUB - TOTAL (1+2) S/.

VALORZACION N°01 2655.04VALORZACION N°02 3274.46

4.- RETENCIONES (5% (3))S/.

VALORZACION N°01 132.75VALORZACION N°02 163.72

5.- PAGOS (2) - (3) S/.

VALORZACION N°01 2522.29VALORZACION N°02 3110.74

TOTAL S/. 5633.03

6.- DEVOLUCIONES (4)S/.

VALORZACION N°01 132.75VALORZACION N°02 163.72

TOTAL S/. 296.48

TOTAL PRESUPUESTO (5+6) S/. 5929.50