0 100 200 300 400 500 1000m 38.50 39.0 39.50 36.50 37.0 37.50 38.0 40.0 46.0 47.0 45.47 47.0 46.50 46.0 34.50 33.0 33.50 34.0 150Ø 34.50 225Ø 225Ø 150Ø 150Ø 225Ø 37.50 150Ø 225Ø 38.0 225Ø 225Ø 38.0 150Ø 38.50 38.50 39.0 39.0 39.50 39.50 40.0 40.0 40.50 41.0 40.50 41.50 41.50 42.0 42.0 38.0 38.50 38.50 38.50 150Ø 225Ø 225Ø ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE ANY DISCREPANCIES ARE TO BE REPORTED TO THE ARCHITECT BEFORE ANY WORK COMMENCES THIS DRAWING SHALL NOT BE SCALED TO ASCERTAIN ANY DIMENSIONS WORK TO FIGURED DIMS ONLY THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT EXPRESS WRITTEN PERMISSION FROM AFL LTD. SO18 KEY red line boundary ACCESS & LEVELS vehicle access points Sta! access Shared route SO17 G0.7 MG G0.6 car / caravan route Services access HGV / Coach route +44.7 proposed levels 130.0 existing levels LAND USES HGV parking +44.7 +44.7 +45.7 +42.7 car parking (including integrated landscaping) coach parking (including integrated landscaping) caravan parking (including integrated landscaping) Building (Amenity Building and FFS) - < 12.5m Building (drive through co!ee shop) < 6.5m 46.50 12mH G2.2 +41 Covered hard-standing (HGV FFS) < 8m Service area +40 +40 Sta! parking VEGETATION & INFRASTRUCTURE +40 +38 Existing tree lines G2.0 10mH +37 Concealment mounds made up of level changes and supplementary planting Surface water attenuation +39 P07 22.08.19 TS Access removed from A168 roundabout P06 20.08.19 TS Lagoon access off A168 added P05 06.08.18 TS Outline issue - red line amended P04 24.07.18 TS Outline issue - red line amended P03 24.07.18 TS Outline issue - Leeming Lane route updated +36 +37 P02 14.08.17 TS Issued for outline planning - amended red line P01 21.07.17 TS Issued for outline planning MH G MH rev date/intls description UTL SO8 G +39 G project Vale of York MSA G +36 location G A1(M) North Yorkshire MH G RS BT client RS G UTL - SEIZED/ BURIED MH SO9 G G G RS G UTL - SEIZED/ BURIED MH G PT MH SP CB UTL SP CB SO10 G BT MH G G MH UTL UTL - SEIZED/ G BURIED LP UTL - SEIZED MH LP IC G UTL - SEIZED CB SP G SO11 SP SP SP MH CB SP SP SP SP SP SP SP LP G SP MH G MH UTL SP SEIZED SP SP TB G SP RS MKR SP G G MH UTL MH SP LP BURIED SP SP G SP SP G G SP SP SP SP SP SP SP MH SP UTL SEIZED LP MH MH RS G MKR UTL BOL G AFL Architects G RS SP G 1st Floor LP SP MH MKR BOL St Georges House LP SP G 56 Peter Street MH Manchester UK LP SP G M2 3NQ G G G t: +44(0)161 236 6263 LP MH f: +44(0)161 236 6484 UTL SEIZED G w: www.afl-architects.com SP e: [email protected] London office LP t: +44 (0)20 7831 8877 key plan 41.0 SP G LP N SP G MH drawing title PARAMETERS PLAN dwg purpose PLANNING 0 100 200 300 400 500 1000m scale 1:1500 @ sheet size A1 drawn TS rev date checked TS July 2017 162007 job number AFL-00-00-DR-A-00120 drawing number P07 revision