This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Prepared by:
AECOM
105 Commerce Valley Drive West, Floor 7 905 886 7022 tel
Markham, ON, Canada L3T 7W3 905 886 9494 fax
www.aecom.com
Project Number:
60267668
Date:
May 10, 2016
Vale Limited / Glencore Limited
Annual SO2 Report Submission SO2 Monitoring Network for Sudbury January to December 2015
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final
Statement of Qualifications and Limitations
The attached Report (the “Report”) has been prepared by AECOM Canada Ltd. (“Consultant”) for the benefit of the client
(“Client”) in accordance with the agreement between Consultant and Client, including the scope of work detailed therein (the
“Agreement”).
The information, data, recommendations and conclusions contained in the Report (collectively, the “Information”):
is subject to the scope, schedule, and other constraints and limitations in the Agreement and the qualifications
contained in the Report (the “Limitations”)
represents Consultant’s professional judgement in light of the Limitations and industry standards for the preparation
of similar reports
may be based on information provided to Consultant which has not been independently verified
has not been updated since the date of issuance of the Report and its accuracy is limited to the time period and
circumstances in which it was collected, processed, made or issued
must be read as a whole and sections thereof should not be read out of such context
was prepared for the specific purposes described in the Report and the Agreement
in the case of subsurface, environmental or geotechnical conditions, may be based on limited testing and on the
assumption that such conditions are uniform and not variable either geographically or over time
Consultant shall be entitled to rely upon the accuracy and completeness of information that was provided to it and has no obligation
to update such information. Consultant accepts no responsibility for any events or circumstances that may have occurred since the
date on which the Report was prepared and, in the case of subsurface, environmental or geotechnical conditions, is not responsible
for any variability in such conditions, geographically or over time.
Consultant agrees that the Report represents its professional judgement as described above and that the Information has been
prepared for the specific purpose and use described in the Report and the Agreement, but Consultant makes no other
representations, or any guarantees or warranties whatsoever, whether express or implied, with respect to the Report, the
Information or any part thereof.
The Report is to be treated as confidential and may not be used or relied upon by third parties, except:
as agreed in writing by Consultant and Client
as required by law
for use by governmental reviewing agencies
Consultant accepts no responsibility, and denies any liability whatsoever, to parties other than Client who may obtain access to
the Report or the Information for any injury, loss or damage suffered by such parties arising from their use of, reliance upon, or
decisions or actions based on the Report or any of the Information (“improper use of the Report”), except to the extent those
parties have obtained the prior written consent of Consultant to use and rely upon the Report and the Information. Any damages
arising from improper use of the Report or parts thereof shall be borne by the party making such use.
This Statement of Qualifications and Limitations is attached to and forms part of the Report and any use of the Report is subject
to the terms hereof.
AECOM
105 Commerce Valley Drive West, Floor 7 905 886 7022 tel
Markham, ON, Canada L3T 7W3 905 886 9494 fax
www.aecom.com
Rpt 2015 Annual So2 Report_Final
May 13, 2016
Ministry of the Environment and Climate Change
Sudbury District Office
199 Larch St., Suite 1201
Sudbury, Ontario
P3E 5P9
Dear District Manager:
Project No: 60267668
Regarding: Annual SO2 Report Submission
SO2 Monitoring Network for Sudbury – January to December 2015
Enclosed is the Annual SO2 Report Submission for the Sudbury SO2 Monitoring Network. On behalf of Vale and
Glencore, AECOM prepared the attached annual report that includes presentation of monitoring data from January
to December 2015.
Please do not hesitate to contact me at (905) 390-2026, or by E-mail at [email protected] if you have
any questions or require further information.
Sincerely,
AECOM Canada Ltd.
Danielle Arsenault, P. Eng.
Environmental Engineer
cc: Guowang Qiu Monika Greenfield Chad Pearson Marc Gascon Air Quality Analyst Vale Limited Superintendent of Environment Manager, Product Support MOECC Copper Cliff Smelter Glencore Bestech 199 Larch Street, Suite 1201 (Technical Services) Sudbury Operations 1040 Lorne Street, Unit 3 Sudbury, ON 337 Power Street Falconbridge, ON Sudbury, ON P3E 5P9 Copper Cliff, ON P0M 1S0 P3C 4R9 P0M 1N0
1.1 General Overview ................................................................................................................................................ 1
2. Summary of Overall Operations.................................................................................................. 2
2.1 Parameters Monitored .......................................................................................................................................... 2 2.2 Inventory of SO2 Equipment ................................................................................................................................. 3 2.3 Meteorological Measurement Equipment ............................................................................................................. 6 2.4 Summary of Site Visits – Bestech ........................................................................................................................ 6 2.5 MOECC Audits ..................................................................................................................................................... 7 2.6 Data Loss and Backup ......................................................................................................................................... 7
3. Percent Valid Data Statistics ....................................................................................................... 9
3.1 SO2 Valid Data Collection Performance ............................................................................................................... 9 3.2 Meteorological Valid Data Collection Performance ............................................................................................ 10
Table 1. Annual Arithmetic Mean SO2 Concentrations for January to December 2015 ............................................................. i Table 2. Summary of SO2 Annual Valid Data Collection for 2015 ............................................................................................ ii Table 3. Summary of Annual Valid Data Collection for Meteorological Data @ STN77025 ..................................................... iii Table 4. Summary of Annual Valid Data Collection for Meteorological Data @ Falconbridge MET ......................................... iii
Table 2-1. Parameters Monitored at Sudbury SO2 Monitoring Network ........................................................................................ 2 Table 2-2. SO2 Analyzer Inventory ............................................................................................................................................... 3 Table 2-3. Station Upgrades and Replacements in 2015 ............................................................................................................. 4 Table 2-4. Calibration Summary at Each Monitoring Station in 2015 ........................................................................................... 6 Table 2-5. MOECC Audits at Each SO2 Monitoring Station – Date & Result ................................................................................ 7 Table 3-1. SO2 Valid Data Collection at Each Monitoring Station ................................................................................................. 9 Table 3-2. Meteorological Valid Data Collection Performance @ STN77025 ............................................................................. 10 Table 3-3. Meteorological Valid Data Collection Performance @ Falconbridge MET ................................................................ 10 Table 4-1. Maximum Hourly SO2 Concentrations – January to December 2015 ........................................................................ 11 Table 4-2. Maximum Daily SO2 Concentrations – January to December 2015 .......................................................................... 12 Table 4-3. SO2 Measured Concentrations above AAQC ............................................................................................................ 13 Table 4-4. Source Contribution Assessment for the Measured SO2 Concentrations above the Hourly AAQC ........................... 14 Table 5-1. Average Annual SO2 Concentrations for 2014 and 2015 .......................................................................................... 17
List of Figures
Figure 4-1. Annual Mean SO2 Concentration – January to December 2015 .............................................................................. 16 Figure 5-1. Annual Mean SO2 Concentrations Comparison ........................................................................................................ 18
Appendices
Appendix A. Equipment Inventory
Appendix B. Summary of Site Visits & Lists of Problems
Appendix C. Figures
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 1
1. Introduction
Bestech was retained by Vale and Glencore to operate and maintain eighteen (18) SO2 monitoring stations in the Sudbury area.
AECOM Canada Ltd. (AECOM) was retained by Bestech to perform the data analysis and reporting on their behalf. Bestech and
AECOM conducted this work from January to December 2015. This annual report is a component of the reporting requirements
that Vale and Glencore must provide to the Ministry of the Environment and Climate Change (MOECC).
This report has been prepared following the guidance of the report issued by the MOECC Operations Manual for Air Quality
Monitoring in Ontario (MOECC, March 2008). AECOM is responsible for reporting monitoring data while Bestech is responsible for
calibration and maintenance of the monitoring equipment.
This annual report summarizes the measured ambient SO2 concentrations at the eighteen (18) monitoring stations and the
meteorological conditions from the two (2) meteorological stations (STN77025 and Falconbridge MET), located in Sudbury and
Falconbridge, Ontario.
1.1 General Overview
There are currently eighteen (18) SO2 monitoring stations and two (2) meteorological stations situated in Sudbury and its
surrounding area. Prior to April 2004, eleven (11) of these monitoring stations and one (1) meteorological station (STN77025)
were owned and operated by the MOECC. Since then, the ownership and responsibility for maintenance, calibration and data
reporting have been transferred jointly to Vale and Glencore and the following changes have occurred:
In 2007, two (2) new stations were added as the 12th
and 13th
stations (STN77230 and STN77231).
In May 2008, four (4) stations (STN77600, STN77601, STN77602 and STN77603) and one (1) MET station (Falconbridge
MET) were included in the reporting for the Sudbury SO2 Monitoring Network. They had been previously reported by
Glencore.
In December 2009, STN77201 (Mikkola) was relocated from 150 Patricia Street to 1 Mikkola Road and renamed
STN77227 (Kinsmen).
In November 2013, STN77330 (Union) was added to the monitoring network as the 18th station. Bestech and AECOM
were retained by Vale and Glencore to administer this monitoring network on their behalf.
Bestech has calibrated all of the eighteen (18) stations in accordance with the MOECC Operations Manual for Air Quality
Monitoring in Ontario (March 2008). Bestech and AECOM have carried out daily data checks, data editing and monthly data
checks.
A map showing the location of the monitoring stations, the MET stations and the Vale and Glencore sites is presented in Appendix
C.
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 2
2. Summary of Overall Operations
2.1 Parameters Monitored
The parameters monitored at the Sudbury SO2 Monitoring Network stations are mainly SO2 concentrations, wind speed, wind
direction, and ambient temperatures. Table 2-1 presents the parameters monitored at each of the monitoring stations.
Table 2-1. Parameters Monitored at Sudbury SO2 Monitoring Network
The following are the flagged conditions for each station for February 2015.
Vale Sites
Algonquin 77231
February 2, 2015: Monthly calibration from 14:40 – 15:45. 2 invalid hour(s). February 23, 2015: Government audit from 10:25 – 10:59. 1 invalid hour(s).
Copper Cliff 77218 February 10, 2015: Monthly calibration from 10:17 – 11:49. 2 invalid hour(s).
February 23, 2015: Government audit from 13:06 – 13:35. 1 invalid hour(s).
Dozzi Park 77228 February 24, 2015: Government audit from 13:09 – 13:37. 1 invalid hour(s).
February 25, 2015: Monthly calibration from 13:06 – 14:23. 2 invalid hour(s).
Kelly Lake 77225
February 10, 2015: Monthly calibration from 12:11 – 13:12. 1 invalid hour(s).
February 23, 2015: Government audit from 11:15 – 11:44. 1 invalid hour(s).
Kinsmen 77227
February 2, 2015: Monthly calibration from 12:54 – 14:02. 1 invalid hour(s).
February 23, 2015: Servicing from 9:54 – 12:02. 2 invalid hour(s). February 24, 2015: Government audit from 11:25 – 11:50. 1 invalid hour(s).
New Sudbury 77075 February 25, 2015: Monthly calibration from 15:35 – 16:34. 2 invalid hour(s).
Rayside 77206 February 13, 2015: Monthly calibration from 14:20 – 15:39. 2 invalid hour(s).
February 25, 2015: Government audit from 13:46 – 14:15. 1 invalid hour(s).
Science North 77203 February 24, 2015: Government audit from 10:26 – 10:54. 1 invalid hour(s).
February 26, 2015: Monthly calibration from 10:15 – 11:45. 2 invalid hour(s).
Spruce St 77230 February 24, 2015: Monthly calibration from 10:33 – 11:49. 2 invalid hour(s).
February 24, 2015: Government audit from 13:55 – 14:23. 1 invalid hour(s).
Union 77330
February 23, 2015: Government audit from 13:44 – 14:13. 1 invalid hour(s).
February 25, 2015: Monthly calibration from 11:00 – 12:19. 2 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
February 27, 2015: Monthly calibration from 10:21 – 11:43. 2 invalid hour(s).
Edison 77600
February 19, 2015: Monthly calibration from 10:35 – 11:43. 2 invalid hour(s).
February 27, 2015: Government audit from 10:22 – 10:50. 1 invalid hour(s).
Garson 77065
February 24, 2015: Monthly calibration from 13:45 – 14:56. 1 invalid hour(s). February 25, 2015: Government audit from 10:43 – 11:15. 2 invalid hour(s).
Hanmer 77013 February 13, 2015: Monthly calibration from 12:30 – 13:43. 2 invalid hour(s).
February 25, 2015: Government audit from 12:48 – 13:20. 1 invalid hour(s).
Parkinson 77601 February 17, 2015: Monthly calibration from 10:31 – 11:39. 2 invalid hour(s).
February 27, 2015: Government audit from 11:13 – 11:45. 1 invalid hour(s).
Skead 77012
February 13, 2015: Monthly calibration from 10:31 – 11:49. 2 invalid hour(s).
February 15, 2015: Missing data due to UPS problems from 16:03 – 17:39. 2 invalid hour(s).
February 17, 2015: Servicing from 15:16 – 15:28. 0 invalid hour(s). February 25, 2015: Government audit from 11:38 – 12:15. 2 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
The following are the flagged conditions for each station for April 2015.
Vale Sites
Algonquin 77231
April 9, 2015: Monthly calibration from 13:29 – 14:18. 2 invalid hour(s). April 29, 2015: Servicing from 9:12 – 9:19. 0 invalid hour(s).
Copper Cliff 77218 April 13, 2015: Monthly calibration from 12:54 – 13:49. 1 invalid hour(s).
Dozzi Park 77228
April 13, 2015: Brief negative under range from 9:03 – 9:05. 0 invalid hour(s). April 23, 2015: Monthly calibration from 13:14 – 14:26. 2 invalid hour(s).
April 27, 2015: Calibration verification from 7:45 – 8:40. 1 invalid hour(s).
Kelly Lake 77225
April 5, 2015: Brief negative under range from 11:05 – 11:07. 0 invalid hour (s).
April 9, 2015: Monthly calibration from 12:06 – 13:07. 1 invalid hour (s). April 13, 2015: Brief negative under range from 9:03 – 9:04. 0 invalid hour (s).
April 27, 2015: Power outage from 8:57 – 9:52 and 10:22 – 10:25. 1 invalid hour(s).
April 30, 2015: Power outage from 10:32 – 10:34 and 11:29 – 11:36. 0 invalid hour (s).
Kinsmen 77227
April 16, 2015: Monthly calibration from 10:46 – 11:53. 1 invalid hour(s).
New Sudbury 77075
April 17, 2015: Monthly calibration from 12:55 – 14:02. 1 invalid hour (s).
Rayside 77206
April 14, 2015: Monthly calibration from 11:49 – 13:12. 1 invalid hour (s).
Science North 77203 April 17, 2015: Monthly calibration from 9:45 – 10:46. 1 invalid hour (s).
Spruce St 77230
April 27, 2015: Monthly calibration from 13:29 – 14:13. 1 invalid hour (s).
Union 77330
April 1, 2015: Servicing from 10:10 – 10:42. 1 invalid hour (s). April 2, 2015: Auto-calibration delay failure from 3:11 – 3:30. 1 invalid hour (s).
April 13, 2015: Brief negative under range from 9:03 – 9:05. 0 invalid hour (s).
April 14, 2015: Monthly calibration from 8:52- 10:07. 1 invalid hour (s).
April 29, 2015: Servicing from 14:53 – 15:07. 0 invalid hour (s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
The following are the flagged conditions for each station for June 2015.
Vale Sites
Algonquin 77231
June 2, 2015: Monthly calibration from 12:36 – 14:17. 3 invalid hour(s).
June 8, 2015: Government audit from 9:13 – 9:53. 1 invalid hour(s).
Copper Cliff 77218
June 8, 2015: Government audit from 10:18 – 10:54. 1 invalid hour(s). June 29, 2015: Monthly calibration from 11:12 – 12:03. 1 invalid hour (s).
June 30, 2015: Servicing from 12:12 – 12:20. 0 invalid hour(s).
Dozzi Park 77228 June 12, 2015: Government audit from 9:52– 10:22. 1 invalid hour(s).
June 30, 2015: Monthly calibration from 13:14 – 13:45. 1 invalid hour(s).
Kelly Lake 77225
June 8, 2015: Government audit from12:37 – 13:25. 2 invalid hour(s).
June 15, 2015: Brief power outage from 14:37 – 14:41. 0 invalid hour(s).
June 30, 2015: Monthly calibration from 12:21 – 12:55. 1 invalid hour(s).
Kinsmen 77227
June 3, 2015: Monthly calibration from 12:35 – 13:35. 2 invalid hour(s). June7, 2015: Servicing from 13:28 – 14:39. 2 invalid hour(s).
June 8, 2015: Instrument verification from 7:54 – 8:15. 1 invalid hour(s).
June 8, 2015: Government audit from 11:12 – 12:09. 1 invalid hour(s). June 24, 2015: Servicing from 6:32 – 7:59, 10:21 – 10:51 and 11:14 –11:29. 3 invalid hour(s).
June 25, 2015: Servicing from 11:00 – 11:23. 1 invalid hour(s).
New Sudbury 77075 June 2, 2015: Monthly calibration from 8:51 – 9:58. 1 invalid hour(s).
June 10, 2015: Government audit from 12:16 – 13:00.1 invalid hour(s).
June 25, 2015: Brief power outage from 13:17 – 13:23. 0 invalid hour(s).
Rayside 77206
June 9, 2015: Government audit 9:31 – 9:57. 1 invalid hour(s). June 17, 2015: Power outage from 19:12– 21:53. 3 invalid hour(s).
June 17, 2015: Missing data due to power outage 21:54 – 22:31. 1 invalid hour (s).
June 2, 2015: Monthly calibration from 10:56 – 11:54. 1 invalid hour(s)
June 11, 2015: Government audit from 9:23 – 9:59. 1 invalid hour(s). June 18, 2015: Annual preventative maintenance from 12:25 – 12:57. 1 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
June 23, 2015: Servicing from 13:52 – 14:25. 1 invalid hour(s). June 25, 2015: Servicing from12:30 – 13:17. 2 invalid hour(s).
Spruce St 77230
June 10, 2015: Government audit from 13:32 – 14:06. 1 invalid hour(s). June 30, 2015: Monthly calibration from 14:03 – 14:35. 1 invalid hour(s).
Union 77330 June 11, 2015: Government audit from 11:01 – 11:30. 1 invalid hour(s).
June 29, 2015: Monthly calibration from 12:23 – 13:48. 2 invalid hour(s).
CKNC Met
DT2
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
WD1
Nothing to report
WD3
Nothing to report
WS1
Nothing to report
WS3
Nothing to report
Glencore Sites
Coniston 77028 June 10, 2015: Government audit from 10:23 – 10:59. 1 invalid hour(s).
June 16, 2015: Annual preventive maintenance from 12:44 – 13:51 and monthly calibration from 14:14 –
14:25 and brief negative under range from 14:27 – 14:30. 2 invalid hour(s).
Edison 77600
June 4, 2015: Government audit 11:30 – 12:04. 1 invalid hour(s).
June 23, 2015: Monthly calibration from 9:20 – 10:09. 1 invalid hour(s).
Garson 77065
June 9, 2015: Government audit from 13:23 – 13:50. 1 invalid hour(s).
June 10, 2015: Government audit from 9:38 – 10:07. 1 invalid hour(s). June 17, 2015: Annual preventative maintenance from 12:02 – 13:07. 1 invalid hour(s).
Hanmer 77013 June 1, 2015: Monthly calibration from 9:21 – 9:56. 1 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
June 9, 2015: Government audit from 10:26 – 11:00. 1 invalid hour(s). June 16, 2015: Servicing from 9:16-9:30, 9:36-9:38 and 11:19 – 11:26. 1 invalid hour(s).
Parkinson 77601
June 4, 2015: Government audit from 9:58 – 10:40. 1 invalid hour(s). June 23, 2015: Monthly calibration from 7:53 – 8:56. 1 invalid hour(s).
Skead 77012 June 1, 2015: Monthly calibration from 10:48 – 11:28. 1 invalid hour(s).
June 3, 2015: Brief negative under range from 11:46 – 11:49. 0 invalid hour(s).
June 9, 2015: Government audit from 12:25 – 12:59. 1 invalid hour(s). June 15, 2015: Servicing from 11:41- 11:51 and monthly calibration from 13:00 – 13:48. 1 invalid hour(s).
June 25, 2015: Brief negative under range from 13:17 – 13:24. 0 invalid hour(s).
June 29, 2015: Brief negative under range from 16:48 – 16:49. 0 invalid hour(s).
Sunderland 77602
June 2, 2015: Government audit from 11:49 – 12:23. 1 invalid hour(s).
June 3, 2015: Brief negative under range from 11:46 – 11:48. 0 invalid hour(s). June 22, 2015: Monthly calibration from 11:51 – 13:44. 2 invalid hour(s).
June 25, 2015: Brief negative under range from 13:17 – 13:24. 0 invalid hour(s).
Wahnapitae 77603 June 2, 2015: Government audit from 9:55 – 10:32. 1 invalid hour(s).
June 22, 2015: Monthly calibration from 8:43 – 9:47. 2 invalid hour(s).
Falconbridge Met
DT2
June 14, 2015: Power outage from 6:02 – 8:18 and missing data from 8:19 – 18:34. 13 invalid hour(s).
TEM1
June 14, 2015: Power outage from 6:02 – 8:18 and missing data from 8:19 – 18:34. 13 invalid hour(s).
TEM3
June 14, 2015: Power outage from 6:02 – 8:18 and missing data from 8:19 – 18:34. 13 invalid hour(s).
WD
June 14, 2015: Power outage from 6:02 – 8:18 and missing data from 8:19 – 18:34. 13 invalid hour(s).
WS
June 14, 2015: Power outage from 6:02 – 8:18 and missing data from 8:19 – 18:34. 13 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
The following are the flagged conditions for each station for July 2015.
Vale Sites
Algonquin 77231 July 2, 2015: Annual preventative maintenance from 10:36 – 12:32. 3 invalid hour(s).
July 3, 2015: Annual preventative maintenance from 12:19 – 13:28. 2 invalid hour(s).
July 10, 2015: Monthly calibration from 13:09 – 13:56. 1 invalid hour(s). July 31, 2015: Power outage at 16:00 and from 16:03 – 16:36 and missing data from 16:37 – 17:33. 2
invalid hour(s).
Copper Cliff 77218
July 9, 2015: Monthly calibration from 9:50 – 10:37. 1 invalid hour(s).
Dozzi Park 77228 July 8, 2015: Monthly calibration from 13:21 – 14:01. 1 invalid hour(s).
Kelly Lake 77225 July 14, 2015: Monthly calibration from 8:23 – 9:22. 2 invalid hour(s).
Kinsmen 77227
July 3, 2015: Monthly calibration from 8:45 – 10:07. 1 invalid hour(s).
New Sudbury 77075
July 10, 2015: Monthly calibration from 10:14 – 11:14. 1 invalid hour(s).
Rayside 77206
July 7, 2015: Monthly calibration from 10:24 – 11:18. 2 invalid hour(s). July 19, 2015 at 3:11 – July 20 at 10:45: Instrument problems then servicing. 32 invalid hour(s).
Science North 77203
July 6, 2015: Monthly calibration from 9:46 – 10:38. 1 invalid hour(s) July 25, 2015: Servicing from 14:06 – 15:10. 1 invalid hour(s).
July 27, 2015: Servicing from 13:41 – 14:26. 2 invalid hour(s).
July 31, 2015: Power outage from 16:03 – 16:44 and brief under range at 16:01 and from 16:45 – 16:46. 1 invalid hour(s).
Spruce St 77230 July 14, 2015: Monthly calibration from 10:45 – 11:42. 1 invalid hour(s).
Union 77330
July 9, 2015: Monthly calibration from 12:01 – 12:42. 1 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
The following are the flagged conditions for each station for August 2015.
Vale Sites
Algonquin 77231 August 12, 2015: Monthly calibration from 8:57 – 10:01. 1 invalid hour(s).
August 24, 2015: Government audit from 11:26 – 11:56. 1 invalid hour(s).
Copper Cliff 77218
August 11, 2015: Monthly calibration from 12:50 – 13:47. 1 invalid hour(s).
August 24, 2015: Government audit from 10:07 – 10:42. 1 invalid hour(s).
Dozzi Park 77228
August 12, 2015: Monthly calibration from 13:03 – 13:56. 1 invalid hour(s).
August 26, 2015: Government audit from 12:20 – 12:59. 1 invalid hour(s).
Kelly Lake 77225
August 12, 2015: Monthly calibration from 10:58 – 12:05. 1 invalid hour(s). August 21, 2015: Power outage from 16:13 – 16:16. 0 invalid hour(s).
August 26, 2015: Government audit from 13:18 – 13:48. 1 invalid hour(s).
August 31, 2015: Instrument problems from 14:54 – 23:59. 9 invalid hour(s).
Kinsmen 77227
August 9, 2015: Brief negative under range at 13:45. 0 invalid hour(s).
August 11, 2015: Monthly calibration from 11:14 – 12:14. 1 invalid hour(s). August 24, 2015: Government audit from 9:22 – 9:51. 1 invalid hour(s).
New Sudbury 77075 August 21, 2015: Monthly calibration from 12:44 – 13:37. 2 invalid hour(s).
August 26, 2015: Government audit from 10:52 – 11:27. 1 invalid hour(s).
Rayside 77206 August 11, 2015: Monthly calibration from 9:10 – 10:19. 2 invalid hour(s).
August 25, 2015: Government audit from 12:50 – 13:22. 1 invalid hour(s).
Science North 77203
August 13, 2015: Monthly calibration from 13:23 – 14:08. 1 invalid hour(s).
August 24, 2015: Government audit from 12:29 – 12:58. 1 invalid hour(s). August 31, 2015: Brief negative under range from 10:14 – 10:15. 0 invalid hour(s).
Spruce St 77230
August 10, 2015: Servicing from 7:36 – 7:45 and monthly calibration 9:44 – 11:15. 3 invalid hour(s). August 18, 2015: Servicing from 9:45 – 9:49. 0 invalid hour(s).
August 27, 2015: Government audit from 9:21 – 10:09. 1 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
August 2, 2015: Brief negative under range from 7:48 – 7:50. 0 invalid hour(s). August 4, 2015: Monthly calibration from 11:46 – 12:41. 1 invalid hour(s).
August 7, 2015: Brief negative under range from 14:03 – 14:05. 0 invalid hour(s).
August 25, 2015: Government audit from 10:35 – 11:25. 2 invalid hour(s).
Sunderland 77602
August 1, 2015: Brief negative under range 18:21 – 18:23. 0 invalid hour(s). August 2, 2015: Brief negative under range at 7:50. 0 invalid hour(s).
August 19, 2015: Monthly calibration from 11:46– 12:40. 1 invalid hour(s).
August 20, 2015: Government audit from 11:15– 11:53. 1 invalid hour(s).
Wahnapitae 77603
August 18, 2015: Monthly calibration from 8:08 – 9:05. 1 invalid hour(s).
August 20, 2015: Government audit from 9:41 – 10:15. 2 invalid hour(s).
Falconbridge Met
DT2
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
WD
Nothing to report
WS
Nothing to report
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
The following are the flagged conditions for each station for September 2015.
Vale Sites
Algonquin 77231 September 5, 2015: Brief negative under range from 14:17 – 14:19. 0 invalid hour(s).
September 15, 2015: Monthly calibration from 13:05 – 14:02. 1 invalid hour(s).
Copper Cliff 77218
September 15, 2015: Monthly calibration and servicing from 11:21 – 16:05. 5 invalid hour(s).
September 21, 2015: Servicing from 8:46 – 8:59. 0 invalid hour(s).
Dozzi Park 77228
September 1, 2015 at 4:11 – September 2, 2015 at 7:28 and 7:44 – 8:39: Instrument problems then
servicing. 29 invalid hour(s). September 25, 2015: Monthly calibration from 12:10 – 13:12. 1 invalid hour(s).
Kelly Lake 77225 September 1, 2015 at 12:00 – September 2, 2015 at 10:29: Instrument problems and servicing. 35 invalid
hour(s).
September 4, 2015 at 3:11 – September 5, 2015 at 5:20: Instrument problems then servicing. 27 invalid
hour(s). September 8, 2015 at 3:11 – September 9, 2015 at 6:56: Instrument problems then servicing. 28 invalid
hour(s).
September 12, 2015 at 3:11 – September 13, 2015 at 8:24: Instrument problems then servicing. 30 invalid hour(s).
September 14, 2015: Servicing and missing data from 8:46 – 9:16, 9:39 – 10:53, 11:34 – 11:38, 11:57 –
13:21. 4 invalid hour(s). September 17, 2015 at 3:11 – September 19, 2015 at 7:20: Instrument problems and servicing. 53 invalid
hour(s).
September 19, 2015: Servicing from 13:16 – 13:27. 0 invalid hour(s).
September 20, 2015 at 3:11 – September 21, 2015 at 5:58: Instrument problems then servicing. 27 invalid hour(s).
September 21, 2015: Servicing and monthly calibration from 9:46 – 11:19 and 11:27 – 14:05. 4 invalid
hour(s). September 23, 2015 at 17:06 – September 25, 2015 at 20:27: Instrument problems then servicing. 52
invalid hour(s).
September 27, 2015: Brief negative under range from 18:02 – 18:04. 0 invalid hour(s). September 30, 2015: Servicing from 12:33 – 14:10. 2 invalid hour(s).
The large number of invalid hours for Kelly Lake station was due to an intermittent utilities power service.
The fluctuations in supply voltage (as high as 150 VAC) caused the instrument to lock up and stop collecting valid SO2 readings. These instrument lock ups occurred at various times and caused several
nightly auto calibration failures which resulted in invalidating data to previous valid auto calibration values
(sometimes over 24 hrs).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
The following are the flagged conditions for each station for October 2015.
Vale Sites
Algonquin 77231 October 15, 2015: Monthly calibration from 12:17 – 13:16. 2 invalid hour(s).
Copper Cliff 77218 October 13, 2015: Monthly calibration from 12:24 – 14:00. 2 invalid hour(s).
October 15, 2015: Power outage from 12:59 – 13:55. 1 invalid hour(s).
Dozzi Park 77228
October 15, 2015: Power outage from 12:59 – 14:14. 1 invalid hour(s).
October 26, 2015: Monthly calibration from 11:07 – 12:39. 2 invalid hour(s).
October 27, 2015: Instrument problems and servicing from 11:23 – 14:21. 4 invalid hour(s). October 29, 2015 at 23:42 – October 30, 2015 at 9:27: Instrument problems and then servicing. 11 invalid
hour(s).
Kelly Lake 77225
October 15, 2015: Power outage from 12:59 – 14:35. 2 invalid hour(s).
October 31, 2015: Servicing and monthly calibration from 20:48 – 22:10 and 22:14 – 22:28. 2 invalid
hour(s).
Kinsmen 77227
October 15, 2015: Power outage from 12:40 – 12:49 and 12:59 – 14:27. 2 invalid hour(s). October 22, 2015: Monthly calibration from 13:16 – 14:23. 2 invalid hour(s).
New Sudbury 77075 October 26, 2015: Monthly calibration from 8:11 – 9:46. 2 invalid hour(s).
Rayside 77206
October 5, 2015: Monthly calibration from 10:34 – 11:53. 2 invalid hour(s). October 15, 2015: Power outage from 12:45 – 12:48 and 12:59 – 14:28. 2 invalid hour(s).
Science North 77203 October 28, 2015: Monthly calibration from 9:50 – 10:41. 1 invalid hour(s).
Spruce St 77230 October 31, 2015: Monthly calibration from 18:38 – 19:56. 2 invalid hour(s).
Union 77330
October 13, 2015: Monthly calibration from 9:49 – 11:53. 2 invalid hour(s). October 15, 2015: Power outage from 12:59 – 13:59 and brief negative under range at 14:01. 1 invalid
hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
DT2 October 27, 2015: Missing data due to servicing from 9:37 – 14:00. 5 invalid hour(s).
TEM1 October 27, 2015: Missing data due to servicing from 9:37 – 14:00. 5 invalid hour(s).
TEM3 October 27, 2015: Missing data due to servicing from 9:37 – 14:00. 5 invalid hour(s).
WD1
October 27, 2015: Missing data due to servicing from 9:37 – 14:00. 5 invalid hour(s).
WD3 October 27, 2015: Missing data due to servicing from 9:37 – 14:00. 5 invalid hour(s).
WS1 October 27, 2015: Missing data due to servicing from 9:37 – 14:00. 5 invalid hour(s).
WS3
October 27, 2015: Missing data due to servicing from 9:37 – 14:00. 5 invalid hour(s).
Glencore Sites
Coniston 77028
October 15, 2015: Monthly calibration from 9:46 – 10:53. 1 invalid hour(s). October 15, 2015: Brief power outage at 13:17 and 14:11. 0 invalid hour(s).
Edison 77600
October 15, 2015: Brief power outage from 13:37 – 13:39. 0 invalid hour(s). October 29, 2015: Monthly calibration from 10:43 – 14:22. 5 invalid hour(s).
Garson 77065 October 8, 2015: Monthly calibration from 12:40 – 13:46. 2 invalid hour(s).
October 15, 2015: Brief power outage from 13:37 – 13:39. 0 invalid hour(s).
October 19, 2015: Brief power outage from 11:19 – 11:33. 0 invalid hour(s).
Hanmer 77013
October 5, 2015: Monthly calibration from 12:28 – 13:41. 2 invalid hour(s).
October 21, 2015: Servicing from 14:10 – 14:28. 1 invalid hour(s).
Parkinson 77601
October 15, 2015: Brief power outage from 13:37 – 13:39. 0 invalid hour(s). October 29, 2015: Monthly calibration from 8:33 – 10:22. 3 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
October 31, 2015: Instrument problems from 3:11 – 4:28, brief negative under range at 10:08 and servicing from 13:59 – 15:52. 4 invalid hour(s).
Skead 77012
October 8, 2015: Monthly calibration from 10:45 – 12:02. 1 invalid hour(s). October 20, 2015: Instrument problems and servicing from 1:29 – 5:16 and 9:52 – 10:33. 6 invalid hour(s).
October 22, 2015: Servicing from 7:27 – 10:31. 4 invalid hour(s).
Sunderland 77602
October 15, 2015: Power outage from 13:37 – 13:39. 0 invalid hour(s).
October 27, 2015: Monthly calibration from 9:34 – 10:30. 2 invalid hour(s).
Wahnapitae 77603
October 15, 2015: Brief power outage at 13:17 and 14:11. 0 invalid hour(s).
October 23, 2015: Monthly calibration from 12:45 – 13:50. 1 invalid hour(s).
Falconbridge Met
DT2
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
WD
Nothing to report
WS
Nothing to report
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
The following are the flagged conditions for each station for November 2015.
Vale Sites
Algonquin 77231 November 13, 2015: Monthly calibration from 11:31 – 12:34. 2 invalid hour(s).
Copper Cliff 77218 November 9, 2015: Monthly calibration from 8:47 – 9:41. 1 invalid hour(s).
Dozzi Park 77228 November 30, 2015: Monthly calibration from 13:56 – 15:11. 1 invalid hour(s).
Kelly Lake 77225
November 8, 2015 at 3:11 – November 9. 2015 at 7:50: Instrument problems, then servicing and monthly calibration. 29 invalid hour(s).
November 13, 2015: Servicing from 9:58 – 10:09. 0 invalid hour(s).
November 19, 2015: Servicing from 13:12 – 13:28. 1 invalid hour(s). November 25, 2015: Servicing from 9:35 – 11:14. 2 invalid hour(s).
Kinsmen 77227
November 6, 2015: Monthly calibration from 12:25 – 13:21. 2 invalid hour(s).
New Sudbury 77075
November 10, 2015: Servicing and monthly calibration from 16:46 – 19:32. 3 invalid hour(s).
Rayside 77206
November 10, 2015: Monthly calibration from 11:20 – 12:37. 2 invalid hour(s). November 22, 2015: Brief power outage from 7:37 – 7:39 and 14:26 – 14:31. 0 invalid hour(s).
Science North 77203
November 19, 2015: Monthly calibration from 10:24 – 11:29. 2 invalid hour(s).
Spruce St 77230
November 12, 2015: Monthly calibration and servicing from 12:47 – 14:34. 2 invalid hour(s). November 23, 2015: Servicing from 11:45 – 12:05. 0 invalid hour(s).
Union 77330 November 9, 2015: Monthly calibration from 10:16 – 11:01. 1 invalid hour(s).
November 18, 2015: Calibration verification from 10:03 – 10:58. 1 invalid hour(s).
CKNC Met
DT2
Nothing to report
TEM1
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
WD3 November 6, 2015: Positive over range from 8:10 – 8:13, 8:17 – 10:33. 3 invalid hour(s).
WS1
Nothing to report
WS3
Nothing to report
Glencore Sites
Coniston 77028
November 10, 2015: Brief power outage from 17:14, 17:37 and 17:38. 0 invalid hour(s). November 18, 2015: Monthly calibration from 13:56 – 15:08. 1 invalid hour(s).
Edison 77600
November 26, 2015: Monthly calibration from 12:07 – 12:57. 1 invalid hour(s).
Garson 77065
November 16, 2015: Monthly calibration from 14:26 -15:19. 2 invalid hour(s).
Hanmer 77013
November 10, 2015: Monthly calibration from 13:47 – 14:47. 1 invalid hour(s). November 30, 2015: Servicing from 12:50 – 13:07. 0 invalid hour(s).
Parkinson 77601
November 25, 2015: Monthly calibration and servicing from 9:45 – 14:40. 5 invalid hour(s). November 29, 2015: Servicing from 13:30 – 15:10. 2 invalid hour(s).
Skead 77012 November 24, 2015: Monthly calibration from 11:34 – 12:28. 2 invalid hour(s).
Sunderland 77602
November 24, 2015: Servicing from 10:09 – 10:46. 1 invalid hour(s). November 26, 2015: Monthly calibration from 9:01 – 10:09. 1 invalid hour(s).
Wahnapitae 77603 November 23, 2015: Monthly calibration from 13:42 – 14:39. 2 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
The following are the flagged conditions for each station for December 2015.
Vale Sites
Algonquin 77231 December 3, 2015 at 3:11 – December 4, 2015 at 5:08: Instrument problems, then servicing. 26 invalid
hour(s).
December 8, 2015: Government audit from 13:34 – 14:03. 1 invalid hour(s). December 17, 2015: Monthly calibration from 10:26 – 11:12. 1 invalid hour(s).
Copper Cliff 77218 December 2, 2015: Monthly calibration from 11:26 – 12:44. 2 invalid hour(s).
December 17, 2015: Government audit from 10:10 – 10:49. 1 invalid hour(s).
December 24, 2015: Brief negative under range from 6:51 – 6:53. 0 invalid hour(s).
Dozzi Park 77228
December 10, 2015: Government audit from 12:43 – 13:17. 2 invalid hour(s).
December 21, 2015: Monthly calibration from 9:34 – 10:35. 2 invalid hour(s).
Kelly Lake 77225
December 10, 2015: Government audit from 13:31 – 13:57. 1 invalid hour(s).
December 13, 2015: Servicing from 11:46 – 12:07. 0 invalid hour(s). December 21, 2015: Monthly calibration from 12:35 – 13:42. 2 invalid hour(s).
December 24, 2015: Brief power outage at 12:11. 0 invalid hour(s).
Kinsmen 77227
December 2, 2015: Monthly calibration from 9:47 – 11:02. 1 invalid hour(s).
December 9, 2015: Government audit from 14:25 – 15:02. 1 invalid hour(s).
New Sudbury 77075
December 10, 2015: Government audit from 10:43 – 11:33. 2 invalid hour(s).
December 23, 2015: Monthly calibration from 9:58 – 10:52. 1 invalid hour(s).
Rayside 77206
December 1, 2015: Monthly calibration from 9:48 – 11:04. 1 invalid hour(s). December 7, 2015: Government audit from 14:12 – 14:42. 1 invalid hour(s).
December 24, 2015: Brief negative under range from 7:04 – 7:06. 0 invalid hour(s).
Science North 77203
December 8, 2015: Government audit from 12:39 – 13:14. 1 invalid hour(s).
December 21, 2015: Monthly calibration from 11:02 – 11:53. 1 invalid hour(s).
Spruce St 77230
December 7, 2015: Government audit from 12:49 – 13:26. 1 invalid hour(s).
Union 77330
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
December 2, 2015: Monthly calibration from 13:48 – 14:47 . 1 invalid hour(s). December 17, 2015: Government audit from 12:08 – 12:46. 1 invalid hour(s).
CKNC Met
DT2
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
WD1
Nothing to report
WD3
Nothing to report
WS1
Nothing to report
WS3
Nothing to report
Glencore Sites
Coniston 77028 December 1, 2015: Monthly calibration from 13:40 – 14:40. 2 invalid hour(s).
December 8, 2015: Government audit from 10:25 – 10:59. 1 invalid hour(s).
Edison 77600 December 1, 2015: Government audit from 10:52 – 11:19. 1 invalid hour(s).
December 15, 2015: Monthly calibration from 14:13 – 15:00. 1 invalid hour(s).
Garson 77065
December 3, 2015: Monthly calibration from 14:08 – 15:09. 1 invalid hour(s).
December 8, 2015: Government audit from 11:19 – 11:50. 1 invalid hour(s).
Hanmer 77013
December 4, 2015: Monthly calibration from 11:17 – 12:36. 2 invalid hour(s).
December 9, 2015: Government audit from 13:00 – 13:34. 1 invalid hour(s). December 16, 2015: Servicing from 13:51 – 14:43. 1 invalid hour(s).
December 24, 2015: Power outage from 7:20 – 8:42. 2 invalid hour(s).
Parkinson 77601
December 1, 2015: Government audit from 10:09 – 10:39. 1 invalid hour(s).
December 15, 2015: Monthly calibration from 12:32 – 13:45. 2 invalid hour(s).
Skead 77012
December 1, 2015: Monthly calibration from 11:53 – 12:50. 1 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation