Affordable Housing in Partnership (AHP) Scheme And Mukhya Mantri GRUH Yojana Proposal for EWS Scheme (Green field) Phase –I for 1491 Dwelling Units VADODARA MUNICIPAL CORPORATION Affordable Housing Mission, Urban Development and Urban Housing Department, Gujarat
32
Embed
VADODARA MUNICIPAL CORPORATIONmohua.gov.in/upload/uploadfiles/files/5_12th_csmc_ahp...Sr. No. Description VADODARA 1 Population (Census 2011) 16,66,703 2 Area 159.31 Sq.Km 3 Population
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Affordable Housing in Partnership (AHP) Scheme And Mukhya Mantri GRUH Yojana
Proposal for EWS Scheme (Green field) Phase –I for 1491 Dwelling Units
VADODARA MUNICIPAL CORPORATION Affordable Housing Mission, Urban Development and Urban Housing
Department, Gujarat
Sr. No.
Description VADODARA
1 Population (Census 2011) 16,66,703
2 Area 159.31 Sq.Km
3 Population Density 104 person/ha
4 No. of Administrative Zone 4
5 No. of Ward 12
6 Election Ward 25
VADODARA : City Profile
Need of the Project (EWS Scheme)
Migration of people to large cities results in Housing shortage.
People from Economical Weaker Section are not able to purchase
houses from private developers.
EWS DU’s are subsidised by State and Central Govt.
Beneficiaries will get EWS DU’s with all Infrastructure facilities for
Rs. 3.00 Lacs only.
Under this scheme EWS people shall able to get a house on
Affordable price, results in reduction of Slums.
Salient Features of Scheme
VMC has engaged Project Management Consultant and Third Party Inspection Agency for Quality Control.
Earthquake Resistant RCC framed structure.
Common plot with children’s play area, Garden, Landscaping and other common amenities like Health Centre/ Aanganwadi /Community hall etc.
Compound wall with Security cabin & Main gate.
Vitrified tiles flooring in all the rooms.
Kota stone platform in kitchen with Glazed tile dado.
Defect liability period for the buildings 10 years from the date of completion.
Land Ownership of all plots is with VMC
Selection of Beneficiaries
The applications are invited by VMC in collaboration with three banks viz. ICICI, HDFC & AXIS bank.
The beneficiaries who does not have their own house in Vadodara city in the name of husband and wife and having yearly income less than Rs. 1.00 lakh are eligible to apply.
Till date a total of 1100 applications are received for EWS scheme.
The selection of beneficiaries shall be done by computerized draw system.
The allotted leasehold DUs shall be joint ownership of the spouse, subsequently female will have first right on property and shall be so entered in all the relevant records including stamp duty registration and property card.
Stamp Duty Registration of the dwelling unit shall be made on Rs.100/- Stamp paper.
The beneficiary shall be granted leasehold property rights for first 7 years and freehold property rights thereafter only for DU.
Ownership of the land shall remain with the VMC.
Location Map of EWS Housing Plots
N
T.P. 1 (Sayajipura), F.P. No. 109
T.P. 1 (Sayajipura), F.P. No. 115
T.P. 2 (Sayajipura), F.P. No. 39
T.P. 1 (Sayajipura), F.P. No. 124
T.P. 15 (Saiyad-vasna), F.P. No.103
T.P. 21 (Atladra), F.P. No.104
Location Plan of Scheme
Land, Location and Ownership
Package Location TP No.
FP No.
Area (in Sq. mt.)
Adjoining Road Width (mt.)
Purpose
Land ownership
Package-1 Sayajipura 1 109 2297.00 18.00
Social & Economic Weaker Section Housing
Vadodara Municipal Corporation
Sayajipura 1 115 2637.00 15 & 18
Package-1
Sayajipura 1 124 1856.00 18 & 12
Sayajipura 2 39 4759.00 12.00
Package-3 Atladara 21 104 6092.00 12.00
Package-4 Saiyad-vasna
15 103 5056.00 9.00
Total 22706.00
EWS Housing Detail (Actual planned as per Town Planning rules)
Project Cost Contribution (Physical and Financial) EWS 1491 DU’s
Sr. No. Nos. of
DU’s
Total Project
Cost (Rs.
Lakh)
Central Share @
Rs 75,000/- per DU
(Rs. Lakh)
State Share @ Rs
1,50,000/- per DU
(Rs. Lakh)
ULB Share
(Rs. Lakh)
Beneficiary Share @ Rs
284000/- per DU
(Rs. Lakh)
1. 1491 7978.28 1118.25 2236.50 389.09 4234.44
Project Cost Contribution (Physical and Financial) EWS 1491 DU’s
Sr. No.
Project Components Total Project Cost
Central Share @ Rs 75000/- per DU
State Share @ Rs 100000/- per DU
ULB Share
Beneficiary Share @ Rs 284000/- per DU
A
Housing Construction of 1491 DUs, Rs. 432538/- per DU with Carpet area ranging from 26.12 and 26.62 m2 having 1 Bed room, Hall, Kitchen, Wash area with WC & Bath including contingency/supervision and O&M charges @7%
6900.58 1118.25 1491 56.89149 4234.44
Sub Total (A) 6900.58 1118.25 1491.00 56.89 4234.44