Top Banner
Utah Collaborative Active Transportation Study
15

Utah Collaborative Active Transportation Study. Regional Collaboration.

Dec 25, 2015

Download

Documents

Donald Kelley
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Utah Collaborative Active Transportation Study.  Regional Collaboration.

Utah Collaborative Active Transportation Study

Page 2: Utah Collaborative Active Transportation Study.  Regional Collaboration.

Regional Collaboration

Page 3: Utah Collaborative Active Transportation Study.  Regional Collaboration.

Overview: Goals Lay groundwork for urban network of

bicycle facilities▪ All abilities, all ages

Enhance active transportation connections to transit

Demonstrate quality of life benefits▪ Economic, health, environment

Page 4: Utah Collaborative Active Transportation Study.  Regional Collaboration.

UCATS Schedule

August 2012•Goals•PI Strategy

October 2012•No Boundaries•Demographics•Bike-onomics

January 2013•Latent Demand

•Selection Criteria

•Pedestrian Barriers

April 2013•Proposed Projects

•Top 25

June 2013•Economics•Health

August 2013•Cost estimates

• Implementation

Page 5: Utah Collaborative Active Transportation Study.  Regional Collaboration.

Analysis No Boundaries map Station area

walkability Demographics and

Barriers: UHTS Bike-onomics Pedestrian and

bicycle demand Health impacts

Page 6: Utah Collaborative Active Transportation Study.  Regional Collaboration.

UCATS Projects - Ranking Matrix

Project 1 Project 2 Project 3 Project 4 Project 5UCATS Goals: Create an urban bike network for users of all ages/abilities; enhance active transportation to transit; demonstrate quality-of-life benefits.

Tier 1 Criteria

Does it support an urban bike network? Does it enhance access to transit?

Tier 2 Criteria

Does it score well in the latent demand model? Does it reflect local planning priorities?

Can it demonstrate an economic benefit? Does it overcome a barrier?

Page 7: Utah Collaborative Active Transportation Study.  Regional Collaboration.

Top 25 Regional Connectivity projects (MAG) Historic Utah Southern Rail corridor

• Trail feasibility study• Evaluate right-of-way,

constraints, opportunities, crossing treatments, funding, and other elements

Page 8: Utah Collaborative Active Transportation Study.  Regional Collaboration.

Top 25 Regional Connectivity projects (MAG) State Street

• Bike lanes: Pleasant Grove, Lindon, Orem

• Pleasant Grove Blvd to 800 North

• UDOT/municipal coordination

• On-street parking evaluation

Page 9: Utah Collaborative Active Transportation Study.  Regional Collaboration.

Top 25 Regional Connectivity projects (MAG) 900 East

• Bike lanes• University Parkway to

900 South• Connects to proposed

600 South bike lanes• Connects to existing

State Street facilities at 900 South

Page 10: Utah Collaborative Active Transportation Study.  Regional Collaboration.

Top 25 Regional Connectivity projects (MAG) 500 West

• Bike lanes and bike boulevards

• Bulldog Boulevard to 1560 South

• Consistency with Provo bike master plan

Page 11: Utah Collaborative Active Transportation Study.  Regional Collaboration.

Top 25 Regional Connectivity projects (MAG) US-89

• Buffered bike lanes • 1860 South to Center

Street (Provo to Springville)

Page 12: Utah Collaborative Active Transportation Study.  Regional Collaboration.

Top 25 Access to Transit projects (MAG) American Fork FrontRunner

• 200 South bike lanes• Connect to existing

trail on Spring Creek Ranch Road

• Wayfinding from downtown to rail station

Page 13: Utah Collaborative Active Transportation Study.  Regional Collaboration.

Top 25 Access to Transit projects (MAG) Orem FrontRunner

• Pedestrian/bicycle bridge

• Connect station to UVU• Alternatives currently

under study

Page 14: Utah Collaborative Active Transportation Study.  Regional Collaboration.

Top 25 Access to Transit projects (MAG) Provo Intermodal Hub

• 600 South bike lanes• Intersection

improvements: crosswalks, curb ramps, ADA enhancements

• Freedom Boulevard bike lanes

Page 15: Utah Collaborative Active Transportation Study.  Regional Collaboration.

Questions?