UTA Site Report Jae Yu UTA Site Report 6 th DOSAR Workshop University Mississippi Apr. 17 – 18, 2008 Jae Yu Univ. of Texas, Arlington
22

UTA Site Report

Jan 04, 2016

Download

Documents

fuller-knight

UTA Site Report. Jae Yu Univ. of Texas, Arlington. 6 th DOSAR Workshop University Mississippi Apr . 1 7 – 1 8, 200 8. Introduction. UTA a partner of ATLAS SWT2 Actively participating in ATLAS production Kaushik De is co-leading Panda development - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: UTA Site Report

UTA Site ReportJae Yu

UTA Site Report

6th DOSAR WorkshopUniversity Mississippi

Apr. 17 – 18, 2008

Jae YuUniv. of Texas, Arlington

Page 2: UTA Site Report

4/17/2008 2UTA Site ReportJae Yu

• UTA a partner of ATLAS SWT2– Actively participating in ATLAS production

• Kaushik De is co-leading Panda development• Phase I implementation at UTACC completed and running• Phase II implementation at Physics and Chemistry Research Building

completed– MonALISA based OSG Panda monitoring back online– DDM monitoring project completed– Working on Achelois, the ATLAS Operations Support System

• HEP group working with other discipline in shared use of existing computing resources– Interacting with the campus HPC community

• Working with HiPCAT, Texas grid community• Co-Linux Condor cluster setup began but going very s-l-o-w

Introduction

Page 3: UTA Site Report

4/17/2008 3UTA Site ReportJae Yu

• UTA HEP-CSE + UTSW Medical joint project through NSF MRI

• Primary equipment for D0 re-reconstruction and MC production up to 2005

• Now primarily participating in ATLAS MC production and reprocessing at part of SWT2 resources

• Other disciplines also use this facility but at a minimal level– Biology, Geology, UTSW medical, etc

• Hardware Capacity– PC based Linux system assisted by some 70TB of IDE disk storage– 3 IBM PS157 Series Shared Memory system

• Now being turned into a T3 cluster

UTA DPCC – The 2003 Solution

Page 4: UTA Site Report

4/17/2008 4UTA Site ReportJae Yu

UTA – DPCC•100 P4 Xeon 2.6GHz CPU = 260 GHz•64TB of IDE RAID + 4TB internal•NFS File system

•84 P4 Xeon 2.4GHz CPU = 202 GHz•5TB of FBC + 3.2TB IDE Internal•GFS File system

•Total CPU: 462 GHz•Total disk: 76.2TB•Total Memory: 168Gbyte•Network bandwidth: 68Gb/sec

•HEP – CSE Joint Project•DØ+ATLAS•CSE Research

Page 5: UTA Site Report

4/17/2008 5UTA Site ReportJae Yu

UTA Tier3 • Conversion of UTA_DPCC

– Commissioned 2003 – NSF-MRI grant between CSE, HEP, UT-SWM– Shared resource– 160 cores (Dual Processor 32bit Xeon)– 1GB RAM / core– 45 TB NAS based storage– Rocks 4.3 with SLC 4.6– Several head nodes

Page 6: UTA Site Report

4/17/2008 6UTA Site ReportJae Yu

Tier 3 specific customizations

• Exploring with Scalla topology• Provide rootd storage to desktop• Provide platform for experimenting with

PROOF• Testbed for T2 T3 interactions• Still maintain production activities• Panda Development

Page 7: UTA Site Report

4/17/2008 7UTA Site ReportJae Yu

• Joint effort between UTA, OU, LU and UNMSWT2

2000ft2 in the new buildingDesigned for 3000 1U nodesCould go up to 24k cores1MW Total power capacityCooling with 5 Livert units

Page 8: UTA Site Report

4/17/2008 8UTA Site ReportJae Yu

UTA SWT2 Clusters• UTA_SWT2 (Phase I)

– Supporting MC Production only– Initial deployment of ATLAS project funds

• SWT2_CPB (Phase II)– Supporting MC production and analysis– Main cluster for UTA– Project Funded

• UTA_DPCC – Supporting MC production and local analysis– Tier3 prototype – Supporting production system software development– NSF MRI Grant

Page 9: UTA Site Report

4/17/2008 9UTA Site ReportJae Yu

Installed SWT2 Phase I Equipment• 160 Node cluster (Dell SC1425)

– 320 cores (3.2GHz Xeon EM64T)– 2GB RAM/core– 160GB SATA local disk drive

• 8 Head Nodes (Dell 2850)– Dual 3.2 GHz Xeon EM64T– 8GB RAM– 2x 73GB (RAID1) SCSI Storage

• 16TB Storage System– Direct Data Networks S2A3000 system

• 80x250GB SATA drives– 6 I/O servers– IBRIX Fusion file system – Dedicated internal storage network (Gigabit Ethernet)

• Has been operating and conducting Panda production over a year

Page 10: UTA Site Report

4/17/2008 10UTA Site ReportJae Yu

UTA_SWT2 (Phase I) Services

• OSG 0.8 Compute Element• ATLAS specific Gatekeeper• Local Replica Catalog• DQ2 Site-services (supports all of SWT2)• Redundant GUMS server for UTA resources

Page 11: UTA Site Report

4/17/2008 11UTA Site ReportJae Yu

SWT2 Phase II (CPB) Equipment• 50 node cluster (SC 1435)

– 200 Cores (2.4GHz Dual Opteron 2216)– 8GB RAM (2GB/core)– 80 GB SATA disk

• 2 Head nodes– Dual Opteron 2216– 8 GB RAM– 2x73GB (RAID1) SAS Drives

• 75 TB (raw) Storage System– 10xMD1000 Enclosures– 150x500GB SATA Disk Drives– 8 I/O Nodes– DCache will be used for aggregating Storage

• 10GB internal network capacity• In service• Future purchases will focus more on the storage

Page 12: UTA Site Report

4/17/2008 12UTA Site ReportJae Yu

SWT2_CPB Services

• OSG 0.8 Compute Element• Local Replica Catalog• GUMS server for all UTA Resources

Page 13: UTA Site Report

4/17/2008 13UTA Site ReportJae Yu

ATLAS SWT2 Phase I and II

SWT2-PH2@UTACPB

•320 Xeon 3.2 GHz cores = 940 GHz•2GB Ram/core = 640GB•160GB Internal/unit 25.6TB•8 dual core server nodes•16TB of storage assisted by 6I/O server•Dedicated Gbit internal connections

SWT2-PH1@UTACC

•200 Optaron 3.2 GHz cores = 640 GHz•2GB Ram/core = 400GB•8GB SATA /unit 4TB•8 dual core server nodes•75TB of storage by 10 Dell MD100 Raid assisted by 8 I/O servers•Dedicated Gbit internal connections

Page 14: UTA Site Report

4/17/2008 14UTA Site ReportJae Yu

SWT2 Growth

Courtesy M. Ernst US ATLAS Transparent Distributed Facility Workshop 3/04/08

Page 15: UTA Site Report

4/17/2008 15UTA Site ReportJae Yu

ATLAS SWT2 Capacity • Current Capacity for Project Funded

Resources– Total CPU ~ 1,200K SI2K– Total Disk ~ 92TB (usable)

• Additions to SWT2_CPB– Total CPU ~ 2,200K SI2K– Total Disk ~ 300TB (usable)

• Future Purchases will be weighted more to storage growth

Page 16: UTA Site Report

4/17/2008 16UTA Site ReportJae Yu

• Had DS3 (44.7MBits/sec) till late 2004– Choke the heck out of the network for about a month

downloading D0 data for re-reconstruction– Met with VP of Research at UTA and emphasized the

importance of network backbone for attracting external funds• Increased to OC3 (155 MBits/s) early 2005• OC12 as of early 2006 • Connected to NLR (10GB/s) through LEARN (

http://www.tx-learn.org/) via 1GB connection to NTGP– $9.8M ($7.3M for optical fiber network) state of Texas funds

approved in Sept. 2004• Most areas on LEARN lit• The “Last Mile” connection problem still exists

Network Capacity History at UTA

Page 17: UTA Site Report

4/17/2008 17UTA Site ReportJae Yu

LEARN Statushttp://www.tx-learn.org/networkmap.cfm

Page 18: UTA Site Report

4/17/2008 18UTA Site ReportJae Yu

NLR – National LambdaRail

10GB/sec connections

LONI

ONENET

LEARN

Page 19: UTA Site Report

4/17/2008 19UTA Site ReportJae Yu

Software Development Activities • MonALISA based ATLAS distributed analysis

monitoring – A good, scalable system– Software development and implementation completed

• ATLAS-OSG sites are on the LHC Dashboard– New server brought back into service for OSG at UTA

• Completed a DDM monitoring project• Working on Achelois, the ATLAS Operations Support

System

Page 20: UTA Site Report

4/17/2008 20UTA Site ReportJae Yu

CSE Student Exchange Program • Joint effort between HEP and CSE

– David Levine, Gergley Zaruba and Manfred Huber are primary contacts at CSE• A total of 10 CSE MS Students each have worked in SAM-Grid team

– Five generations of the student– Many of them playing leading roles in grid community

• Abishek Rana at UCSD• Parag Mashilka at FNAL• Sudhamsh Reddy worked for UTA and back into Ph.D program

• New program with BNL implemented– First student on completed the tenure and is on job training– Second set of two Ph.D. students at BNL and completing their tenure– Participating in ATLAS Panda monitoring project– One student working on pilot factory using condor glide-in

• Finalizing the integration into the regular service– Facing some budget cut issues here

Page 21: UTA Site Report

4/17/2008 21UTA Site ReportJae Yu

The LAW Project • Co-Linux based Condor System OU established as the model• Had a meeting between OU team and UTA IT management in

Feb. during the HiPCAT meeting– We are very grateful for the OU team willing to come and help

• A team of UTA IT personnel designated to work on this project, looking into various aspects– Head of Academic Computing Services is the lead

• Had a meeting with her two weeks ago– 28 new machine lab in Engineering as the trial case– IT wants to start with 5 machines or so first– IT will manage and support based software, OS and Co-Linux– All other software related responsibilities on HEP

Page 22: UTA Site Report

4/17/2008 22UTA Site ReportJae Yu

Conclusions• MonALISA based panda monitoring providing info to LHC

Dashboard– New server was brought up Waiting for BNL to separate panda

monitor servers out• Completed a project in DDM monitoring• Completed EG2 (photon) CSC note• Plan to connect to 10GB/s NLR via 1GB connection to UTD

– Quite expensive to make the final connectio• Involved in ATLAS Computing Operations Support• Working closely with HiPCAT for State-wide grid activities• Started working on setting up a Co-Linux Condor Cluster