Top Banner
USR-WS (Beijing) Oct. 30 – Nov. 1, 201 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade ) SPring-8 Upgrade Plan Preliminary Report (Jan. 20 http://www.spring8.or.jp/en/about_us/whats_sp8/spring-8_II/top.html
22

USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Dec 15, 2015

Download

Documents

Lexi Jewkes
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

USR-WS (Beijing)Oct. 30 – Nov. 1, 2012

K. Soutome (JASRI / SPring-8)on behalf of

SPring-8 Upgrade Working Group

Injection Scheme for the SPring-8 Upgrade

cf.) SPring-8 Upgrade Plan Preliminary Report (Jan. 2012)http://www.spring8.or.jp/en/about_us/whats_sp8/spring-8_II/top.html

Page 2: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Issues and Our ApproachInjection to a Ring with a Small Dynamic Aperture

@ x = 25 m, y = 8 m

SPring-8 II, 6BA Lattice

Page 3: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Issues and Our ApproachInjection to a Ring with a Small Dynamic Aperture

A high-quality injection beam is needed.

@ x = 25 m, y = 8 m

SPring-8 II, 6BA Lattice

Page 4: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Issues and Our ApproachInjection to a Ring with a Small Dynamic Aperture

A high-quality injection beam is needed. SACLA (XFEL) Linac is used as a full-energy injector.

Emittance: 60 pmrad (projected)Energy Spread: 0.05 % (rms)Bunch Length: < 100 fs (rms)Electron Charge: 300 pCRepetition Rate: 1 Hz ( 60 Hz)

SACLA

StorageRing

Booster

Beam Parameters(8GeV)

Page 5: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Issues and Our ApproachInjection to a Ring with a Small Dynamic Aperture

A high-quality injection beam is needed. SACLA (XFEL) Linac is used as a full-energy injector.

High-beta is favorable at injection section.

Page 6: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Issues and Our ApproachInjection to a Ring with a Small Dynamic Aperture

A high-quality injection beam is needed. SACLA (XFEL) Linac is used as a full-energy injector.

High-beta is favorable at injection section.

But for achieving higher brilliance, low-beta is favorable.

Page 7: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Issues and Our ApproachInjection to a Ring with a Small Dynamic Aperture

A high-quality injection beam is needed. SACLA (XFEL) Linac is used as a full-energy injector.

High-beta is favorable at injection section. Long straight section is used for injection.

High-Beta at LSS and Low-Beta at Normal Straight

LSS

Normal

Straight

Page 8: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Issues and Our ApproachInjection to a Ring with a Small Dynamic Aperture

A high-quality injection beam is needed. SACLA (XFEL) Linac is used as a full-energy injector.

High-beta is favorable at injection section. Long straight section is used for injection.

High-Beta at LSS and Low-Beta at Normal Straight For various filling pattern, off-axis injection is needed.

Page 9: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Issues and Our ApproachInjection to a Ring with a Small Dynamic Aperture

A high-quality injection beam is needed. SACLA (XFEL) Linac is used as a full-energy injector.

High-beta is favorable at injection section. Long straight section is used for injection.

High-Beta at LSS and Low-Beta at Normal Straight For various filling pattern, off-axis injection is needed. Bucket-by-Bucket Injection with Fast Kickers

High-purity single bunch is possible (at high-current).

On-axis injection is also possible.

Page 10: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Issues and Our ApproachInjection to a Ring with a Small Dynamic Aperture

A high-quality injection beam is needed. SACLA (XFEL) Linac is used as a full-energy injector.

High-beta is favorable at injection section. Long straight section is used for injection.

High-Beta at LSS and Low-Beta at Normal Straight For various filling pattern, off-axis injection is needed. Bucket-by-Bucket Injection with Fast Kickers

High-purity single bunch is possible (at high-current).

On-axis injection is also possible.

Compensation for short lifetime is needed.

In addition to the above ...

Page 11: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Issues and Our ApproachInjection to a Ring with a Small Dynamic Aperture

A high-quality injection beam is needed. SACLA (XFEL) Linac is used as a full-energy injector.

High-beta is favorable at injection section. Long straight section is used for injection.

High-Beta at LSS and Low-Beta at Normal Straight For various filling pattern, off-axis injection is needed. Bucket-by-Bucket Injection with Fast Kickers

High-purity single bunch is possible (at high-current).

On-axis injection is also possible.

Compensation for short lifetime is needed.

In addition to the above ...

Top-Up (+ Bunch Length Control, Coupling Control ...)

Page 12: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Fast Kicker System

Kicker Design and R&D for New Injection Scheme by T. Nakamura

Fast TEM mode Kicker ( ~ 2ns )

Beam

High Power Pulser

50kV (FID FPG-50 )

* Upper outer conductor is removed.

Length 0.2m (time constant~ 1.3ns)

High Power Pulser

50kV (FID FPG-50 )

Kicker : Unit x 5

Page 13: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Fast Kicker System: Time Structure

Output of High Power Pulser 50kV (FID FPG-50 )

Kick Strength ( L = 0.2m ) with MAFIA-T3

2ns : bucket spacing

Additional Correction Kicker might be required for neighboring bunches.

Should be smaller than 1/10

Page 14: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Fast Kicker System: Field Distribution

1 V -1 V -1 V -1 V

10mm

Dipole Kick for On-axis Injection

Quadrupole Kickfor Off-axis Injection

Kick Field = 0

Injected beam

Stored beam

Field Strength ~ 1/(vertical gap) Counter Propagating TEM Mode ( Kick by Ex ) = ( Kick by By ) => Total Kick = 2 Ex

Page 15: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Fast Kicker System: Field Strength

Dipole Kick11 MeV/m (+50kV, -50kV)

-0.45 V

Quadrupole Kick at 2mm 4 MeV/m (+50kV, +50 kV)

-1V

-1V

Stored Beam

Off-axis Injected

On-axis Injected

Page 16: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Fast Kicker System: Injection (Schematic)

Swapped outFrom SACLA linac

βH = 25m

15 mm 15 mm0.6 m rad

βH = 25m βH = 25m

Dipole Field

0.08 m rad

2mm 15mm0.6 m rad

Quadrupole Field

+50 kV, +50 kV

+18 kV, -18 kV

0.6 m rad x 6 GeV = 3.6 MeV

5 units (0.2m) < 2 m

Off-axis

On-axis

Page 17: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Injection at LSSExample Schemewith Three Sets of Fast Kickers

Dynamic Aperture

x = y =

(Off-Axis)

Page 18: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Injection at LSS

injected beamx = 0.05 0.15 mm (CSR dependent)

stored beamx 0.02 mm

clearance > 61 mm

2 mm

1 mm 1 mm ( @ x = 5 m )

injected beamafter revolutions

Example Schemewith Three Sets of Fast Kickers(Off-Axis)

Page 19: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Injection at LSSExample Schemewith Three Sets of Fast Kickers(On-Axis)

x = y =

Page 20: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Summary of Our Injection Scheme

> SACLA (XFEL) Linac (A beam transport line to the booster

extraction point is under construction. Beam test is planned.)

> High Quality Injection Beam for Small Dynamic Aperture

> 30m Long Straight Section for Injection

> Fast Kicker System for Bucket-by-Bucket Injection

> On-Axis Swap Injection for Beam Tuning

Off-Axis Injection for User-Operation at 300mA

(Operation at 100mA is possible by on-axis swap injection.)

> Flexibility of Filling Pattern

> Top-Up for Short Beam Lifetime

NOTE: Suppression (or control) of CSR effects in the beam transport line ( 750m) is important, and this is under discussion.

Page 21: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Another Possible Scheme:Injection with Pulsed Multipole Magnets

Double-PQM Scheme by M.Takao

Additional upstream pulsed quadrupole magnet separated by n in betatron phase will suppress the quadrupole oscillation mode of a stored beam.

Downstream PQMUpstream PQM

n

injected beam

stored beam

Injection with a Pulsed Quadrupole Magnet K.Harada et al., PRST-AB 10 (2007)123501 @ KEK

Injection with a Pulsed Sextupole MagnetH.Takaki et al., PRST-AB 13 (2010) 020705 @ KEK S.C.Leemann, PRST-AB 15 (2012) 050705 @ MAX IV

kick

n

Page 22: USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.

Another Possible Scheme:Injection with Pulsed Multipole Magnets

Downstream PQMfor Injection

Upstream PQMfor SuppressingQuad. Mode Osc.

x = y =

injected beam

stored beam