Using Virtual Infrastructure as a Recovery Platform for Physical Production Servers John Stetic Director of Product Management and Services PlateSpin Ltd. [email protected] www.platespin.com
45

Using Virtual Infrastructure as a Recovery Platform for ...download3.vmware.com/vmworld/2006/bct9560.pdfUsing Virtual Infrastructure as a Recovery Platform for Physical Production

Jan 26, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Using Virtual Infrastructure as a Recovery Platform for Physical Production Servers

    John Stetic

    Director of Product Management and ServicesPlateSpin [email protected]

  • About PlateSpin

    Global independent software vendor, headquartered in Toronto, Canada

    Customers and resellers in Europe, Asia Pacific, North and South America

    2000+ satisfied customers, two lead products:PlateSpin PowerConvertPlateSpin PowerRecon

    Experts in solutions for virtualized data centers

    VMware Technology Alliance Partner

    Microsoft Certified Partner

    http://www.platespin.com/corporate/newsdetails.aspx?id=151

  • Overview

    The Availability ChallengeThe OptionsVirtualization as a Breakthrough TechnologyHow it Works

  • Solution OptionsSolution Notes RPO/RTO/Cost

    Server Clustering Duplicate Hardware

    Complicated Setup

    0 / 0 / $$$$

    P2V RecoveryConsolidated recoveryPower on recoveryTouch less management

    hours / min / $$

    Limited Restore Flexibility

    Slow Staged RestoreDisk Imaging 24h / hours / $$$

    Tape / Manual Rebuild

    Difficult to Administer

    Slow, Prone to Errors24h+ / days / $

  • Consolidated RecoveryEnvironment

    Benefits of Backing up to a VM

    Store backups in a run-able formatReduce RTOUniquely speeds DR testing times

    Highly portable and encapsulated backupsSimplify off site transportIncrease restore flexibility

    Maximize restore resourcesManage recovery service levelsOver commit resources for cost savings

  • PlateSpin’s OS Portability Technology

    Server consolidation

    Recovery

    Hardware migration

    Test lab creation

    Provisioning

    Decouple workload from host infrastructure

    Deploy or recover workload from

    archives and backups

    Peer-to-Peer, live and incremental workload

    movement

    Reconfigure workloads dynamically

    Connect, drag-and-drop, walk away

  • The Availability Life Cycle

    Configure

    Plan

    Test

    BackupReplicate

    Inventory

    Failover

    Restore

  • Bridging the Physical to Virtual Divide

    A one time manual conversion is not enoughResource assignmentAutomation and AuditingRepeatabilityFail back

    PlateSpin’s OS Portability Technology enables:Automatically deal with the reconfiguration of the low level OSConfigure OS settingsAlter and right size resources and networking for a viable warm standbyRestore back to physical servers

  • PowerConvert

    PowerSolution - Recovery

    Data Center

    Inventory

    Plan

    Configure

    INFO

    INFO

    INFO

    INFO

    INFO

    INFO

    PowerRecon

  • PowerSolution - Recovery

    Data Center

    Inventory

    Plan

    Configure

    PowerRecon

    PowerConvert

  • PowerSolution - Recovery

    Data Center

    Inventory

    Plan

    Configure

    PowerRecon

    PowerConvert

  • PowerSolution - Recovery

    Data Center

    PowerRecon

    PowerConvert

    Backup

    Replicate

    Failover

    Restore

    Test

  • PowerSolution - Recovery

    Data Center

    PowerRecon

    PowerConvert

    Backup

    Replicate

    Failover

    Restore

    Test

  • PowerSolution - Recovery

    Data Center

    PowerRecon

    PowerConvert

    Backup

    Replicate

    Failover

    Restore

    Test

  • Demo Overview

    Configure Replication Job

    Run Replication Job

    Test Recovery

    Run FullRecover Job

    DiscoveryServers

  • Configuring a Job

  • Managing Synchronization Schedules

    Central management interfaceAudit historyManage contract and jobs

    PauseForceEditDelete

  • The Final Word

    The more workload that can be made available for the right price, the more resilient your datacenter can be

    Planning and testing are essential

    Simple planning and simple testing are the key to success

    Come see a live demo at the PlateSpin Booth #635

    Virtual Infrastructure Visibility and Planning OS Portability

  • Presentation Download

    Please remember to complete yoursession evaluation form

    and return it to the room monitorsas you exit the session

    The presentation for this session can be downloaded at http://www.vmware.com/vmtn/vmworld/sessions/

    Enter the following to download (case-sensitive):

    Username: cbv_repPassword: cbvfor9v9r

  • Using Virtual Infrastructure as a Recovery Platform for Physical Production Servers About PlateSpinOverviewSolution OptionsBenefits of Backing up to a VMPlateSpin’s OS Portability TechnologyThe Availability Life CycleBridging the Physical to Virtual DividePowerSolution - RecoveryPowerSolution - RecoveryPowerSolution - RecoveryPowerSolution - RecoveryPowerSolution - RecoveryPowerSolution - RecoveryDemo OverviewConfiguring a JobManaging Synchronization SchedulesThe Final WordPresentation Download