Page 1: Using Acoustic Emission Leak  Detection

Improving Performance For Over 30 Years

Page 2: Using Acoustic Emission Leak  Detection

Plant Improvement

Coal Creek 1 ~150 Btu /KwHr

Council Bluffs ~90 Btu /KwHr

Coronado Generating 9.9 MW

North Anna 7.0 MW

Comanche Peak 1 & 2 4.4 MW

CONFIDENTIAL2

Page 3: Using Acoustic Emission Leak  Detection

Increased plant efficiency

Optimize PM Repair Scheduling

Lower valve maintenance cost

Confirm effectiveness of repairs

CONFIDENTIAL 3

Page 4: Using Acoustic Emission Leak  Detection

P&ID Review, Custom Database Creation

Custom Troubleshooting Plans

Loss Potential Analysis & Report

On-Site Testing & Preliminary Report

Conclusion Review by Senior Staff

Final Report –

Pre- Outage - Repair Recommendation & Loss Analysis

Post-Outage - Confirmation of Repair & Loss Recovery Analysis

CONFIDENTIAL 4

Page 5: Using Acoustic Emission Leak  Detection

Main Steam

Gland Seal Steam

Hot & Cold Reheat

Turbine Drains

Extraction Steam

Feedwater

Condensate

Heater Drains

Boiler Vents and Drains

Aux Steam

CONFIDENTIAL 5

Page 6: Using Acoustic Emission Leak  Detection

Normally CLOSED valves and Traps

Delta-P across valve

On the Piping

On the valve body

CONFIDENTIAL 6

Page 7: Using Acoustic Emission Leak  Detection

Operations Approved

Manipulation Steps

No Flow Interruptions

Return to Normal

CONFIDENTIAL 7

Page 8: Using Acoustic Emission Leak  Detection

Signature Comparison Method

Differential Signature Method

Time-Sweep Signatures

CONFIDENTIAL 8

Page 9: Using Acoustic Emission Leak  Detection

CONFIDENTIAL 9

Two Signatures Taken

(with & without pressure)

The Signature Comparison Method

Page 10: Using Acoustic Emission Leak  Detection

CONFIDENTIAL 10

Multiple Signatures Taken

Upstream, downstream, and on the valve.

The Differential Signature Method

Page 11: Using Acoustic Emission Leak  Detection

CONFIDENTIAL 11

2-Minute Signature Taken Records and displays

the opening and closing of the trap.

May Indicate the Trap is: Open or Oversized

Open Too Often

Open Too Long

Stuck Shut

Trap Block Valves Leaking

The Time Sweep Method

Page 12: Using Acoustic Emission Leak  Detection

LargeEaten through the hard metal & is damaging the soft metal

MediumDamaging the hard metal, but not the soft metal.

SmallMay show no internal damage.

Long term history shows they don’t grow

CONFIDENTIAL 12

Page 13: Using Acoustic Emission Leak  Detection

Loss Potential Analysis

Completed Prior to On-Site Testing

Used to evaluate test population

Identifies Priority of Testing

Loss Analysis

Completed by Senior staff upon receipt of test results

Utilizes survey data & conclusions

Evaluates and Ranks Leak Results & Prioritizes RepairsBased on economic impact

CONFIDENTIAL 13

Page 14: Using Acoustic Emission Leak  Detection

CONFIDENTIAL 14

Page 15: Using Acoustic Emission Leak  Detection

List of Leakers

Output Recovery

List of Tight Valves

Repair Recommendations

CONFIDENTIAL 15

Twelve (12)

High-Value Targets: $4,197,212

Twenty Two (22)Medium-Value Targets:

$5,171,795

Ten (10)

Low-Value Targets: $5,208,054

0

10

20

30

40

50

$0.00 M

$1.00 M

$2.00 M

$3.00 M

$4.00 M

$5.00 M

$6.00 M

0 10 20 30 40 50 Po

ten

tia

l L

os

s R

ec

ov

ery

(B

tu/K

W-H

r)

Po

ten

tia

l C

um

ula

tiv

e

Lo

ss

R

ec

ov

ery

($

)

Valves, In Order of Leakage to be Recovered

Sample Fossil Unit 1 Cycle Isolation Recovery Potential October 2008

Nominal Rated Output 1,400 MW Capacity Factor 80% Annual

Nominal Heat Rate 9,750 Btu/kW-Hr Outage Interval 36 Months

Fuel Cost $3.68 per MM Btu Cycle Isolation Loss 49 Btu/kW-Hr

Page 16: Using Acoustic Emission Leak  Detection

Provide P&ID’s and Heat Balance

Operating Parameters

Outage Cycle (Months)

MW Rating & Capacity Factor

Fuel Replacement Cost

Insulation Inspection Holes

Operations Support

CONFIDENTIAL 16

Page 17: Using Acoustic Emission Leak  Detection

All-Inclusive

Fixed Price

No Hidden Fees

Clearly Defined Deliverables

Objective evaluation of leaks

CONFIDENTIAL 17

Page 18: Using Acoustic Emission Leak  Detection

CONFIDENTIAL18

Page 19: Using Acoustic Emission Leak  Detection

Leak Detection Services, Inc.

Comprehensive Testing & Analysis

of Critical Valves & Traps