Using a Pilot Plant to Perform Treatment Optimization Studies April Nabors, MSEM Engineer Birmingham Water Works Board Birmingham, AL
22

Using a Pilot Plant to Perform Treatment Optimization Studies

Dec 21, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Using a Pilot Plant to Perform Treatment Optimization Studies

Using a Pilot

Plant to Perform

Treatment

Optimization

StudiesApril Nabors, MSEM

Engineer

Birmingham Water Works Board

Birmingham, AL

Page 2: Using a Pilot Plant to Perform Treatment Optimization Studies

Outline

BWWB background

EPA regulations

Pilot Plant description

List of research

Benefits of a Pilot Plant

Page 3: Using a Pilot Plant to Perform Treatment Optimization Studies

Learning Objectives

Give a brief description

of our treatment

process and watershed.

Discuss possible uses for

a Mobile Pilot Plant.

Evaluate the

effectiveness of using a

mobile Pilot Plant.

Introduce the basic

process for optimization

testing.

Page 4: Using a Pilot Plant to Perform Treatment Optimization Studies

BWWB Service Area Approximately 600,000

people served

Four drinking water treatment plants with a combined max rate of approximately 190MGD.

Shades Mountain Filter Plant

Western Filter Plant

H.Y. Carson Filter Plant

Putnam Filter Plant

Page 5: Using a Pilot Plant to Perform Treatment Optimization Studies

Shades Mountain

Filter PlantOldest and Largest Plant just

east of downtown

Max rate = 80 MGD

Receives raw water from the

Cahaba River and Lake Purdy

Page 6: Using a Pilot Plant to Perform Treatment Optimization Studies

Western Filter

PlantLocated on the west side of

Birmingham

Max rate = 60 MGD

Receives raw water from

Mulberry and Sipsey River

Page 7: Using a Pilot Plant to Perform Treatment Optimization Studies

Putnam Filter

PlantLocated in downtown

Birmingham

Max rate = 26 MGD

Receives raw water from

Mulberry River

Page 8: Using a Pilot Plant to Perform Treatment Optimization Studies

Carson Filter PlantBuilt in 1972 and located north

of town

Max rate = 26 MGD

Receives raw water from Inland

Lake

Page 9: Using a Pilot Plant to Perform Treatment Optimization Studies

Drinking Water Regulations

Stage 2 Disinfectants/DisinfectionByproducts Rule further tightenedregulations on DBPs, specifically totaltrihalomethane (TTHM) andhaloacetic acid (HAA) compoundsfound in finished drinking water.

Page 10: Using a Pilot Plant to Perform Treatment Optimization Studies

Introduction to the Pilot Plant

Mobile

Two identical

treatment trains

Max rate of 14,000

gpd (10 gpm)

SCADA

Full lab for analysis

Page 11: Using a Pilot Plant to Perform Treatment Optimization Studies

Pilot palnt

Page 12: Using a Pilot Plant to Perform Treatment Optimization Studies

Pilot Plant

Front to back Filters

Page 13: Using a Pilot Plant to Perform Treatment Optimization Studies

Right: Pump head for

chemical feed

Bottom: Chemical batch

tanks and mixers

Page 14: Using a Pilot Plant to Perform Treatment Optimization Studies

Left:

Flocculation

basins

Right: Laminar plates

Page 15: Using a Pilot Plant to Perform Treatment Optimization Studies

Right: Continuous sludge

removal pumps

Left: Sludge removal

ports

Page 16: Using a Pilot Plant to Perform Treatment Optimization Studies

Pilot Plant Treatment trains

include: raw water tanks

rapid mix chambers

flocculation basins sedimentation basin

three dual media filters

finished water tank

The twin design enables researchers to test two separate treatment methods concurrently.

Page 17: Using a Pilot Plant to Perform Treatment Optimization Studies

Pilot Plant Laboratory The PP contains all

other online and bench-top equipment used for analysis found at the full scale plant.

turbidimeters

pH and temperature probes

streaming current monitors

particle counters

conductivity meters

TOC analyzers

spectrophotometers

Page 18: Using a Pilot Plant to Perform Treatment Optimization Studies

Testing Procedures Online equipment continuously records data and

daily grab samples are pulled for verification.

The raw water supplied to the PP is coming directly off the same line feeding the plant.

All chemicals that are fed full scale are fed at the same mg/L dose in the PP.

All filters in the PP are set up to match media depths, run times, and backwashes.

*** This intense matching process provides confidence in the results obtained through the pilot testing.

Page 19: Using a Pilot Plant to Perform Treatment Optimization Studies

“Plant Match”

Raw water supply

Detention time

Chemical feed

rates

Filter media, flow

rates and back

wash rates

Page 20: Using a Pilot Plant to Perform Treatment Optimization Studies

Optimization Studies Coagulant

Ferric sulfate

Alum sulfate

PACl

Polymer

Coagulant aid

Filter aid

Oxidant

Chlorine

Chlorine Dioxide

Potassium Permanganate

pH adjustment

Hydrated lime

Liquid lime

Caustic soda

Hydrochloric acid

G values

Filter media

Depths

GAC

Sand/Anthracite

Page 21: Using a Pilot Plant to Perform Treatment Optimization Studies

Benefits of a Pilot Plant? Saves you money!

Creates smooth transitions for changes in plant operations!

Enables you to meet current and future EPA regulations!

Minimizes risks!

Page 22: Using a Pilot Plant to Perform Treatment Optimization Studies

Thank you for

your attention!

April Nabors

Birmingham Water Works Board

Engineer

[email protected]