Page 1: Use of On-site Power Generators for Water and Sanitary Sewer Departments

Call us: +1-713-434-2300www.wpowerproducts.com

Use of On-site Power Generators for Water and Sanitary Sewer Departments

Page 2: Use of On-site Power Generators for Water and Sanitary Sewer Departments

www.wpowerproducts.com

» Water and Sewer departments are responsible for collecting sewage and wastewater from its customers and conveying it to wastewater treatment plant.

» Residents can suffer unsanitary water conditions if water and sewer gets knocked out. This is something which County Utility departments plan for - and most Water and Sewer Departments have standby generators the keeps the pumps operating and wastewater flowing.

Page 3: Use of On-site Power Generators for Water and Sanitary Sewer Departments

www.wpowerproducts.com

» Worldwide Power Products (WPP) recently provided 14 natural gas generators for an emergency, stand-by power project for water and sanitary sewer providers in Galveston County Municipal Utility Districts (MUDs) in Texas. 

Page 4: Use of On-site Power Generators for Water and Sanitary Sewer Departments

www.wpowerproducts.com

» The project was started to lessen the possibility that MUD residents would suffer through unsanitary water conditions such as the ones they had when water and sewer was knocked out during Hurricane Ike in 2008. Stonewall Constructors LLC contracted WPP to purchase and install the generators for $781,818.25.

Page 5: Use of On-site Power Generators for Water and Sanitary Sewer Departments

www.wpowerproducts.com

» The project will supply two generators in Bayview, three in Baycliff, six in San Leon, and three in Freddiesville. The generators are being custom manufactured to the specifications of Galveston County engineers.

» Fabrication is expected to take 12 weeks, and WPP will provide loaner generators should a MUD lose power in a storm during generator fabrication.

Page 6: Use of On-site Power Generators for Water and Sanitary Sewer Departments

At Worldwide Power Products, we specialize in power generation equipment including over 100 new and used engines and generator

sets for the industrial, marine, and petroleum industries.

Call us: +1-713-434-2300www.wpowerproducts.com