Use of NWP for Nowcasting: Status and Challenges Juanzhen Sun National Center for Atmospheric Research, USA Acknowledgements Participants of WMO Workshop on “NWP for Nowcasting”
23

Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Mar 31, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Use of NWP for Nowcasting : Status and Challenges

Juanzhen SunNational Center for Atmospheric Research, USA

AcknowledgementsParticipants of WMO Workshop on “NWP for Nowcasting”

Page 2: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Outline

• Why and how NWP is used for nowcasting

• High -resolution NWP with rapid updates

• Assimilation of radar observations

• Future challenges

Page 3: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

A good NWP forecast for Morakot Typhoon?

OBS WRF

Page 4: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Missed the large precipitation on land!

OBS WRF

Red: > 40 mm/h

Page 5: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Requirements of nowcasting

• Accurately forecasting the timing and location of convective system

• Accurate specification of the current weather conditionweather condition

• High spatial and temporal resolution• Rapidly updated (RU) analysis and

forecast• Timely production of analysis and

forecast• Frequent output

Page 6: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Using NWP for nowcasting

• Traditional extrapolation-based nowcasting has little skill beyond 1-2 hours

• New nowcasting techniques that aim at predicting storm growth and decay need CSIgrowth and decay need predictor fields from NWP

• Blending nowcasting and NWP has a potential to improve 3-6 hour forecasts

Figure from IsztarZawadzki

ModelsMaple

Blending

CSI

Page 7: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Blending Weights

NCAR CoSPA Blending AlgorithmExtrapolation Forecast

Blended Forecast (12-20 UTC)

ExtrapExtrap

Model

Dash : 15 to 00 UTC

Solid : 00 to 15 UTC

Calibration + Phase Corr

Model forecast by HRRR

Courtesy of

James Pinto

Page 8: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Black - Extrapolation

Blue - Blending

Red - model

Green – model adjusted

The success of blended forecast critically depends on NWP!

• The NWP skill is lower than extrapolation-based nowcasting in

Blending

Model adjusted

Courtesy of

James Pinto

based nowcasting in the first 4 hours

• NWP and its data assimilation need further improvement

Page 9: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

NWP toward nowcasting applications- Status summary

• NWP models are running at the convection-permitting resolution (<4km with explicit microphysics)

• Several centers have rapid update (RU) (1 -3 hours) • Several centers have rapid update (RU) (1 -3 hours) configurations for short-term prediction

• Radar observations are used in several RU systems

• 1-3 hour NWP output is common in the RU systems

• The typical forecast delay time is 1-2 hours

Page 10: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

High -resolution (<4km) RU (<3H) systems

System Organization RU cycle DA method Model

HRRR NOAA/GSD hourly 3DVar ARW-WRF

BJRUC NCAR/BMB 3-hourly 3DVar ARW-WRF

RTFDDA NCAR hourly Newtonian

nudging

ARW-WRF

nudging

LAPS NOAA/GSD hourly Successive

correction

ARW,MM5,or

RAMS

ADAS CAPS N/A 3DVar ARPS

AROME-

France

Meteo France 3-hourly 3DVar AROME

COSMO-DE DWD 3-hourly Newtonian

nudging

COSMO

UKV Met Office 3-hourly 3DVar Unified Model

Page 11: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Progress of radar data assimilation

• Warm-start algorithmsusing rain water or precipitation derived from refl ectivity

- Cloud analysis- Latent heat nudging- DDFI – diabatic digital filter initialization- Assimilate estimated in-cloud humidity or vertical

velocity

• Variational data assimilation• Variational data assimilationAssimilating both radial velocity and reflectivity

- 3D-Var (operational or semi-operational)- 4D-Var (semi-operational)

• Ensemble Kalman Filter (EnKF)Assimilating both radial velocity and reflectivity

- Relatively new to radar data assimilation - Mostly used for research

Page 12: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Radar DA impact: warm start

•DWD operational system with

COSMO model

• Assimilate LHN based on radar

estimated rainfall

Courtesy of ChristophSchraff

LHN

15 June – 15 July 2009

2 mm/h

Forecast hour

FSS

wit

h 3

0k

m R

OI

t = 6h

Forecast hour

Page 13: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

5 mm hourly precipitation

Radar DA impact: 3D -Vart = 3h t = 4h

OBS

•NCAR/BMB WRF 3D-Var

• Pre-operational testing

• Assimilate both radial wind and

reflectivity

Average score of convective cases during

summer 200923 July 2009

No Radar

RadarOPER (no radar)

With radar

Page 14: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Radar DA impact: ensemble 3D -Var

•ADAS (3D-Var) with ARPS model

• Results from 2008 NSSL/SPC spring

experiment

Courtesy of Ming Xue

May 26 2008

4km

w/o

radar

Page 15: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Radar DA impact: 4D -Var

3D-Var with

4D-Var

1mm/h

OBS

t = 1 h t = 3 h t = 6 h

• A case study using newly developed WRF 4D-Var

• Assimilate both radial velocity and reflectivity

3D-Var

3D-Var with

warm start

5mm/h

Forecast hour

FSS

wit

h 2

4 k

m R

OI

3D-Var

4D-Var

Page 16: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

How are we doing compared with extrapolation?

Result from NSSL/SPC spring experiment 2008

4km w/o radar

Figure from Ming Xue

Page 17: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Future challenges and opportunities

• Predictability limit of convection

Lorenz, 1969Atmos. Energy

Spectrum

Predictability Limit for

given scale

Error spectrum at

Thunderstorms (~10 km): ~ 1h

Convective Systems (~300 km): ~12 h

Subsynoptic waves (~1200 km): ~1.5 days

Scale (km)

Error spectrum at

given time

Page 18: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Future challenges and opportunities• Diurnal variation of radar DA impact

00Z

•Radar DA has longer

positive impact for late

evening initializations

• The positive impact

only lasted 4 hours for

morning initializations

Dashed lines:

With radar

Solid lines:

Cold start

6PM LT00Z

12Z

morning initializations

• The difference is

probably caused by the

scale and degree of

organization of the

convection

6PM LT

6AM LT

Page 19: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Future challenges and opportunities

• Need higher model resolutions

Page 20: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Future challenges and opportunities

• Advanced DA schemes

An ensemble 4D -Var system with 15-30 min rapid updates

- 4D-Var finds the dynamically consistent trajectory th at best fits to observations

- An ensemble, based on the 4D -Var mean, estimates the error- An ensemble, based on the 4D -Var mean, estimates the errorcovariance of the forecasts

However…

Increased computational cost!

Page 21: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Future challenges and opportunities

• Sensitivity to model physics

Observation Single moment Double moments

3h forecasts after EnKF radar data assimilation

Courtesy of Ming Xue

Page 22: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

Future challenges and opportunities

• NWP does it all?

Not in the foreseeable future for the following rea sons

•It is difficult for NWP to surpass extrapolation in the first 1-2 hours

• It takes time (1-2 hours) for NWP to produce forecasts • It takes time (1-2 hours) for NWP to produce forecasts

The goal is to move the cross-over time of the skil l Between nowcastingand NWP to Less than 2 hours!

Page 23: Use of NWP for Nowcasting: Status and Challenges · 2013. 1. 10. · - Status summary • NWP models are running at the convection-permitting resolution (

1.0

5-10 years from now

Nowcasting

Skill

0 1 2 3 4 5 6

0.010 years ago

Currently

Forecast hour