US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty 1. TBM/ITER General Arrangement 2. Equatorial Test port Configuration 3. Test Port Assembly 4. Ancillary Systems Layout 1. Port Cell Area 2. TCWS Area
22

US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

Jan 22, 2016

Download

Documents

denis

US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty. TBM/ITER General Arrangement Equatorial Test port Configuration Test Port Assembly Ancillary Systems Layout Port Cell Area TCWS Area. Pipe Shaft Area. Port Cell Area. Bio-shield. Cryostat. Test Port Assy. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

US ITER TBM MeetingIdaho Fall, Idaho, Aug 10-12-2005

M DagherP Fogarty

1. TBM/ITER General Arrangement2. Equatorial Test port Configuration3. Test Port Assembly4. Ancillary Systems Layout

1. Port Cell Area2. TCWS Area

Page 2: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty
Page 3: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

Port Cell Area

Pipe Shaft Area

Bio-shield

Cryostat

Test Port Assy

Page 4: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

Pipe Shaft Area

Tokamak Building, East-West Section View

TCWS AreaTBM Cooling system

Equipment Room

Bio-Shield

Port Cell Area

Cryostat

Page 5: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

TCWS AreaTBM Cooling system

Equipment Room

Bio-Shield

EquatorialPort Cell Area

Shielding Blanket

Equatorial Port Assembly

Page 6: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

Test Port General Layout

Equatorial Level Section

Vacuum Vessel

Test Blanket Module

Cryostat Bio-Shield

Pipe Shaft Area

Port Cell AreaEquatorial Level

0.0

Transporter

Frame Assembly

VV Port Extension

VV Closure Plate

Page 7: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

Test Port Configuration

VV Port Extension

VV – Cryostat Duct

Cryostat Bio-Shield

TBM Frame Assy

VV Closure Plate

Pb-Li Concentric Pipe

Transporter

Port Cell Area

Page 8: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty
Page 9: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

3.6m

Test Port Configuration

4.8m

TBM

TBM Frame Assy

Transporter

VV Port Extension

VV Closure Plate

Bio-Shield

Page 10: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

TBM Frame Assembly

Page 11: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty
Page 12: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty
Page 13: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

ITER

Overall view of Frame Cooling channels at the front of Frame

Page 14: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

Design of “removable back-side shield” structure has been developed to accommodate possible different TBM attachments (support structures,

electrical connection, cooling pipes and instrumentation).

ITER

Fastening the bolts

Lip seal

(B) Removable back-side shield

Page 15: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

25

25 mm gap all around inside frame openings25

25

1710

504

5

413

Page 16: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

15Divider

413ModuleDepth

28 First Wall

95Inner Back

Plate

4(typ wall)

20(channel)

7(channel)

120PbLiOUT

80PbLi - IN

504 Module Width

Helium IN PlenumFirst Wall

(Upper Channel)

Helium IN PlenumFirst Wall

(Lower Channel)

139.3(typ 3 places)

Helium OUT Plenums(Top & Bottom Plates,Grid Plates & Dividers)

15 Grid Plate

7 (channel)

75Outer Back

Plate

Helium OUTFirst Wall

Helium IN

Helium IN

AllHelium

OUT5(typ wall)

Back Plates

65

85

Helium flow channelsfor actively cooling

The back plates

Dimensions in millimeters

Plan ViewBlanket Module

68mm I.D. Pipe Inlet

68 mm I.D.Pipe Inlet

Page 17: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

Ancillary Systems

• Port Cell Area– Primary Coolant Loop Pb-Li – He – Tritium Extraction System

• TCWS Area– Primary FW He Coolant Loop – Secondary Coolant Systems

Page 18: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

Pb-Li Primary Coolant Loop

Transporter, Port Cell Area

Secondary He Coolant Loop

TCWS

Test Port

Primary He Coolant Loop

TCWS

Page 19: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

Pb-Li Primary Coolant Loop Schematic

Page 20: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

Pb-Li Primary Coolant Loop

Pb-Li Concentric Pipe

Pb-Li Dump Tank

Pb-Li Mixing Tank

Pb-Li – He Heat Exchanger

Tritium Extraction System

Pb-Li Pump

Expansion Tank

Page 21: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty
Page 22: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty

He Secondary Coolant Loops

He Circulator

Heater Element

He-H2O Heat Exchanger

Pressure Control Sub-System