Top Banner
U.S. Department of Transportation Federal Transit Administration GAMPO: FTA Update July 29, 2011 Robert Buckley, Community Planner Parris Orr, Community Planner
11

U.S. Department of Transportation Federal Transit Administration GAMPO: FTA Update July 29, 2011 Robert Buckley, Community Planner Parris Orr, Community.

Dec 18, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: U.S. Department of Transportation Federal Transit Administration GAMPO: FTA Update July 29, 2011 Robert Buckley, Community Planner Parris Orr, Community.

U.S. Department of TransportationFederal Transit Administration

GAMPO: FTA Update July 29, 2011

Robert Buckley, Community PlannerParris Orr, Community Planner

Page 2: U.S. Department of Transportation Federal Transit Administration GAMPO: FTA Update July 29, 2011 Robert Buckley, Community Planner Parris Orr, Community.

2

Overview

• FTA Updates Organizational Update Discretionary Programs Sustainability & Livability Upcoming Events/Training Questions?

Page 3: U.S. Department of Transportation Federal Transit Administration GAMPO: FTA Update July 29, 2011 Robert Buckley, Community Planner Parris Orr, Community.

3

Organizational Update

 Atlanta Augusta, Columbus,

Savannah GDOT, Rural, Small UZAs

PlanningKeith Melton Parris Orr Robert Buckley

[email protected] [email protected] [email protected] 404-865-5617 404-865-5618

EngineeringMaggie Sandberg Christopher White Robert Buckley

[email protected] [email protected] [email protected] 404-865-5619 404-865-5618

GrantsTajsha LaShore Darreyl Davis Robert Buckley

[email protected] [email protected] [email protected] 404-865-5631 404-865-5618

ARRADudley Whyte (temp)

[email protected] 

• Director of Planning and Program Development currently vacant: Jamie Pfister took a position at FTA HQ.

• Georgia Organizational Chart:

Page 4: U.S. Department of Transportation Federal Transit Administration GAMPO: FTA Update July 29, 2011 Robert Buckley, Community Planner Parris Orr, Community.

Discretionary Programs

• Currently, approximately $1.1B in available discretionary funding.

• These programs are funded through unallocated discretionary funding and targeted at FTA’s priorities

• Quick turnaround for these competitive programs: – July 29, 2011: First due date for SOGR, Bus

Livability and AA

Page 5: U.S. Department of Transportation Federal Transit Administration GAMPO: FTA Update July 29, 2011 Robert Buckley, Community Planner Parris Orr, Community.

Discretionary Programs

Discretionary Program

Available Amount

(in millions)

NOFA Publication

DateDue Date Expected

Announcement

State of Good Repair $750 6/24/2011 7/29/2011 9/30/2011

Bus and Bus Facilities Livability* $150 6/27/2011 7/29/2011 9/30/2011

Alternatives Analysis* $25 6/27/2011 7/29/2011 9/30/2011

TIGGER** $49.9 6/24/2011 8/23/2011 10/25/2011

Clean Fuels** $51.5 6/24/2011 8/23/2011 10/25/2011

Veteran's Initiative $30 7/27/2011 9/16/2011 November 2011

Tribal Transit $15.075 7/25/2011 9/26/2011 Not scheduled

Over-the-Road-Bus $8.8 7/13/2011 9/12/2011 Not scheduled

TIGER 7/1/2011 (interim)

Pre:  10/3/2011Post:  10/31/2011 Not Scheduled

Page 6: U.S. Department of Transportation Federal Transit Administration GAMPO: FTA Update July 29, 2011 Robert Buckley, Community Planner Parris Orr, Community.

Discretionary ProgramsLessons Learned:• Ensure project is “ready to go” – programmed in

TIP/STIP/UPWP or letter documenting rapid inclusion should project be selected.

• Ensure project has regional support – Attach letters of support from MPO, State, etc.– Attachments do not count toward page limits

• Notify and work with FTA region when applying• Follow outline provided in the FR• Specifically answer each evaluation criterion• Ensure application is complete• Submit to Grants.gov EARLY• Take advantage of FTA feedback/debriefs

– Coordinated through the Regional Office

Page 7: U.S. Department of Transportation Federal Transit Administration GAMPO: FTA Update July 29, 2011 Robert Buckley, Community Planner Parris Orr, Community.

Six Partnership Principles

Page 8: U.S. Department of Transportation Federal Transit Administration GAMPO: FTA Update July 29, 2011 Robert Buckley, Community Planner Parris Orr, Community.

Federal Partnership for Sustainable Communities: Near Term Priorities

Page 9: U.S. Department of Transportation Federal Transit Administration GAMPO: FTA Update July 29, 2011 Robert Buckley, Community Planner Parris Orr, Community.

9

• August 10-12: 2011 State Programs and Partnerships Meeting, Washington, DC

• August 10-12: NTI, Connecting Communities: Public Transportation Emergency Preparedness Workshop, Orlando, FL

• August 16-18: New Starts Engineering Workshop, San Francisco, CA

• October 18-20: NTI Management of Transit Construction Projects, Orlando, FL

• October 24-26: NTI Management of Transit Construction Projects, Charlotte, NC

Upcoming Events/Training

Page 10: U.S. Department of Transportation Federal Transit Administration GAMPO: FTA Update July 29, 2011 Robert Buckley, Community Planner Parris Orr, Community.

FTA Contact Information

10

Atlanta Augusta, Columbus, Savannah

GDOT, Rural, Small UZAs

Keith Melton Parris Orr Robert BuckleyCommunity Planner Community Planner Community Planner

[email protected] [email protected] [email protected] 404-865-5617 404-865-5618

Page 11: U.S. Department of Transportation Federal Transit Administration GAMPO: FTA Update July 29, 2011 Robert Buckley, Community Planner Parris Orr, Community.

Questions?