Presentation 4 U.S. ARMY CORPS OF ENGINEERS MR. JOHN L. ADAMS, P.E., PMP
May 23, 2018
Presentation 4
U.S. ARMY CORPS OF ENGINEERS
MR. JOHN L. ADAMS, P.E., PMP
ODU CEEVC“What Does the Future Hold”29 November 2012
Norfolk DistrictNorfolk DistrictProgram Review
JOHN ADAMS, P.E., PMPDeputy District Engineer for Programs and Project [email protected]@usace.army.mil
US Army Corps of EngineersBUILDING STRONG®
USACE MissionProvide vital public engineering services in peace and war to strengthen our Nation's security, energize the economy and reduce risks from disasters.
USACE Strategic Vision“Building Strong”g g
A great engineering force of highly disciplined people working with our partners through disciplined thought and action to deliver innovative and sustainable solutions to the Nation’s engineering challenges.
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
engineering challenges.
USACE PRIORITIES
• OCO Support.
• Energy security and sustainability goals• Energy security and sustainability goals.
• Streamline USACE business and governance processes.
T f Ci il W k t d li th b t ibl• Transform Civil Works to deliver the best possibleproducts and services to the Nation.
• Enhance our interagency disaster response and recovery• Enhance our interagency disaster response and recoverycapability.
• Partner with the Installation Management Command at allPartner with the Installation Management Command at allechelons to deliver and maintain enduring installations and contingency basing.
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
www.nao.usace.army.mily
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Military ProgramsFY08-16FY08-16
Fort Belvoir Fort Belvoir
$1.053B
$152M
Fort AP HillProject OfficeFort AP HillProject Office
Hospital OfficeHospital Office
Ft MonroeFt Monroe$410M
$76M$23M
DSCRProject OfficeDSCRProject Office Ft Eustis
Resident OfficeFt EustisResident Office
LangleyBase Resident OfficeLangleyBase Resident Office
Project OfficeProject Office$119M
$65M
RichmondRichmondNGICProject OfficeNGICProject Office
Ft StoryFt Story
NorfolkNorfolkFt LeeResident OfficeFt LeeResident Office
Ft PickettProject OfficeFt PickettProject Office
RadfordProject OfficeRadfordProject Office
NAVFACNAVFAC
$56M$
$8M $20M
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
$$1.65B
$ $
Small Business Prime Awards FY12
NAO GOAL STAT GOAL NAO
S a us ess e a ds
NAO GOAL STAT GOAL NAO
Executed to Date $322M %
SB 32% 23% $97M 30.3
SDB 20% 5% $39M 12.1
WO 6% 5% $12M 3.6
HUBZONE 10% 3% $9M 2.7
SDV 6% 3% $20M 6.3
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Small Business Target Awards FY13
NAO GOAL STAT GOAL NAO
S a us ess a get a ds 3
NAO GOAL STAT GOAL NAO
Projected $367M
SB 33% 23% $121M
SDB 12% 5% $44M
WO 5% 5% $18M
HUBZONE 3% 3% $12M
SDV 7% 3% $25M
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Military Programs FY13 Contract Forecast Name Location Program
AmountAcquisMethod
ProjectedAward Date
Repair Quantico Dams Quantico, VA $5-10M Unrestricted 1st Qtr FY13
MEPS Furniture Charlotte, NC $500K-$1M SB 1st Qtr FY13
MEPS Furniture Chicago $500K-$1M SB 1st Qtr FY13
Roadway Repair/Paving DSCR $3-$5M SB 2nd Qtr FY13
Renovate Building 24 DSCR $2M-$3M HZ 1st Qtr FY13
Renovate Building 56 DSCR $900K-$1M SB 1st Qtr FY13
Renovate Building 42 DSCR $3M-$4M 8(A) 1st Qtr FY13
Renovate Building 70 DSCR $500K-$700K 8(A) 1st Qtr FY13
Renovate Parking Lot DSCR $500K-$600K SB 1st Qtr FY13
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Repair WH 9 and 12 Roofs DSCR $3-$5M SB 4th Qtr FY13
Military Programs FY13 Contract Forecast Name Location Program Acquis ProjectedName Location Program
AmountAcquisMethod
ProjectedAward Date
Renovate Bldg 663 Fort Eustis $5-10M SB 2nd Qtr FY13
Renovate Bldg 664 Fort Eustis $5-10M SB 2nd Qtr FY13Renovate Bldg 664 Fort Eustis $5-10M SB 2 Qtr FY13
Repair Barracks 3004 Fort Lee $10-15M SB 2nd Qtr FY13
MEPS Furniture Houston $500K-1M SB 1st Qtr FY13$
MEPS Furniture Salt Lake City $500K-1M SB 1st Qtr FY13
DODEA SRM Various CONUS $10M SB/SDV/WO FY13
AIT Barracks Phase II (Barracks and Site)
Fort Lee $50-60M NER UNR MATOC (SWF)
2nd Qtr FY13
AIT Phase II BTN and BDE HQs Fort Lee $5 10M NER SB 3rd Qtr FY13AIT Phase II BTN and BDE HQs Fort Lee $5-10M NER SBMATOC (SWF)
3rd Qtr FY13
Remote Delivery Facility Rivanna Station $5-10M SB 4th Qtr FY13
AIT Phase II USMC HQ Fort Lee $1-5M NER SB 2nd Qtr FY13
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
AIT Phase II USMC HQ Fort Lee $1 5M NER SBMATOC (SWF)
2 Qtr FY13
Misc Renovations at Fort Pickett Fort Pickett $2-5M SB 2nd Qtr FY13
FY14 + Military Programs Forecast Name Location Program Acquis ProjectedName Location Program
AmountAcquisMethod
ProjectedAward Date
AIT Complex, Ph 3 Fort Eustis $25-50M 2014
Operations Center Phase 1 DSCR $50-80M 2014
4-Bay Munitions Inspection Station Langley $1-5M 2014
AIT Barracks Complex, Ph 3 Fort Lee $75-100M 2015
Relocate Govt Fuel Station Langley $1-$2M 2015
New East Gate DSCR $1-5M 2015
Replace Fuel Pier Langley $5-10M 2015
Readiness Center (JFHQ) Sandston $15-25M 2015
TASS Training Center (MCAR) Fort Lee $10-20M 2015
Modified Record Fire Fort Eustis $1-5M 2016
Fort Pickett (TBAS) - Training Support Center Fort Pickett (TBAS) $1-5M 2017
Multipurpose Machine Gun Range Fort A P Hill $5-10M 2017Multipurpose Machine Gun Range Fort A P Hill $5 10M 2017
Modified Record Fire Fort A P Hill $1-5M 2017
Operations Center Phase 2 DSCR $25-50M 2017
FOB/SOUC Ft Pickett $15-30M 2017
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Operations Center Phase 3 DSCR $60-80M 2019
Department of Defense Education Activity(DoDEA)( o )
• 194 schools worldwide, replacing or renovating over 130 in the next 7 yearsnext 7 years
• Multiple cultures and diversity in construction practices require DoDEA to be flexible and adapt to best practices in multipleDoDEA to be flexible and adapt to best practices in multiplelocations
Collaborative effort to incorporate concepts for innovation in• Collaborative effort to incorporate concepts for innovation ineducation curriculum and facilities, the use of future technology, and the growing expectations for sustainability
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
DoDEA Design and Construction Program
• Architect-Engineering Firms
• DoDEA Design Center is currently evaluating SF330s submitted in response to the following solicitations. Anticipate a selection 2nd
Quarter.• 1 UNRESTRICTED – support DoDEA Wide• 1 SMALL BUSINESS – support DDESS Only
D DEA C t ti P• DoDEA Construction Program• The Geographic Districts are responsible for the Acquisition Strategy,
solicitation, award and overall Construction Management. This will not changenot change.
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
FY13 Civil Works Contract Forecast Name Location Est Contract Acquis
MethodProjected
Award Date
AIWW ACC and DSC AIWW FACILITY OPERATIONS AND MAINTENANCE
$2.5M Large DEC12
JAMES RIVERIDIQ CONTRACT,VARIOUS SHOALS
N/A SB JUN13
JAMES RIVERTRIBELL SHOAL $ 1M SB JUN13
JAMES RIVERDANCING POINT $1.5M SB JUN13DANCING POINT $1.5M SB JUN13
NORFOLK HARBOR CHANNEL TO NEWPORT NEWS AND 50' ANCHORAGE
$2M Large APR13
NORFOLK HARBORCRANEY ISLAND REACH $2M L APR13CRANEY ISLAND REACH $2M Large APR13
NORFOLK HARBOR THIMBLE SHOAL CHANNEL
$2M Large JUL13
Waterway on Coast of Va
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Waterway on Coast of VaWACHAPREAGUE $1M Large FEB13
FY13 Civil Works Contract Forecast (cont.)
Name Location Est Contract Acquis Projected Method Award
DateTYLERS BEACH DREDGING ISLE OF WIGHT
COUNTY
$650KSB
AUG13
NORFOLK HARBOR CRANEY ISLAND REHANDLING BASIN
$4M Large MAR13
SKIFFES CREEK JOINT BASE EUSTIS/LANGLEY
$2.5M SB JUL13
Atlantic Woods Dredging (EPA Superfund)
NORFOLK, VA $15-30M Large SEP13
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
FY13 ENV & IIS Contract Forecast Name Location Anticipated Acquis ProjectedName Location Anticipated
AmountAcquisMethod
ProjectedAward Date
Environmental : Environmental Support For Others (ESFO) Environmental Quality (EQ) etc
Various Locations
$5.5M ExistingIDIQs
FY13VariousOthers (ESFO) , Environmental Quality (EQ), etc. Locations IDIQs Various
NASA Langley Research Center, various renovation / repair projects
Hampton, VA $1.3M Existing HZ MATOC
4th Qtr FY12
Arlington National Cemetery SRM Construction MATOC
Arlington, VA $35M, 5yrs SDVSB 2nd Qtr FY13SRM Construction MATOC
Arlington National Cemetery Repair Eternal Flame
Arlington, VA $500K 8(A) 2nd Qtr FY13
Arlington National Cemetery Marker Removal
Arlington, VA $400K-$600K 8(A) 1st Qtr FY13Marker Removal
Arlington National Cemetery Repair Boundary Wall
Arlington, VA $600K MATOC 1st Qtr FY13
Arlington National Cemetery Replace Fuel Station Arlington, VA $750K MATOC 4th Qtr FY13
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
FY13 + ENV & IIS Contract Forecast Name Location Anticipated Acquis ProjectedName Location Anticipated
AmountAcquisMethod
ProjectedAward Date
Arlington National CemeteryMillennium Project
Arlington, VA $76M TBD 4th Qtr FY13j
NOAA Wallops Command & Data Acquisition Station (WCDAS) Facility Master Plan
AccomackCounty, VA
$400k TBD 3rd Qtr FY13
NOAA MOC-A DREDGING NORFOLK, VA $1M Large 4th Qtr FY13
Environmental : Environmental Support For Various $7M Existing FY13Environmental : Environmental Support ForOthers (ESFO) , Environmental Quality (EQ), etc.
VariousLocations
$7M ExistingIDIQs
FY13Various
NASA Langley Research Center, various renovation / repair projects
Hampton, VA $1.6M HZ 1st Qtr FY13
Arlington National Cemetery Arlington, VA $2M MATOC 4th Qtr FY13Arlington National CemeteryVisitor Center Improvements
Arlington, VA $2M MATOC 4 Qtr FY13
Arlington National Cemetery Parking Garage Repairs
Arlington, VA $2M (phase 1) MATOC 3rd Qtr FY13
Arlington National Cemetery Arlington, VA $1M MATOC 4th Qtr FY13Rebuild Roosevelt Road
Arlington National Cemetery Utility Removals from Old Easement Area
Arlington, VA $2M MATOC 3rd Qtr FY13
Arlington National Cemetery Navy Annex Expansion
Arlington, VA $246M,($82M/3yrs)
TBD FY15
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Navy Annex Expansion ($82M/3yrs)
Norfolk District AE OverviewCurrently Have Many Smaller 3 5 Year $3m• Currently Have Many Smaller 3-5 Year - $3mto $12m IDCs with capacity through FY13
• Issued one AE IDIQ Solicitation in support of• Issued one AE IDIQ Solicitation in support ofNAO projects – closed – evaluation ongoing
• Issued two AE IDIQ Solicitations for DoDEA• Issued two AE IDIQ Solicitations for DoDEAMILCON Support – closed – evaluation ongoingg g
• Expect additional DoDEA SRM Small Business AE IDIQ 2nd Quarter FY13
• Expect additional DoDEA MILCON AE IDIQs late 2nd Quarter FY13
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Defining Success in Selection
Key Point SF-330 or PROPOSAL CONSIDERATION
Organization • Arrange and Include Specialized Experience Following Announcement Listing
• Arrange Resume’s in a Logical Manner, Either by Disciplineg g , y por by Consultant
• Address Selection Criteria Clearly and Obviously
R l Cl l D t t Y T ’ Si il E iRelevancy • Clearly Demonstrate Your Team’s Similar Experience
• Discuss How Your Team’s Experience is Exceptionally Relevant to the Solicitation Tasks
• Keep a Focus on Quality, Cost, Schedule on Experience Discussions
Presentation • Professional, Complete, Easy to Read and Follow.
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
, p , y
• Flashy not Required.
Defining Success in Selection
Key Point SF-330 or PROPOSAL CONSIDERATION
EstablishedRelationships
• Document Established Relationships With Team Members
• Define or Discuss Process or Practices in Place for Communication/ConsultationCommunication/Consultation
• If a New Team Member, Identify Them and Address How They Will be Integrated Into the Project Team
• A New Team Member Could be A Strength• A New Team Member Could be A Strength
Focus on QualityC t l
• Address Design/Engineering and/or Construction Quality Control
Control • Define/Discuss Existing Practices or Practices/Processes Anticipated to Used in This Contract
• Define Some Measures of Quality, and Discuss It’s
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Implications on Performance
• Include Information from Past Clients
Defining Success in Selection
K P i t SF 330 PROPOSAL CONSIDERATIONKey Point SF-330 or PROPOSAL CONSIDERATION
On-TimeOn-Budget
• Include Information on Past Performance Concerning Award Cost vs. Final Cost – Discuss Results
Performance • Include Information on Project Completion – Meeting Commitments
• Include Methods and Considerations for Managing Scope and Contract Modifications
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
FBO Advertisements –http://www.nao.usace.army.milp y
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Centers of Standardization
• Norfolk District/NAD (7)– General Instructional Facility– Classroom 21
• Ft. Worth District/SWD (7)• Unaccompanied Enlisted Personnel
HousingB i T i i C l /O St ti U it– Enlisted personnel Dining Facility
– Mil. Entrance Processing Stations– Family Housing RFP– Information Systems Facility
• Basic Training Complex/One Station UnitTrainee
• Advanced individual Training Complex• Reception Barracks• Warriors In Transition (WIT)
– Criminal Investigation FacilityWarriors In Transition (WIT)
• General Purpose Warehouse• Central Issue Warehouse
• Savannah District/SAD (6)• Brigade Operations Complex• Tactical Equipment Maintenance • Company Operations Facility• Battalion HQ
B i d HQ• Brigade HQ• Command & Control Facility (C2F)
(Shared responsibility w/SAM)• Division HQ• Corps HQ
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Corps HQ
Centers of Standardization
• Huntsville Center (15)Ph i l Fit
• Louisville District/LRD (2)• Physical Fitness• Outdoor Sports Facility• Child Development (2)• Youth Activity Centers
Consolidated Fire Safet and
• Army Reserve Centers• Operational Readiness Training
Complex
• Consolidated Fire, Safety andSecurity Facility
• Fire Station• Army Community Service Center• Bowling Center RFP
• Honolulu District/POD (2)• Unaccompanied Officers
Quarters• Transient Officers Quarters
• Bowling Center RFP• Hazard Material Storage• Close Combat Tactical Trainer • Mil. Ops. Urban Terrain Facility• Training Ranges• Training Ranges• Battle Cmd Training Ctr.• Training Support Ctr.• Medical Facilities
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Norfolk District Points of Contact
Jack Beecher, Chief, Office of Small Business Programs (757) 201-7077
G H Chi f P j t B hGreg Hegge, Chief, Projects Branch(757) 201-3142
Betty Grey Waring, Chief, Operations Branch(757) 201-7124(757) 201 7124
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Questions/Comments?
BUILDING STRONG®US Army Corps of Engineers – Norfolk District
U.S. Army Corps of Engineers Norfolk District (NAO) FY13 Forecast of Contracting Opportunities
U.S. Army Corps of Engineers Norfolk District (NAO) presents the following Forecast of Contracting Opportunities (FCO) for fiscal year 2013 for informational purposes. The FCO is a snapshot of our planned acquisitions and is for planning purposes. It does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by NAO to purchase the desired products and/or services. The requirements listed below may or may not be executed and are contingent upon funding, real estate, permits and other factors that affect the requirements. All acquisition strategies are subject to change based on market research and as the requirements are further definitized. Requirements over the simplified acquisition threshold listed as “SB” means that the requirement will be set aside for small businesses, but the specific socioeconomic category has not been determined at the time of publication and will be ultimately determined by market research. Small businesses are encouraged to respond to NAO Sources Sought Notices, a form of market research. The projected quarters (or dates) provided below are the estimated quarters (or dates) NAO anticipates advertising requirements within the Federal Business Opportunities System (FedBizOpps) at: www.fbo.gov (for all open market procurements greater than $25K). Use DoDAAC “W91236” (a six-position code that uniquely identifies a DOD activity or organization) to locate NAO requirements within FedBizOpps.
As of 14 Nov 2012
U.S. Army Corps of Engineers Norfolk District (NAO)FY13 Forecast of Contracting Opportunities
Project Description Program Location Estimated Cost
Status Method Acq Strategy
FY QTR Small Business
NOTES
ANC - 6" Water Line IIS Arlington National Cemetary $0-$1M In negotiations for award MATOC DBB 2013 2 X NEW SDV MATOC FOR ANC
ANC - Headstone Removal IIS Arlington National Cemetary $0-$1M In Design Sole Source DBB 2013 1 X Patriot
ANC - Millennium Construction IIS Arlington National Cemetary $50-$80m In Design 2-Phase DBB 2013 4 Two-Phase BV or Two-Step
ANC - New MATOC IIS Arlington National Cemetary $35,000 Awaiting Seed Project NA NA 2013 2 X NEW SDV MATOC FOR ANC
ANC - Parking Garage Repairs IIS Arlington National Cemetary $1-$5M In Design MATOC DBB 2013 3 X NEW SDV MATOC FOR ANC
ANC - Repair Boundary Wall IIS Arlington National Cemetary $0-$1M Waiting for funds to re-advertise MATOC DBB 2013 2 X NEW SDV MATOC FOR ANC
ANC - Repair Eternal Flame IIS Arlington National Cemetary $0-$1M In Design IDC DBB 2013 2 X
ANC - Replace Fuel Station IIS Arlington National Cemetary $0-$1M Waiting for Design Funds MATOC DBB 2013 4 X NEW SDV MATOC FOR ANC
ANC - Roosevelt Road IIS Arlington National Cemetary $0-$1M Waiting for Design Funds MATOC DBB 2013 3 X NEW SDV MATOC FOR ANC
ANC - Utilities Removals IIS Arlington National Cemetary $1-$5M In Design MATOC DBB 2013 3 X NEW SDV MATOC FOR ANC
ANC - Visitors Center Basement Renovations IIS Arlington National Cemetary $0-$1M In Design MATOC DBB 2013 4 X NEW SDV MATOC FOR ANC
Atlantic Woods Dredging IIS Norfolk $5-10M In Design (by EPA) TBD DBB 2013 1
CB Oyster Restoration- GWR Rehabilitation CW Various $0-$1M In Design Sole Source DBB 2013 3
Craney Island Rehandling Basin CW Craney Island $1-$5M Preparing Plans and Specifications IFB DBB 2013 1 Maintenance Dredging Contract
DLA - Renovate Bldg 24 (Round House) OMA DLA- Richmond $1-$5M In Design RFP DB 2013 1 HUBZone
DLA - Renovate Bldg 42 (Bellwood Club) OMA DLA- Richmond $1-$5M In Design RFP DB 2013 1 X SB
DLA - Renovate Bldg 56 (Water Plant) OMA DLA- Richmond $0-$1M In Design RFP DB 2013 1 X 8a
DLA - Renovate Bldg 70 OMA DLA- Richmond $0-$1M In Design RFP DB 2013 1 X 8a
DLA - Repair Parking Lots OMA DLA- Richmond $1-$5M In Design IDC DB 2013 2 X SB
DLA - Repair WH 9 and 12 Roofs OMA DLA- Richmond $1-$5M Waiting for Design Funds RFP DB 2013 4 Alaska Native
DLA - Roadway Repair/Paving OMA DLA- Richmond $1-$5M In Design IDC DB 2013 2 X SB
DoDEA SRM OMA Various $1-$5M Existing Construction Contracts 2013 1,2,3,4 X SB
DoDEA SRM OMA Various $1-$5M Existing Construction Contracts 2013 1,2,3,4 X SDV
DoDEA SRM OMA Various $1-$5M Existing Construction Contracts 2013 1,2,3,4 X WO
Fort AP Hill - AHA Reconfiguration OMA Fort AP Hill $0-$1M Design started TBD DBB 2013 4 X Design just awarded
Fort AP Hill - B1547 Renovation OMA Fort AP Hill $0-$1M Design ongoing TBD DBB 2013 3 X
Fort Eustis - Renovate Bldg 663 OMA Fort Eustis $5-10M RTA 30SEP12, Waiting for $$$ TBD DBB 2013 1 X Need to determine strategy
Fort Eustis - Renovate Bldg 664 OMA Fort Eustis $5-10M RTA 30SEP12, Waiting for $$$ TBD DBB 2013 1 X Need to determine strategy
Fort Lee - AIT Barracks Phase II (Barracks and Site) MCA Fort Lee $40-$60M In Design MATOC DBB 2013 2 NER UNR MATOC, capacity from SWF
Fort Lee - Phase II BTN and BDE HQs MCA Fort Lee $5-10M In Design MATOC DBB 2013 3 X NER SB MATOC, capacity from SWF
Fort Lee - Phase II USMC HQ MCA Fort Lee $1-$5M In Design MATOC DBB 2013 2 X NER SB MATOC, capacity from SWF
Fort Lee - Repair Barracks 3004 OMA Fort Lee $10-$15M In Design IFB DBB 2013 2 X
Fort Pickett - PEB Concrete Pad OMA Fort Pickett $0-$1M In Design Sole Source DBB 2013 2 X SB
Fort Pickett - Renovate 2600 Compound OMA Fort Pickett $0-$1M In Design Sole Source DBB 2013 2 X SB
Fort Pickett - Renovate Bldg 1724 OMA Fort Pickett $0-$1M In Design Sole Source DBB 2013 2 X 8a - Syncon
James River Channel Dredging CW Various $5-10M Design, Plans and Specifications IFB DBB 2013 2 X Maintenance Dredging Contract. New IDIQ Contract FY13 Award. Base year plus two option years ($3M per year).
11/14/2012, 9:10 AM
U.S. Army Corps of Engineers Norfolk District (NAO)FY13 Forecast of Contracting Opportunities
Project Description Program Location Estimated Cost
Status Method Acq Strategy
FY QTR Small Business
NOTES
MEPS Charlotte OMA Charlotte $0-$1M furniture IFB 2013 1 X
MEPS Chicago OMA Chicago $0-$1M furniture IFB 2013 1 X
MEPS Houston OMA Houston $0-$1M furniture IFB 2013 1 X
MEPS Salt Lake City OMA Salt Lake City $0-$1M furniture IFB 2013 1 X
NASA LaRC Various Renovations IIS NASA Langley $1-$5M Waiting for Funds IFB DBB 2013 1 X
NOAA Norfolk Dredging IIS Norfolk $1-$5M Permiting actions by Planning IFB DBB 2013 4 TBD
Norfolk Harbor and Channels CW Norfolk $1-$5M Preparing Plans and Specifications IFB DBB 2013 2 Maintenance Dredging Contract
Norfolk Harbor Thimble Shoals Channel CW Norfolk $1-$5M Design, Plans and Specifications IFB DBB 2013 3 Maintenance Dredging Contract
NPS - Colonial Natl Historic Park, Bank Stabilization IIS Yorktown $0-$1M Waiting for FONSI to Advertise Sole Source DBB 2013 1 X 8a P&M Construction
Quantico Dam OMA Quantico $5-10M Revising Acq Strategy DB 2013 1
Remote Delivery Facility MCA Rivanna Station $5-$10M Developing RFP IFB DB 2013 3 X
Tylers Beach Maintenance Dredging CW Tylers Beach $0-$1M Design In Progress DBB 2013 4 X Maintenance Dredging Contract
WCV Maintenance Dredging CW Various $1-$5M Design, Plans and Specifications In Progress DBB 2013 2 X Maintenance dredging 50,000 CY from portions of the WCV project near Wachapreague, Va.
NEW DDESS SRM AE IDIQ A-E Various $10,000 NEW SB IDIQ 2013 2 10M/4yr SB AE IDIQ
NEW DoDEA MILCON SB A-E Various $10,000 NEW SB IDIQ 2013 3 10M/4yr SB AE IDIQ
NEW DoDEA MILCON UNR A-E Various $10,000 NEW UN IDIQ 2013 3 10M/4yr UNR AE
IDIQ