Top Banner
US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27 Nov 12
14

US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27.

Jan 04, 2016

Download

Documents

Clinton Francis
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27.

US Army Corps of Engineers

BUILDING STRONG®

FY13 Wastewater Treatment PlantJoint Base Lewis-McChord, WA

Industry DayPresentation

Seattle District27 Nov 12

Page 2: US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27.

BUILDING STRONG®

FY13 WWTP, JBLM, WAIndustry Day

Overview

• Where?

• Why?

• What?

• How?

• Who?

2

Page 3: US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27.

BUILDING STRONG®

HERE!• JBLM-North

• Tatsolo Point

• Solo Pt Rd, Off of

Dupont-Steilacoom Rd

FY13 WWTP, JBLM, WAWhere?

3

JBLM

N

Page 4: US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27.

BUILDING STRONG®4

N

Page 5: US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27.

BUILDING STRONG®5

N

Page 6: US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27.

BUILDING STRONG®

FY13 WWTP, JBLM, WAWhy?

Current Plant• Constructed Circa 1955• Supports JBLM, Camp Murray, American Lake• Maintained, Repaired, & Upgraded for 57 yrs• Maintains Permit Compliance

Page 7: US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27.

BUILDING STRONG®

FY13 WWTP, JBLM, WAWhy?

But Times Are Changing …• South Puget Sound Critical Habitat Concerns• Higher Regulatory Standards for Treatment• JBLM Moving Towards ‘Zero Discharge’ • Preparing for JBLM Purple Pipe Re-Use

Page 8: US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27.

BUILDING STRONG®

FY13 WWTP, JBLM, WAWhy?

2008

2010

2012

2014

2016

2018

2020

2022

2024

2026

2028

2030

56,000

61,000

66,000

71,000

76,000

81,000

86,000

91,000

96,000

101,000

Po

pu

lati

on

Year

Page 9: US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27.

BUILDING STRONG®

FY13 WWTP, JBLM, WAWhat?

Project Parameters• FY 13 Army MILCON Program• Project Programmed Amount = $91M• Support 2030 Target Population of 100,000• Constructs New WWTP• De-Commissions & Mothballs Existing WWTP• Training/Change-Over/Commissioning of New WWTP Prior to Gov’t Acceptance

Page 10: US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27.

BUILDING STRONG®

FY13 WWTP, JBLM, WAWhat?

2030Influent Dsn Flow (MGD)Avg Dry Weather Flow 3.7Annual Avg Flow 4.4Max Month Flow 6.7Peak Day Flow 10.0Peak Hour Flow 12.0*

*w/ Consideration for WWTP Expansion to 18 MGD (+50%)

Page 11: US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27.

BUILDING STRONG®

Project Development• Design-Build Construction Contract• Conventional Activated Sludge Plant, w/ Tertiary Membrane Filtration• Discharge Criteria

• Meet ‘Class A’ Stds w/ Nitrogen Removal• Meet Current Permit Stds• Ready for Future Permit Climate

• Prepare for ‘Purple Pipe’ Under Ph II WWTP

FY13 WWTP, JBLM, WAWhat?

Page 12: US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27.

BUILDING STRONG®

FY13 WWTP, JBLM, WAHow?

D-B RFP Status• Parametric Design Report (PDR) - Completed• Design Charrette - Completed• Value-Engineering (V-E) Study - Completed• Draft D-B RFP Review - Completed• D-B RFP Ready to Advertise (RTA) - ~ Feb 2013• Two-Step, Best-Value, D-B Acquisition

Page 13: US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27.

BUILDING STRONG®

FY13 WWTP, JBLM, WAWho?

That’s A Good Question …

Page 14: US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27.

BUILDING STRONG®

FY13 WWTP, JBLM, WAIndustry Day

14

Camp Lewis - 1917