US Army Corps of Engineers BUILDING STRONG ® FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA Industry Day Presentation Seattle District 27 Nov 12
Jan 04, 2016
US Army Corps of Engineers
BUILDING STRONG®
FY13 Wastewater Treatment PlantJoint Base Lewis-McChord, WA
Industry DayPresentation
Seattle District27 Nov 12
BUILDING STRONG®
FY13 WWTP, JBLM, WAIndustry Day
Overview
• Where?
• Why?
• What?
• How?
• Who?
2
BUILDING STRONG®
HERE!• JBLM-North
• Tatsolo Point
• Solo Pt Rd, Off of
Dupont-Steilacoom Rd
FY13 WWTP, JBLM, WAWhere?
3
JBLM
N
BUILDING STRONG®4
N
BUILDING STRONG®5
N
BUILDING STRONG®
FY13 WWTP, JBLM, WAWhy?
Current Plant• Constructed Circa 1955• Supports JBLM, Camp Murray, American Lake• Maintained, Repaired, & Upgraded for 57 yrs• Maintains Permit Compliance
BUILDING STRONG®
FY13 WWTP, JBLM, WAWhy?
But Times Are Changing …• South Puget Sound Critical Habitat Concerns• Higher Regulatory Standards for Treatment• JBLM Moving Towards ‘Zero Discharge’ • Preparing for JBLM Purple Pipe Re-Use
BUILDING STRONG®
FY13 WWTP, JBLM, WAWhy?
2008
2010
2012
2014
2016
2018
2020
2022
2024
2026
2028
2030
56,000
61,000
66,000
71,000
76,000
81,000
86,000
91,000
96,000
101,000
Po
pu
lati
on
Year
BUILDING STRONG®
FY13 WWTP, JBLM, WAWhat?
Project Parameters• FY 13 Army MILCON Program• Project Programmed Amount = $91M• Support 2030 Target Population of 100,000• Constructs New WWTP• De-Commissions & Mothballs Existing WWTP• Training/Change-Over/Commissioning of New WWTP Prior to Gov’t Acceptance
BUILDING STRONG®
FY13 WWTP, JBLM, WAWhat?
2030Influent Dsn Flow (MGD)Avg Dry Weather Flow 3.7Annual Avg Flow 4.4Max Month Flow 6.7Peak Day Flow 10.0Peak Hour Flow 12.0*
*w/ Consideration for WWTP Expansion to 18 MGD (+50%)
BUILDING STRONG®
Project Development• Design-Build Construction Contract• Conventional Activated Sludge Plant, w/ Tertiary Membrane Filtration• Discharge Criteria
• Meet ‘Class A’ Stds w/ Nitrogen Removal• Meet Current Permit Stds• Ready for Future Permit Climate
• Prepare for ‘Purple Pipe’ Under Ph II WWTP
FY13 WWTP, JBLM, WAWhat?
BUILDING STRONG®
FY13 WWTP, JBLM, WAHow?
D-B RFP Status• Parametric Design Report (PDR) - Completed• Design Charrette - Completed• Value-Engineering (V-E) Study - Completed• Draft D-B RFP Review - Completed• D-B RFP Ready to Advertise (RTA) - ~ Feb 2013• Two-Step, Best-Value, D-B Acquisition
BUILDING STRONG®
FY13 WWTP, JBLM, WAWho?
That’s A Good Question …
BUILDING STRONG®
FY13 WWTP, JBLM, WAIndustry Day
14
Camp Lewis - 1917