Page 1: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

US Army Corps of Engineers

BUILDING STRONG®

Agricultural Irrigation and the Agricultural Irrigation and the Corps Regulatory ProgramCorps Regulatory Program

Jean Gibby

Thomas Brown

Page 2: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

OverviewOverview- Regulatory Authorities- Jurisdiction-Streams and Wetlands- Types of Corps Permits- Exemptions- Excavated Ponds- Embankment Ponds- Permitting of Ponds not eligible for Exemption

BUILDING STRONG®

Page 3: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Authority and Jurisdiction – Section 10 of the Authority and Jurisdiction – Section 10 of the Rivers and Harbors Act of 1899 Rivers and Harbors Act of 1899

Regulated Activities: All work or structures in,

over, under, or affecting navigable waters that affect course, condition or capacity of navigation.

Examples include docks, navigational aids, aerial transmission lines, dredging, shore protection devices, etc.

BUILDING STRONG®

Page 4: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

The Clean Water Act (1972)The Clean Water Act (1972)

Section 101.(a) The objective of this Act is to restore and maintain the chemical, physical, and biological integrity of the Nation’s waters. Section 404 established a permit program to be administered by the U.S. Army Corps of Engineers.

BUILDING STRONG®

Page 5: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Authorities – Section 404Authorities – Section 404 Waters of the US 33 CFR 328.3

- All waters which are currently used, or were used in the past or may be susceptible to use in interstate or foreign commerce, including all waters which are subject to the ebb and flow of the tide.

- All interstate waters including interstate wetlands.

- All waters which the use, degradation or destruction of could affect interstate or foreign commerce. (recreation, travel, shellfish, industrial purposes)

- All tributaries to these waters.

- All impoundments of these waters.

- All Wetlands adjacent to these waters.

BUILDING STRONG®

Page 6: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Authorities – Section 404Authorities – Section 404All waters of the U.S.,

including wetlands streams-ephemeral,

intermittent, perennial rivers, ponds and lakes

Regulate the discharge of dredged or fill material and mechanized landclearing if there is a discharge of fill material

BUILDING STRONG®

Page 7: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Jurisdiction – Section 404 Clean Jurisdiction – Section 404 Clean Water ActWater Act

Definitions: Ordinary High Water –

shoreward limit of jurisdiction for all non-tidal waters; line on the shore established by normal fluctuations in the water level

BUILDING STRONG®

Page 8: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Wetland DefinitionsWetland Definitions

Corps/EPA definition - for Clean Water Act Section 404 purposes:►Areas that are inundated or saturated by

surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions-33 CFR 328.3(b)

BUILDING STRONG®

Page 9: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

COE Manual Designed to COE Manual Designed to Identify and Delineate Identify and Delineate

WetlandsWetlands1987 Corps of Engineers Wetlands

Delineation Manual As amended by:

► Implementation Guidance dated 27 Aug 1991► Q & A dated 7 Oct 1991► Clarification Guidance dated 6 Mar 1992► Regional Supplements► Rapanos Supreme Court Case

BUILDING STRONG®

Page 10: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Diagnostic Diagnostic CharacteristicsCharacteristics

Hydrophytic Vegetation►Dominated by species that are tolerant of

prolonged inundation or soil saturation Hydric Soils

►Exhibit characteristics that develop under permanent or periodic soil saturation

Wetland Hydrology►Evidence of ongoing wetland conditions

BUILDING STRONG®

Page 11: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Wetland ValuesWetland Values

… flood control … water quality

Wetlands provide benefits to society out of proportion to their extent on the landscape.

… habitat

BUILDING STRONG®

Page 12: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Are these Wetlands?Are these Wetlands?

Some wetlands are easy to identify . . .

BUILDING STRONG®

Page 13: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Are these Wetlands?Are these Wetlands?

. . . others can be difficult and controversial.

BUILDING STRONG®

Page 14: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Wetland DefinitionsWetland Definitions Food Security Act (Swampbuster) Versus COE

Wetland Delineations under 87 Manual:►On properties which involve annual planted

commodities where either the owner or tenant is a program participant for cost share, crop insurance, etc.,-activities within the fields is Natural Resources Conservation Service’s (NRCS) call versus once in the woods and not for agricultural purposes is subject to COE delineation.

►NRCS doesn’t look at stream impacts as violating Food Security Act provisions-entirely COE call

BUILDING STRONG®

Page 15: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®15

Types of PermitsTypes of Permits

Standard Individual Permit (SIP)►Project-specific evaluation and authorization►Substantial process steps

• public notice• public involvement

Letters of permission►Less controversial activities►Minor impacts, coordinate with agencies

BUILDING STRONG®

Page 16: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®16

Types of PermitsTypes of Permits

General permits► May have project-specific evaluation and verification

• Non-reporting general permits• Reporting general permits

► Similar activities resulting in minimal adverse effects to aquatic environment

• May require mitigation for minimal effects ► Developed and issued with same process as individual permits ► Cannot be issued for more than five years

Types of general permits► Nationwide permits► Regional general permits► Programmatic general permits

BUILDING STRONG®

Page 17: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

33 CFR 323.4 33 CFR 323.4 Discharges Not Requiring PermitsDischarges Not Requiring Permits Normal farming, silviculture and ranching

activities such as plowing, seeding, cultivating, minor drainage and harvesting for the production of food, fiber and forest products

COE does not consider certain activities that may be considered agricultural by NRCS, such as christmas tree farms, ornamental nursery plants, horses (this is not an inclusive listing)

BUILDING STRONG®

Page 18: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

33 CFR 323.4 (a)(2) Maintenance of 33 CFR 323.4 (a)(2) Maintenance of Existing StructuresExisting Structures

Maintenance, including emergency reconstruction of recently damaged parts, of currently serviceable structures such as dikes, dams, levees, groins, riprap, breakwaters, causeways, bridge abutments or approaches, and transportation structures. Maintenance does not include any modification that changes the character, scope, or size of the original fill design. Emergency reconstruction must occur within a reasonable period of time after damage occurs in order to qualify for this exemption.

BUILDING STRONG®

Page 19: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

33 CFR 323.4 (a)(3) Discharges Not 33 CFR 323.4 (a)(3) Discharges Not Requiring PermitsRequiring Permits

Construction or maintenance of farm or stock ponds or irrigation ditches, or the maintenance (but not construction) of drainage ditches. Discharges associated with siphons, pumps, headgates, wingwalls, weirs, diversion structures, and such other facilities as are appurtenant and functionally related to irrigation ditches are included in this exemption.

BUILDING STRONG®

Page 20: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

33 CFR 323.4 (c) 33 CFR 323.4 (c) Discharges Not Requiring PermitsDischarges Not Requiring Permits

Any discharge of dredged or fill material into waters of the United States incidental to such exempt activities must have a permit if it is part of an activity whose purpose is to convert an area of waters of the United States into a use to which it was not previously subject, where the flow or circulation of waters of the United States may be impaired or the reach of such waters reduced. Where the proposed discharge will result in significant discernible alterations to flow or circulation, the presumption is that flow or circulation may be impaired by such alternation.

BUILDING STRONG®

Page 21: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Construction and Maintenance of Construction and Maintenance of Farm Ponds and Irrigation DitchesFarm Ponds and Irrigation Ditches

►Size appropriate based upon demonstrated agricultural needs.

►Cannot convert an area of waters of the United States to a use to which it was not previously subject;

►Must be able to provide a water budget, including projected irrigation amounts per acre. (Inches/acre)

Page 22: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Excavated PondsExcavated Ponds

Excavated ponds may be exempt provided:►Excavated material placed on high ground

where available;►If material placed in wetlands, it must be

discharged into discontinuous piles to maintain the reach of the surface waters.

BUILDING STRONG®

Page 23: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Old Pond, Probably Excavated in Wetlands.

Page 24: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Page 25: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Pond excavated in high ground.No permit or exemption required.

Page 26: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Embankment PondsEmbankment Ponds

Can not impair the flow or circulation of waters of the United States or reduce the reach of such waters;

Embankment ponds with dams across streams have potential to impair/reduce flows, especially during periods of low rainfall and irrigation use. Accordingly, a Low Flow Device may be required in order to meet the requirements for obtaining exemption concurrence from the COE.

BUILDING STRONG®

Page 27: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Low Flow Device Low Flow Device ExamplesExamples

Page 28: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Page 29: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Page 30: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Page 31: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Low Flow DeviceLow Flow Device

Allows water to continue flowing downstream, even when inflows are low.

Only way an embankment pond can meet the exemption.

BUILDING STRONG®

Page 32: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Will a Low Flow Device Be Will a Low Flow Device Be RequiredRequired

Corps of Engineers determines whether a low flow device is needed on a case by case basis.

Corps will perform an on site review to determine stream quality.

BUILDING STRONG®

Page 33: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Stream AssessmentStream Assessment

Assessing quality of stream by Assessing quality of stream by evaluating aquatic life, stability, evaluating aquatic life, stability, riparian buffers, etc.riparian buffers, etc.

Type and quality of stream Type and quality of stream dictates which permits are dictates which permits are available and any mitigation available and any mitigation requirements.requirements.

Quality of stream and flow Quality of stream and flow (perennial vs. Intermittent) (perennial vs. Intermittent) determine the need for a Low determine the need for a Low Flow Device.Flow Device.

BUILDING STRONG®

Page 34: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Pond Under Construction

Page 35: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Completed

Page 36: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Removed

Page 37: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Exemption FormsExemption Forms

BUILDING STRONG®

Page 38: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®BUILDING STRONG®

Suggested Steps for Agricultural Pond Evaluation & Suggested Steps for Agricultural Pond Evaluation & Approval to BuildApproval to Build

2. Review the potential alternatives for your agricultural water needs.

1. Contact your local USDA-NRCS or County Soil & Water office to complete a “Preliminary Site Assessment for New Ponds”

Page 39: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Suggested Steps for Agricultural Pond Evaluation & Suggested Steps for Agricultural Pond Evaluation & Approval to BuildApproval to Build

3. Review potential regulatory requirements. US Army Corps of Engineers Farm Pond or other Irrigation Exemption Request should be completed and placed in the file unless requesting a Department of Army permit. Note: exemptions will only be granted when the size of the pond does not exceed agricultural water needs.

4. Consult with your local USDA-NRCS or County Soil & Water office to determine if technical and / or financial assistance is available.

5. After consultation with your local USDA-NRCS or County Soil & Water office, have a preliminary pond layout developed. Preliminary layout may be either from a local grading company who may be used to build the pond or from a professional civil, agricultural, or environmental engineer. Owner may contact the NC Division of Land Resources to determine dam permit requirements.

Page 40: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

US Army Corps of Engineers Farm Pond/Irrigation Exemption Request I, _______________________________, am the current owner of the following property located at: ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ I wish to pursue confirmation from the United States Army Corps of Engineers (Corps) that the activity I propose is exempt from Department of the Army (DA) permitting subject to Section 404 of the Clean Water Act, 33CFR, Part 323.4 (3). This regulation states that construction or maintenance of farm or stock ponds or irrigation ditches, or the maintenance (but not construction) of drainage ditches may be exempt from DA permitting requirements. Discharges associated with siphons, pumps, headgates, wingwalls, weirs, diversion structures, and such other facilities as are appurtenant and functionally related to irrigation ditches are included in this exemption. Furthermore, I understand that in order to qualify for the exemption, a low flow orifice may be required to be installed on the principal spillway pipe in order to maintain downstream flow during the filling of the pond and during dry weather conditions. Normal downstream flow must be maintained at all times. Compliance with this provision shall be determined by the Corps on a case-by-case basis. In addition, if the land use surrounding the pond changes from agricultural use to a non-agricultural use, including, but not limited to a commercial or residential development, the pond will no longer be exempt and a DA individual permit will be required, if the jurisdictional impacts to waters of the United States exceeds either 0.5 acre of wetlands and/or 300 linear feet of stream channel subject to regulatory authority pursuant to Section 404 of the Clean Water Act. Should the impacts be less than those mentioned above, then the project might qualify for DA nationwide permitting. Signature _______________________________________________________________ Printed Name____________________________________________________________ Address (if different from above)_____________________________________________ ________________________________________________________________________________________________________________________________________________________________________________________________________________________Home Telephone Number___________________________________________________ Mobile Telephone Number__________________________________________________

Page 41: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Suggested Steps for Agricultural Pond Evaluation & Suggested Steps for Agricultural Pond Evaluation & Approval to BuildApproval to Build

6. If the building site of the pond is on a USDA-FSA Farm Serial Number review and sign a “Confidentiality Agreement” that will allow USDA-NRCS to discuss your potential pond site with various federal and state agencies. After signing the “Confidentiality Agreement”, consult with USDA-NRCS to determine if the Swampbuster “WX” exemption applies. Following that determination, the USDA-NRCS can provide guidance to whether you need to contact the Army Corps of Engineers, NC Division of Land Resources-Dam Safety Program and/ or North Carolina Division of Water Quality for regulatory requirements.

Page 42: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Suggested Steps for Agricultural Pond Evaluation & Suggested Steps for Agricultural Pond Evaluation & Approval to BuildApproval to Build

7. If the proposed pond site does not have a USDA-FSA Farm Serial Number, the landowner should take a copy of the “Preliminary Site Assessment for New Ponds” and a preliminary pond layout to the appropriate Army Corps of Engineers office, NC Division of Land Resources-Dam Safety Program and North Carolina Division of Water Quality for a preliminary assessment of regulatory requirements.

Page 43: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Suggested Steps for Agricultural Pond Evaluation & Suggested Steps for Agricultural Pond Evaluation & Approval to BuildApproval to Build

8. Begin the pond construction only after determining and securing the required permits or exemptions based upon completion of the above recommended steps.

Page 44: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

PRELIMINARY SITE ASSESSMENT FOR NEW PONDS Revised July 16, 2009

Note: This preliminary assessment does NOT constitute a formal soil or geologic investigation or a pond design, and should not be used for construction. The information on this form represents a preliminary site assessment to evaluate the feasibility of a potential pond site, and assist in determining the priority for engaging engineering services for a more thorough site investigation and design.

INFORMATION

Client Name: _____________________________________________ Tract/Field: ______________________

Mailing Address: _________________________________________________________ County of Pond Site: __________________

Is the Pond Site located on a tract of land with a conservation easement? _____yes _____no

Purpose of Pond: Irrigation Livestock Water What is the river basin? ___________________________

SITE CHARACTERISTICS All values are estimated and best opinion values. Detailed field surveys and site investigations are not a part of this assessment.

Estimated drainage area: _____________ acres

Estimated pool area: _____________ acres

Estimated depth of water: _____________ feet

Estimated embankment height: _____________ feet

Estimated length of dam: _____________ feet

Hazard classification (if known) _____________

List soil map units in the area that are suitable for:

core trench _____________________________

embankment _____________________________

Is site’s topography generally suitable for an embankment or excavated pond, including an emergency spillway? ______ (Y/N) If No, explain in Notes Section.

Do the physical characteristics of the site appear suited for development of a pond that can address the purpose indicated above and satisfy the program requirements? _____ (Y/N) If No, explain in Notes Section.

Are there any known geologic or soil features that may restrict ability of pond to hold water, or require special design or construction? ______ (Y/N) If Yes, explain in Notes Section.

Complete for Irrigation Pond

Acres to be irrigated ____________acres

Crops to be irrigated _________________________

Irrigation method ____________________________

Complete for Livestock Water Ponds

Yes No Water is to be used for livestock production. If yes complete below.

Type of livestock

No. of livestock

Type of production operation

Page 45: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Estimated extent of wetlands and streams

Including isolated wetlands that may be exempt from the CWA, what is the estimated acreage of wetlands that will be permanently inundated by pond water or covered by the embankment/spillway?

____________ Acres

May Include Isolated Waters _____Yes or _____No

Approximately how many linear feet of stream will be permanently inundated by pond water or covered by the embankment/spillway?

_________feet of stream

The attached information sheet on ponds and permitting issues has been discussed with the participant. The participant has been informed that obtaining permits is the responsibility of the landowner/participant.

Yes No

CONCLUSIONS

The information collected in this preliminary investigation applies only to the site identified on the attached location map.

Based on the preliminary assessment, I recommend this potential pond site for further site investigation and design. Yes No

Notes:

Representative: __________________________________ Agency:___________ Date: __________

Attach Map Indicating Site Location

Page 46: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

FACT SHEET: Planning & Permitting Requirements Associated with Pond Construction

It is the landowner/participant’s responsibility to comply with all federal, state, and local laws and permit requirements.

USDA Wetlands Conservation (WC) Provisions of the FSA of 1985 – Swampbuster:

All USDA program participants are encouraged to file an AD-1026 with the Farm Service Agency. Manipulation of wetlands in order to develop a pond embankment, spillway, or pool area is not a violation of Wetlands Compliance provisions of the Food Security Act, as this wetland manipulation does not make the production of a commodity crop possible. NRCS wetland determination on these areas would likely be labeled “WX”, which would not result in non-compliance.

If other potential wetland areas will be manipulated as part of the pond construction where production of a commodity crop would be possible (even if there are no plans to plant a commodity crop), then compliance with the Food Security Act could be affected.

Page 47: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Federal and State Wetland, Stream, Buffer and Dam Safety Regulatory Programs:

The Federal Water Pollution Control Act, more commonly known as the "Clean Water Act," under Section 404, directs the U.S. Army Corps of Engineers (the Corps) to issue permits for the discharge of dredged or fill material into waters or wetlands of the U.S. This law has a direct impact on the development of ponds on non-isolated waters or wetlands considered under the jurisdiction of this law. Pond construction for irrigation and livestock water can sometimes be exempt from the Corps regulatory program and the NC Division of Water Quality’s (DWQ) wetlands protection rules; however, there are also circumstances when permits may be required to construct farm ponds. Determining which areas qualify for protection is a Corps responsibility. For more information: http://www.saw.usace.army.mil/WETLANDS/index.html

Participants should be aware that the wetland determination and jurisdiction of the Clean Water Act is not the same as any determination made by USDA for the Wetlands Compliance provisions of the Farm Bill.

If the Corps determines that a 404 Permit or Section 10 Permit is required, then a 401 Water Quality Certification is also required from the DWQ. When the state issues a 401 Certification, this certifies that a given project will not degrade Waters of the State or otherwise violate water quality standards. For more information: http://h2o.enr.state.nc.us/ncwetlands/

A buffer authorization may be required if your property occurs in a regulated buffer basin. If a new or expanded pond occurs on a buffered stream, restoration of the buffer may be required. Every site has unique conditions. Contact Central or appropriate Regional Office staff at DWQ with direct questions about your project to discuss applicability and implications of the buffer rules. These contacts and other information about the Buffer Rules are posted at: http://h2o.enr.state.nc.us/ncwetlands/RiparianBufferRules.htm#buffer_rules.

An Isolated Wetlands Permit may be needed from DWQ when the Corps determines that a wetland to be potentially impacted is not 404 jurisdictional. An Isolated Wetlands Permit is not a 401 Certification. The application process is similar to applying for a 401 Certification. For more information: http://h2o.enr.state.nc.us/ncwetlands/

Page 48: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

In NC, some waters in western counties have trout designations. Certain activities on these waters, depending upon the stream designation and time of year, may be restricted in order to protect this valuable resource. If you are in a "trout" county, check with the Corps representative to see if additional restrictions apply. http://www.saw.usace.army.mil/WETLANDS/where/imap2/index.html

If the proposed pond will disturb more than one acre, a Sediment and Erosion Control Permit may be required from the NC Division of Land Resources (DLR). Some agricultural activities are considered exempt. For more information: http://www.dlr.enr.state.nc.us/pages/sedimentation_new.html

Depending upon factors such as dam height, drainage area, downstream land use, and other factors, a permit from the DLR Dam Safety Program could be required. For more information: http://www.dlr.enr.state.nc.us/pages/damsafetyprogram.html

Other state or local ordinances could apply to some sites. Rules or guidance associated with the Coastal Area Management Act, NC River Basin rules, or other regulatory programs should be considered. For more information: http://www.enr.state.nc.us/

Page 49: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

PermittingPermitting Options Options

Nationwide Permit (NWP) 40 - Agricultural Activities-Authorizes the construction of farm ponds that do not qualify for the Clean Water Act Section 404(f)(1)(C) exemption because of the recapture provision at Section 404(f)(2).

Page 50: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Nationwide Permit 18 - Minor Discharges – Minor discharges of dredged or fill material into all waters of the United States.

PermittingPermitting Options Options

Nationwide Permit 29 – Residential Developments - Discharges of dredged or fill material into non-tidal waters of the United States for the construction of a single residence, a multiple unit residential development, or a residential subdivision.

Page 51: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

PermittingPermitting Options Options

Standard Permit - Individual Permit- Project Specific- Still Required to Avoid and minimize impacts, along with providing alternatives and mitigation.- Required if jurisdictional impacts exceed 0.5 acre of wetlands and/or 300 linear feet of stream channel which exhibits important aquatic functions and are not eligible for nationwide permit authorization.

Page 52: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Page 53: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Page 54: US Army Corps of Engineers BUILDING STRONG ® Agricultural Irrigation and the Corps Regulatory Program Jean Gibby Thomas Brown.

BUILDING STRONG®

Questions?Questions?