  US 59 Loop Upgrade Project Public Meeting & Chapter 26 Public Hearing         Where: Western Hemispheric Trade Center ‐ Rm 111‐ Texas A&M International University 5201 University Blvd., Laredo, TX 78041     When: Tuesday, March 28 th , 2017 Public Meeting: 5:00 p.m. ‐ 6:00 p.m. Chapter 26 Hearing:  6:00 p.m.     Purpose: TxDOT will host an open house meeting to present the proposed upgrade of the US 59 Loop, known locally as Loop 20 and Bob Bullock Loop, in eastern Laredo, Webb County.  There will also be a Chapter 26 Parks & Wildlife Code Public Hearing on the proposed impacts to the Casa Blanca Golf Course and Lake Casa Blanca State Park.  The impacts to these two parklands would be minimal. Description: The proposed US 59 Loop Upgrade project consists of the following:  Widen the existing sixlanes to a full expressway with 3lane mainlanes and 3lane frontage roads in each direction from International Blvd. south to the Loop 20/US 59 interchange. Approximately  184acres of additional rightofway would be needed.  Construct mainlane overpasses at Shiloh Drive / Del Mar Blvd. / University Blvd. / Jacaman Rd. / Airport Drive.  This project would tie into the ongoing work south of the US 59/Loop 20 intersection at Spur 400 (Clark) and at International Blvd. as well as the existing overpass at McPherson Rd.  It would also integrate with the future construction of the Loop mainlanes over IH 35.  When completed, this roadway would be officially designated as a portion of I69West (I69W).  Approximately 15.7acres would be acquired from the golf course adjacent to the Loop.  Approximately 2.1acres would be acquired from the State Park property.  The Park entrance would be realigned to Ranchito Road to improve the traffic safety at that location.  Both properties would continue to be fully functional as a golf course and state park.   Contact: TxDOT  Laredo District                                                        TxDOT  Laredo District Mike Graham  District Environmental Coordinator       Raul Leal  Public Information Officer                   [email protected]                                                  [email protected]                                              (956) 7127742                                                                     (956) 7127416 The environmental review, consultation, and other actions required by applicable Federal Environmental laws for this project are being, or have been, carried out by TxDOT pursuant to 23 U.S.C 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT. TAMIU Western Hemispheric Trade Center Room 111 5:00 to 7:00 PM 
2

US 59 Loop Upgrade Project Public Meeting & Chapter 26 ...ftp.dot.state.tx.us/.../lrd/us-59-loop-international/022817-flier.pdf · US 59 Loop Upgrade Project Public Meeting & Chapter

Mar 30, 2018

Download

Documents

trinhxuyen
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: US 59 Loop Upgrade Project Public Meeting & Chapter 26 ...ftp.dot.state.tx.us/.../lrd/us-59-loop-international/022817-flier.pdf · US 59 Loop Upgrade Project Public Meeting & Chapter

 

 

US 59 Loop Upgrade Project Public Meeting & Chapter 26 Public Hearing

  

 

 

 

 

 

 

Where:  Western Hemispheric Trade Center ‐ Rm 111‐ 

Texas A&M International University 5201 University Blvd., Laredo, TX 78041 

    When: Tuesday, March 28th, 2017 Public Meeting: 5:00 p.m. ‐ 6:00 p.m. Chapter 26 Hearing:  6:00 p.m. 

     

Purpose:  TxDOT will host an open house meeting to present the proposed upgrade of the US 59 Loop, known locally as Loop 20 and Bob Bullock Loop, in eastern Laredo, Webb County.  There will also be a Chapter 26 Parks & Wildlife Code Public Hearing on the proposed impacts to the Casa Blanca Golf Course and Lake Casa Blanca State Park.  The impacts to these two parklands would be minimal. 

Description:  The proposed US 59 Loop Upgrade project consists of the following:  Widen the existing six‐lanes to a full expressway with 3‐lane mainlanes and 3‐lane frontage roads in 

each direction from International Blvd. south to the Loop 20/US 59 interchange. Approximately  184‐acres of additional right‐of‐way would be needed. 

Construct mainlane overpasses at Shiloh Drive / Del Mar Blvd. / University Blvd. / Jacaman Rd. / Airport Drive. 

This project would tie into the ongoing work south of the US 59/Loop 20 intersection at Spur 400 (Clark) and at International Blvd. as well as the existing overpass at McPherson Rd.  It would also integrate with the future construction of the Loop mainlanes over IH 35. 

When completed, this roadway would be officially designated as a portion of I‐69West (I‐69W).  Approximately 15.7‐acres would be acquired from the golf course adjacent to the Loop.  

Approximately 2.1‐acres would be acquired from the State Park property.  The Park entrance would be realigned to Ranchito Road to improve the traffic safety at that location.  Both properties would continue to be fully functional as a golf course and state park.   

Contact:  TxDOT – Laredo District                                                        TxDOT – Laredo District Mike Graham – District Environmental Coordinator       Raul Leal – Public Information Officer                   [email protected]                                                  [email protected]                                              (956) 712‐7742                                                                      (956) 712‐7416 

The environmental review, consultation, and other actions required by applicable Federal Environmental laws for this project are being, or have been, carried out by TxDOT pursuant to 23 U.S.C 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT. 

TAMIU Western Hemispheric Trade Center 

Room 111 5:00 to 7:00 PM 

Page 2: US 59 Loop Upgrade Project Public Meeting & Chapter 26 ...ftp.dot.state.tx.us/.../lrd/us-59-loop-international/022817-flier.pdf · US 59 Loop Upgrade Project Public Meeting & Chapter

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clark

Airport Dr.

To World Trade International

Bridge IV

International Blvd. Interchange Mainlanes Under Construction

Shiloh Road Future Interchange

Del Mar Road Future Interchange

University Blvd. Future Interchange

Jacaman Road Future Interchange

Airport Drive Future Interchange

US 59/Bus. 59/Loop 20 Interchange

Open to Traffic

Existing I-69W

Golf Course

State Park

Laredo International

Airport

Lake Casa

Blanca

Laredo, Webb

County

Northern Project Limits

Southern Project Limits

Project Limits Existing Interchanges Proposed Interchanges

US 59 Loop Upgrade Project

TAMIU Campus