Top Banner
US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29, 2008
22

US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Dec 17, 2015

Download

Documents

Daniel Moody
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

US 113FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY

STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT

INFORMATIONAL MEETING

July 29, 2008

Page 2: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

US 113 Phase 2B Project

The project consist of design and construction of two additional lanes along existing US 113. The project also includes design and construction of new service roads to maintain access to residential and commercial properties. Roadway improvements include new full depth construction, wedge and leveling, resurfacing of existing roadways and shoulders, reforestation, closed/open drainage systems, stormwater management quality and quantity facilities, signing, intersection lighting, pavement markings, culvert replacement and culvert extensions.

Page 3: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS

Page 4: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Competitive Sealed Proposals

This Contract is a stipulated sum, design-build contract which will be procured using the “Competitive Sealed Proposals” procurement method as defined in the Code of Maryland Regulations (COMAR) Title 21, Subtitle 05, Chapter 3.

Page 5: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Competitive Sealed Proposals

The intent of the Administration is to award the Contract to a responsible team of designers and builders (DB Team) whose Proposals are determined to be the best overall value for the Administration and the citizens of Maryland for the stipulated sum set forth in the Request for Proposals (RFP).

Page 6: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Competitive Sealed Proposals

Two Step Procurement Process

Step 1 – Request For Qualification (RFQ)

Step 2 – Request For Proposals (RFP)

Page 7: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Step 1 – Request For Qualification (RFQ)

Page 8: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Step 1 – Request For Qualification (RFQ)

Objective is to create a Reduced Candidate List (RCL) of the most highly qualified Proposers with the general capability (technical, financial, and management), capacity and experience necessary to successfully undertake and complete the Work.

A Draft RFP and limited project support information will be made available with the advertisement of the RFQ

Page 9: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Step 1 – Request For Qualification (RFQ)

Statement of Qualifications (SOQ)

Evaluation Factor

I. Team Experience and Past Performance

II. Team Organization and Qualifications

III. Legal Structure and Financial Capability

Page 10: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Step 1 – Request For Qualification (RFQ)

Once SOQ evaluations are completed a reduced candidate list (RCL) shall be

developed.

Those DB Teams who have made the RCL shall be notified in writing and shall be supplied with the Final RFP Package.

Page 11: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Step 2 – Request For Proposals (RFP)

Page 12: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Step 2 – Request For Proposals (RFP)

Proposal submittal will include :

Technical Proposal

Price Proposal

Page 13: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Step 2 – Request For Proposals (RFP)

Technical Proposal Evaluation Factors

I. Project Technical Elements and Approach

II. Environmental Approach

III. Project Management

IV. Project Schedule

Page 14: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Step 2 – Request For Proposals (RFP)

Price Proposal Evaluation Factors

I. Lump Sum Price w/ Lump Sum Breakdown

Page 15: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Step 2 – Request For Proposals (RFP)

The technical review team and price proposal team will be made up of two separate groups of SHA staff.

For the purpose of the RFP evaluation, the technical proposal shall determine award of the contract.

Price Proposal will be evaluated to verify Technical proposal elements

Page 16: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Stipulated Sum

Page 17: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Step 2 – Request For Proposals (RFP)

The RFP will include a stipulated sum for the project. The Administration will set the value of the contract as the stipulated sum. This stipulated sum shall be on a lump sum basis, and shall include all engineering, design, construction, labor, equipment and materials, and all incidentals necessary to complete the design and construction of this project. Price Proposal received with a price less than or greater than this amount will be considered nonresponsive.

Page 18: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Step 2 – Request For Proposals (RFP)

Minimum Responsive LimitsThe Maryland State Highway Administration has

established the design and construction of two additional lanes along the existing US 113 alignment to create a dual divided highway and all related design and construction activities for approximately 2 miles as the minimum responsible limits for this project. Technical Proposals received with less than these limits will be considered nonresponsive.

Page 19: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Step 2 – Request For Proposals (RFP)

Maximum Limit of the WideningThe Maryland State Highway Administration has

procured the Right-of Way to facilitate the design and construction of two additional lanes along the existing US 113 alignment for approximately 1700 LF and for the design and construction of Access Road M and has established this as the maximum limit of the widening.

Page 20: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Step 2 – Request For Proposals (RFP)

PROPOSED PROCURMENT SCHEDULE

Issue RFQ August 26, 2008

Post DRAFT RFP on SHA Website August 26, 2008

Final Date for Receipt of Proposer’s Questions September 9, 2008

SOQ submittal to MSHA September 16, 2008

Reduced Candidate List (RCL) Notified September 23, 2008

Issue Final RFP to RCL September 30, 2008

Receive Technical & Price Proposals November 21, 2008

Request Best and Final Offers (BAFO) if required November 21, 2008 to December 5, 2008

Page 21: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

Questions?

Page 22: US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,

If you need additional information, please contact Mr. David W. Phillips at

[email protected]