Trasparency: Practical example from Nordic Countries. Urgent Market Message (UMM) Pasi Kuokkanen, Nord Pool Spot
7

Urgent Market Messages required from market participants and TSOs:

Feb 02, 2016

Download

Documents

wilton

Trasparency: Practical example from Nordic Cou n tries. Urgent Market Message (UMM) Pasi Kuokkanen, Nord Pool Spot. Disclosure Guidelines for Urgent Market Messages (UMMs) October 2008 - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Urgent Market Messages required from market participants and TSOs:

Trasparency:Practical example from Nordic Countries. Urgent Market Message (UMM)

Pasi Kuokkanen, Nord Pool Spot

Page 2: Urgent Market Messages required from market participants and TSOs:

Urgent Market Messages required from market participants and TSOs:

Disclosure Guidelines for Urgent Market Messages (UMMs) October 2008

Sender’s focus: Simple generation of messages informing about the reason and consequences of planned and unplanned production and consumptionoutages

Reader’s focus: Clear and understandable messages where the meaning, i.e.consequences for production and consumption are easily comprehensible

TSO Disclosure Guidelines for Urgent Market Messages (UMMs) October 2008

Sender’s focus (TSO): Simple generation of messages informing about the reason and consequences of planned and unplanned transmission outages

Reader’s focus (participant): Clear and understandable messages where the meaning, i.e.the consequences for trading capacities are easily comprehensible.

Page 3: Urgent Market Messages required from market participants and TSOs:

Inside information means information of a precise nature which has not been made public relating to one or more listed products, that would be likely to have a significant impact on the prices in one or more such products if made public. WHEN IS INFORMATION IS NEEDED?

Information about unplanned and planned outages shall always be disclosed if the available capacity represents a change of more than

100 MW of installed capacity for one generator, consumption unit or transmission facility

more than 200 MW per production station, including changes of such plans.

UMM shall be sent as soon as possible and not later than 60 minutes after the decision or failure time, including information about the reason for the outage.

Page 4: Urgent Market Messages required from market participants and TSOs:

You can find it from Nord Pool Spot´s web-pages (www.npspot.com)

TSO plans

Participant plans

Last UMMs

UMM login (to send UMMs)

Page 5: Urgent Market Messages required from market participants and TSOs:

TSO plans: next 8 days

Page 6: Urgent Market Messages required from market participants and TSOs:

Participants plans: next 6 weeks

Page 7: Urgent Market Messages required from market participants and TSOs:

Thank you for your attentention. Thank you for your attentention. Pasi Kuokkanen ([email protected])Pasi Kuokkanen ([email protected])