The edilon)(sedra Urban Slab Track system Rik Monteban Sales Manager Netherlands Urban Track conference d.d. 24/25 June 2010
38

Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

May 09, 2018

Download

Documents

hoangthu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

The edilon)(sedra

Urban Slab Track system

Rik Monteban Sales Manager Netherlands Urban Track conference d.d. 24/25 June 2010

Page 2: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra organisation

• Main activities: design, production and installation of systems for ballast less track for train, tram and metro.

• 200 FTE worldwide • Own R&D departments and research facilities• Full service partner

Page 3: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

ERS-HR

ERS-LR

ERS-CR

EBS

EDF (-FF)

Prefab-bridge

SB-steel bridge

Prefab-slabs

LC HR/LR

Basic systems

edilon)(sedra rail systems

STMSSemi prefab bridge

ERS-M

Page 4: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra rail systemsdevelopment partner and systems supplier

Page 5: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

First a brief reminder:

Karlsruhe KaiserstrasseRefurbishment of city center track

edilon)(sedra Urban Slab Track system

Page 6: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

Traffic frequency 37 trams per hour Yearly € 250.000,- maintenance on streetwork onlyRefurbishment with prefabricated imprinted slabs

Requirements- Short building time- High esthetical and qualitydemands

- Isolation of sound and fibration

edilon)(sedra -LR-PSVBK Karlsruhe Kaiserstraße

Page 7: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

Aangepast platen bij haltes

edilon)(sedra -LR-PSVBK Karlsruhe Kaiserstraße

Page 8: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

Details

edilon)(sedra -LR-FTVBK Karlsruhe Kaiserstraße

Page 9: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra -LR-PS

Versatile rail profiles

Page 10: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

Aangepast platen bij haltes

edilon)(sedra -LR-PSVBK Karlsruhe Kaiserstraße

Page 11: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

Aangepast platen bij haltes

edilon)(sedra -LR-PSVBK Karlsruhe Kaiserstraße

Page 12: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

Stockholm Spårvägen City project etapp 1

– Spårvägen City Etapp 1 - Sedra SDS System 200 mtr.– Spårvägen City Etapp 1 - Edilon Urban Slab Track 760 mtr.

edilon)(sedra – Stockholm Spårvägen City

Page 13: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

• Project start up considerations

– Design, construct and build– Intensive road traffic– Narrow work space and level crossings cannot be closed– Royal marriage comming up, therefore need to hurry up

Page 14: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

• Project caracteristcics

– Total building time 6 weeks– Drainage, cable and welding boxes integrated– Optimizing track comfort– Reduction of airborne noise– Isolation of low frequency fibrations– Responsibility for road and track specificaly devided– Low Life Cycle Costs

edilon)(sedra – Stockholm Spårvägen City

Page 15: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

• Design Edilon Urban Slab Track– Prefab concrete slabs– Steel trough– Coupling bars between the slabs– Edilon Embedded Rail System– Top layer with asphalt– STM mat for low frequency vibrations

edilon)(sedra – Stockholm Spårvägen City

Page 16: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 17: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 18: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 19: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 20: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 21: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 22: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 23: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 24: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 25: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 26: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 27: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 28: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 29: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 30: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 31: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 32: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 33: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 34: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 35: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 36: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

Page 37: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Stockholm Spårvägen City

This picture will be replaced by a finished track picture

Page 38: Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production and installation of systems for ballast less track for train, tram and metro. " 200

edilon)(sedra – Urban Slab Track system

This ends this presentation.

Thank you for your kind attention

Is there time for Questions?