Top Banner
Upper Wood Rivers Water Measurement District Steering Committee Meeting October 10, 2011
12

Upper Wood Rivers Water Measurement District Steering Committee Meeting October 10, 2011.

Dec 22, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Upper Wood Rivers Water Measurement District Steering Committee Meeting October 10, 2011.

Upper Wood Rivers Water Measurement District

Steering Committee Meeting

October 10, 2011

Page 2: Upper Wood Rivers Water Measurement District Steering Committee Meeting October 10, 2011.

Background:

Order Signed Sept. 21, 2011

First Annual Meeting to be held Nov. 7, 2011

Page 3: Upper Wood Rivers Water Measurement District Steering Committee Meeting October 10, 2011.
Page 4: Upper Wood Rivers Water Measurement District Steering Committee Meeting October 10, 2011.

Ground Water Rights Included• All irrigation ground water rights > ½ acre

• All non-irrigation rights > 0.24 cfs

Result: All ground water rights are included except domestic uses as defined by Idaho Code §42-111, and about 40 ground water rights < 0.24 cfs used for purposes other than domestic or irrigation

Ground water uses defined per §42-111 are exempt from water right permit requirements

Page 5: Upper Wood Rivers Water Measurement District Steering Committee Meeting October 10, 2011.

Number of Ground Water Rights & Wells Included in District

• About 800 ground water rights total

• About 750 unique well locations total (per water rights)

– 537 ground water rights & over 500 wells with irrigation use > 5 acres and/or diversion rate > 0.24 cfs

– 258 ground water rights & over 230 wells with irrigation use < 5 acres

– Total water rights cfs (gross) ≈ 915 cfs

Note: some gw rights/wells already administered by WD37

Page 6: Upper Wood Rivers Water Measurement District Steering Committee Meeting October 10, 2011.

Steering Committee Goals: Prepare for Nov. 7, 2011 Annual Meeting

Seek hydrographer candidate(s)

Recommend proposed budget

Recommend proposed resolutions

Consider Advisory Committee

Page 7: Upper Wood Rivers Water Measurement District Steering Committee Meeting October 10, 2011.

Hydrographer Qualifications• Elect hydrographer with

qualifications/experience in:– Water measurement– Water rights– Project management– Minimum Computer proficiency– Good interpersonal skills

Page 8: Upper Wood Rivers Water Measurement District Steering Committee Meeting October 10, 2011.

Hydrographer Duties• First Year

– Review of measurement plans– Inventory of wells/water rights– Approve plans/variances or provide recommendations– Report potential unauthorized uses to IDWR – Provide reports/budgets/assessments per law

• Second Year– Flow meter or measurement compliance checks– Provide some flow meter calibration– Report potential unauthorized uses to IDWR – Report wells not in compliance with IDWR measurement orders– Provide reports measurement/budgets/assessments per law

Page 9: Upper Wood Rivers Water Measurement District Steering Committee Meeting October 10, 2011.

District/Hydrographer Requirements• Office & Field Equipment– PC or Laptop with DSL/broadband Internet access– Telephone/cell phone, answering machine, copier– Vehicle (4 x 4 truck)– Flow meter (closed conduit required, open channel

recommended)– GPS reciever– Ground water level probe(s)– Camera

Page 10: Upper Wood Rivers Water Measurement District Steering Committee Meeting October 10, 2011.

Measuring Devices & Timelines• 5/1/2012: Submit measurement plans for non-

irrigation wells & irrigation wells > 5 acres

• 1/1/2013: Install devices for non-irrigation wells

• 3/15/2013: Install devices for irrig. wells > 5 ac

• 4/1/2013: Submit plans for irrig. wells < 5 ac

• 3/15/2014: Install devices for irrig. wells < 5 ac

Page 11: Upper Wood Rivers Water Measurement District Steering Committee Meeting October 10, 2011.

Operation Timeline• November – December 2011– Prepare/send assessments w/measurement plan forms

• January – May 2012– Hold flow meter workshop with IDWR (January)– Work with users on plans

• May – October 2012– Continue work w/users on plans, site visits & inventory

• October – November 2012– Prepare for 2013 annual meeting

Page 12: Upper Wood Rivers Water Measurement District Steering Committee Meeting October 10, 2011.

Annual Meeting Preparation:

Hydrographer Candidates

Budget Considerations

Advisory Committee Considerations

Resolutions