  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    1/18

    UpperUpper KothmaleKothmale Power PlantPower Plant

    Presented by: M.S.M.Presented by: M.S.M. ShamihShamih

    UniversityUniversity of Moratuwaof Moratuwa

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    2/18

    I am Going to Cover . . .I am Going to Cover . . .Tunnel Supporting MethodsTunnel Supporting Methods

    Site SafetySite SafetyConclusionConclusion

    AcknowledgementAcknowledgement

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    3/18

    Tunnel Supporting MethodsTunnel Supporting Methods

    Shotcrete OperationShotcrete Operation

    Rock Bolt FixingRock Bolt Fixing Steel supportsSteel supports

    All Ground Fastening (AGF) MethodAll Ground Fastening (AGF) Method

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    4/18

    Shotcrete OperationShotcrete Operation Shotcrete is a mixture of cement, chip metal, sand, dustShotcrete is a mixture of cement, chip metal, sand, dust

    ,water and admixtures,water and admixtures

    Shotcreting is done using shotcrete machineShotcreting is done using shotcrete machine

    Apply soon after excavation and removal of unsteadyApply soon after excavation and removal of unsteady

    rockrock

    Wet and Dry processes are two methods of applyingWet and Dry processes are two methods of applying

    ShotcreteShotcrete

    Wire mesh is provided to strengthenWire mesh is provided to strengthen

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    5/18

    Shotcrete OperationShotcrete Operation

    cont.cont.

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    6/18

    Rock Bolt FixingRock Bolt FixingRock bolt is a steel rod, which consists ofRock bolt is a steel rod, which consists of

    a plate and a bolta plate and a boltUsed for stabilizing loosen rock with theUsed for stabilizing loosen rock with the

    help of bed rockhelp of bed rock

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    7/18

    Steps of Rock Bolt FixingSteps of Rock Bolt FixingLocations Mark

    Drilling

    Cleaning

    Insertion of Rock Bolts

    Pumping Mortar

    Tightening of plate and nut

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    8/18

    Steel SupportsSteel SupportsSteel supports are used when theSteel supports are used when the

    ground conditions are adverseground conditions are adverseIt should be placed immediately afterIt should be placed immediately after

    tunnel excavationtunnel excavation

    They are placed by using Drill jumboThey are placed by using Drill jumboFixed at specified intervals beforeFixed at specified intervals before

    applying shotcreteapplying shotcrete

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    9/18

    Steel Supports cont.Steel Supports cont.

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    10/18

    All Ground FasteningAll Ground Fastening

    MethodMethodThis is kind of pipe roof umbrella systemThis is kind of pipe roof umbrella system

    This method is applied at the entry and theThis method is applied at the entry and theexit of the tunnelexit of the tunnel

    Increases the ground supporting capabilityIncreases the ground supporting capability

    of tunnels crownof tunnels crown

    It is possible to improve the ground aroundIt is possible to improve the ground around

    the pipes (by injecting silicate resin)the pipes (by injecting silicate resin)

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    11/18

    All Ground FasteningAll Ground Fastening

    Method Cont.Method Cont.

    Umbrella structure of

    tunnel crown

    AGF pipes

    Silicate Resin

    Structure

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    12/18

    Combination of SupportsCombination of Supports

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    13/18

    Site SafetySite SafetyEvery one enter to the tunnel must wearEvery one enter to the tunnel must wear

    helmets, boots and safety jacketshelmets, boots and safety jackets

    The person, entering to the tunnel, shouldThe person, entering to the tunnel, should

    mark his name on the signboardmark his name on the signboard

    At the time of drilling and charging everyAt the time of drilling and charging every

    one should wear ear plug and dust maskone should wear ear plug and dust mask

    The labors should wear eye protectors andThe labors should wear eye protectors and

    gloves according to the applicationgloves according to the application

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    14/18

    Site Safety Cont.Site Safety Cont.

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    15/18

    ConclusionConclusionOur country need many more vastOur country need many more vast

    projects such thisprojects such this

    We have to use Modern constructionWe have to use Modern construction

    technologiestechnologies

    Local contractors should promote toLocal contractors should promote tohandle vast projectshandle vast projects

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    16/18

    AcknowledgementAcknowledgementDr. Lesley EkanayakeDr. Lesley Ekanayake

    Dr. (Mrs.) C. JayasingheDr. (Mrs.) C. JayasingheDivision of Building Construction andDivision of Building Construction and

    ManagementManagement

    Staffs of Upper Kothmale HydropowerStaffs of Upper Kothmale HydropowerProjectProject

    Our batch mates who undergone trainingOur batch mates who undergone training

    in this projectin this project

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    17/18

  • 8/8/2019 Upper Kothmale Tunnel supporting methods

    18/18

    Questions?Questions?