Upgrade Phase 2 Mechanics meeting, 21 March 2013Introduction
Upgrade Phase II Mechanics, 21 March 2013, indico: 240514 Antti Onnela, CERN
Agenda of this meeting Tracker Layout and Module concepts Overall planning Collaboration between design teams, meetings
2
Agenda
Upgrade Phase II Mechanics, 21 March 2013, indico: 240514 Antti Onnela, CERN
3
Tracker layout and module concepts
Long Barrel
Upgrade Phase II Mechanics, 21 March 2013, indico: 240514 Antti Onnela, CERN
PS modules
2S modules
Barrel + Endcap
2S, 2-Strip modulesR > 600 mm
PS, Pixel-Strip modules R > 200 mm
VPS, Pixel-Strip modules with Vertical interconnections
R > 200 mm
4
Overall planning
Upgrade Phase II Mechanics, 21 March 2013, indico: 240514 Antti Onnela, CERN
Conceptual design, studies on materials, technologies
, cooling
D. Abbaneo
First major milestone: TP in autumn 2014Describe a mechanics concept (consistent with the proposed detector layout!), with detector modules, support and cooling structures, services arrangements. Also initial plans on how the detector can be constructed, assembled, tested and commissioned.
5
Collaboration between design teams, meetings
Until the upgrade project has chosen between the proposed, different Tracker layout concepts, the mechanics design work needs to continue on all of them.
Mechanics design teams should collaborate to:1. Identify and share common topics (e.g. choice of adhesives, cooling pipe material and connection
techniques)2. Allow for cross-checks between designs3. Avoid duplication of work4. Avoid leaving topics completely or poorly covered.
Collaboration between the design teams:1. Use Web-accessible data storages
Common ones: https://espace.cern.ch/Tracker-Upgrade/SitePages/Home.aspx and EDMS (both need a brush-up!)+ Storages maintained by each design team
2. Hold Phase 2 Mechanics meetings every ~2 months. See next slide for 2013 CMS calendar.
3. Hold a Review on the Phase 2 Mechanics in summer-autumn 2013.4. And of course email and phone.
Upgrade Phase II Mechanics, 21 March 2013, indico: 240514 Antti Onnela, CERN
6Upgrade Phase II Mechanics, 21 March 2013, indico: 240514 Antti Onnela, CERN