Top Banner
Update on the 5G PPP Update on the 5G PPP Pre FIA Workshop: Pre FIA Workshop: Radio Access and Spectrum innovations for Radio Access and Spectrum innovations for 5G 5G 20 March, Athens 20 March, Athens "The views expressed in this presentation are those of the author and do not necessarily reflect the views of the European Commission" Bernard Barani Bernard Barani E European Commission - DG CONNECT Deputy Head of Unit Network Technologies
33

Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Dec 26, 2015

Download

Documents

Douglas Gibson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Update on the 5G PPPUpdate on the 5G PPP

Pre FIA Workshop: Pre FIA Workshop:

Radio Access and Spectrum Radio Access and Spectrum innovations for 5Ginnovations for 5G

20 March, Athens20 March, Athens

"The views expressed in this presentation are those of the author and do not necessarily reflect the views of the European Commission"

Bernard BaraniBernard BaraniEEuropean Commission - DG CONNECT

Deputy Head of Unit Network Technologies

Page 2: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

High Economic importance

Strategic sector, European assets

European Initiative for future networks

5G programmes starting globally

5G PPP Motivations

Page 3: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Timeline

Page 4: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

The Future: Very wide range of requirements

Storage

Processing

Communi-cation

• From IoT to U-HDTV, ubiquity;• "Verticals" requirements• Tactile Internet

• True ubiquitous "ABC" access• Traffic growth (spectrum) and complexity• Cost /energy• ……

Page 5: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Strand Radio network architecture & technologies1000 mobile traffic increase, versatile requirementsNetwork architecture, new use cases, new frequency bands, latency;Increased frequency re-use (10), versatile low-cost radio access infrastructure (IoT to > 1Gbps) + low energyFlexible backhaul solutions, efficient signallingArchitecture for 5G "transceivers" and micro-servers, key HW building blocks to support various spectrum usage scenariosPreparing for large scale demonstrators and test-beds (possibly leveraging existing experimental facilities)

"Advanced 5G Network Infrastructure for the Future Internet"

H2020 - ICT 14

Page 6: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Strand Convergence beyond last mileIntegration, unified controlUbiquitous access continuumCooperative, cognitive fixed and heterogeneous resources, with fixed optical access reaching at least 10 Gb/sReuse and sharing of functionalities

Strand Network managementOpex, capex, QoS, QoENetwork (SON) and service management (metrics)SDN+ autonomic; Security across domains

ICT 14

Type of Action: Research and Innovation – Large projects

Budget: € 98 Million

Page 7: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Expected ImpactsAt macro level, strong EU industrial base % of markets

At societal level, a wider spectrum of applications and services at lower cost, with increased resilience and continuity, with higher efficiency of resources usage

At operational level,

1000 times higher mobile data volume per geographical area.

-10 times to 100 times higher number of connected devices.

-10 times to 100 times higher typical user data rate.

-10 times lower energy consumption for low power Machine type communication.

-5 times reduced End-to-End latency (5ms for 4G-LTE).

-Ubiquitous 5G access including in low density areas .

-European industry driving the development of 5G standards, of 5G SEP Availability of a scalable management framework reduction of network management opex by at least 20%. Availability of security/authentication metrics across multi domain virtualised networks.

ICT 14

Page 8: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Strand Virtualisation and SW NetworksFlexibility, beyond firmware implementationsVirtualisation of net.functions, VM concurrent access to resources, migrationOrchestration of resources, OS like, cross domain configurabilityIntegration service layers with network layers, reconfigurability and lanscape aware decisionOpenness, OTT integration, E2E SLA, third party providers

ICT 14

Type of Action: Innovation – Large projects

Budget: € 25 Million

Page 9: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Expected ImpactsAt macro level, i) NFV/SDN industrial capability in Europe by 2020; ii) large scale operational deployment of NFV/SDN by 2020.

At operational level, -- network function implementation through generic IT servers (target) rather than on non-programmable specific firmware (today).-- Fast deployment of large scale service platforms on top of network infrastructures, from 90 days (today) to 90 minutes (target).-- Trustworthy interoperability across multiple operational domains, networks and data centres. -NB: International co-operation with countries having bold R&I initiatives in the field (Korea, Japan, US, China) may be considered on a win-win basis.

ICT 14

Page 10: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Support ActionsCoherence and impactProgramme integration, analysis of outcomesSocietal issuesInternational activitiesSupport to standardsSupport to policiesWeb site, Roadmaps, including experimental facilities

ICT 14

Type of Action: SA – Small projects

Budget: € 2 Million

- NB: International co-operation with countries having bold R&I initiatives in the field (Korea, Japan, US, China) may be considered on a win-win basis.

Page 11: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Projects selected for funding… (R&I)•Will establish new knowledge ("that has innovation potential")

and/or

•Will explore the feasibility of a new or improved technology, product, process, service or solution. •May include basic and applied research, technology development and integration, testing and validation on a small-scale prototype in a laboratory or simulated environment. •May contain closely connected but limited demonstration or pilot activities aiming to show technical feasibility in a near to operational environment. •Will be funded at 100% Bulk of activity expected to be in "innovation-aware" mid-term R&D Small-scale innovation-type activities are expected

R&I actions

Page 12: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Excellence criterion (excerpt)

••Extent that proposed work is ambitious, has innovation potential, and is beyond the state of the art

Impact criterion (excerpt)

••Enhancing innovation capacity and integration of new knowledge;••…developing innovations meeting the needs of European and global markets; and, where relevant, by delivering such innovations to the markets

Quality & efficiency of the implementation (excerpt)

••Appropriateness of the management structures and procedures, including risk and innovation management.

Innovation included

Page 13: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

5G PPP Status

•PPP Signature 17 December 2013•MWC high level event, 5G PPP•Full Fledged association: end of March•Pre FIA 5G workshop: 17 March•FIA PPP event: 20 March (Athens) www.fi-athens.eu•Constituency building event April, 28, Paris•Submission date 25 November 2014 (€125 million)

•Projects start early 2015 See http://5g-ppp.eu/

13

Page 14: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Planned Actions

Preparation of call 1 proposals by stakeholders

Preparation of consultations for the next work-programme 2016-17;

Structuring of the work under an operational setting that reflects the 5G PPP technological tracks, still remaining agile and operational;

Establishment of the partnership board;

Definition of the required methodologies to verify progress towards KPI's;

Definition of a PPP communication plan.

14

Page 15: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Planned actions

Demonstration Strategy, short term vs long term planInternational cooperation approachStandardisation approachProcurement study

15

Page 16: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

16

Thank you!

Follow us on Twitter @NetTechEU

DG Communications Networks, Content and Technologyhttp://ec.europa.eu/digital-agenda/

Network Technologieshttp://cordis.europa.eu/fp7/ict/future-networks/

Page 17: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

17

Network technologiesICT 5: Smart networks & novel Internet architectures ICT 6: Smart optical & wireless network technologies

Software, services and cloud computingICT 7: Advanced cloud infrastructures and servicesICT 8: ECP: pre-commercial and joint procurementICT 9: Tools and methods for software development

Net InnovationICT 10: Collective awareness platforms for sustainability and

social innovationICT 13: Web entrepreneurship

Experimental Platforms

ICT 11: FIRE+ (Future Internet Research & Experimentation)ICT 12: Integrating experiments and facilities in FIRE+

Future Internet in WP 2014-15

IoT

ICT 3

0:

In

tern

et

of

thin

gs

and p

latf

orm

s fo

r co

nnect

ed s

mart

obje

cts

Network technologies

ICT 14: PPP on advanced 5G network infrastructure for the Future Internet

INCO

EU

-Bra

zil

R&

D

coopera

tion

in

advance

d

cyber

infr

ast

ruct

ure

EU

-Japan R

&D

coopera

tion in N

et

Futu

res

Page 18: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Deadline 23th April 2014:

18

• ICT 5: smart networks & novel Internet architectures (24 M€)

• ICT 6: smart optical & wireless network technologies (30 M€)

• ICT 7: advanced cloud infrastructures and services (73 M€)

• ICT 9: tools and methods for software development (25 M€)

• ICT 11: FIRE+ (31.5 M€)

• ICT 13: Web entrepreneurship (10 M€)

Calls in 2014

Deadline 25th November 2014:

Deadline 10th April 2014:

• ICT 14: 5G PPP (125 M€)

• EU-Japan R&D cooperation on Net Futures (6 M€)

Page 19: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

ICT 5. Smart Networks and novel Internet Architectures

•Novel architectural and networking approaches to information delivery and access

Evolution from a 'host centric' to a more efficient internet architecture able to support a growing number of services, processes and business models.

•Scope (Small Research and Innovation Projects)

•- novel architecture approaches (naming, routing, caching..)•- built-in security and privacy (content vs channel)•- generalised mobility and integration with IT•- Beyond content, IoT•- scalability and migration strategies•- experimental pilots

24 M€

Page 20: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

ICT 6. Smart optical and wireless network technologies

Innovative network technologies addressing the increasing traffic and the multiplicity of usages

Optical networks, Scope:

- Dynamic mgmt for lower cost and more flexible use of resources, flexible BW across domains;

- VHSA at ≥ 10 Gbps per user (in 10 years) and 100 Gbps later (including VLC);

- Intra and inter data centre connectivity;

- Optical transmission technologies;

- Attention must be given to legacy and regulation, cost- and energy-efficiency.

29

M€

Page 21: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Wireless networks, Scope:

- Dynamic control of resources through disruptive new paradigms ("femtocell"-like) – prosumers;

- Optimised spectrum use (cognitive radio, spectrum aggregation, higher bands -90GHz-, advanced mods/cods, beamforming);

- Energy efficiency and new usages;

- Hybrid combination of terrestrial and satellite infrastructures to address coverage, optimised spectrum use and network resilience.

ICT 6. Smart optical and wireless network technologies

Page 22: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

ICT 6. Smart optical and wireless network technologies

• Support Actions

• - Technological roadmaps;• - Dissemination (incl. annual conference);• - Standardisation;• - Integration of results;• - Operational and economic metrics;• - Strategies for validation and demonstration.

• Type of actions: Coordination and Support Actions

1 M€

Page 23: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Research & Innovation Actions (large actions expected, 25 M€)

24

• Creation, reconfiguration and/or extension of experimental infrastructures

• Experimentation leveraging GÉANT

• Experimentation-as-a-Service (EaaS)

• Virtual Experimentation

At least 50% of funding for users, experiments, etc.

ICT 11 - 2014

ICT 11 – FIRE+ (Future Internet Research & Experimentation)

Page 24: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Coordination & Support Actions (1.5 M€)

25

• Ideas for prototyping and experimentation, testing and validation – from identification to actual experimentation

ICT 11 - 2014

Innovation Actions (large actions, 5 M€)

• Identification of European, national and regional experimental facilities for integration into FIRE+

• Roadmap: future needs for advancednetworking experimentation

• International cooperation

ICT 11 – FIRE+ (Future Internet Research & Experimentation)

Page 25: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Research and innovation:• High performance heterogeneous cloud infrastructures• Federated cloud networking• Dynamic configuration, automated provisioning and

orchestration of cloud resources• Automated discovery and composition of services

(cloud of public services)• Cloud security

66 M€; small/large projects addressing one/more themes

ICT 7 - 2014

ICT 7 - Advanced cloud infrastructures and services

The challenge: infrastructures, methods and tools for high performance, adaptive cloud applications and services

Page 26: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

Innovation platforms for trusted cloud systems

27

• Open source software for innovative and trusted cloud-based services

5 M€; small projects; Innovation

Coordination and support actions• Reference models for SLAs in the cloud.

Legal, economic and societal factors

• Collaboration among research projects

2 M€; CSA

ICT 7 - 2014

ICT 7 - Advanced cloud infrastructures and services

Page 27: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

28

ICT 9 - 2014

• Software tools and methods for large, complex and data-intensive systems

• Software architectures and tools for highly distributed applications

25 M€; Research and innovation;small actions expected

ICT 9 – Tools and methods for software development

The challenge: Achieving quality levels required for complex & critical systems (reliability, resilience and automatic adaptation)

Page 28: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

ICT 13: Web Entrepreneurship - Innovation

29

Develop and provide new services for web entrepreneurs, building upon existing local ecosystems or hubs working together:•to launch and scale up new ventures•to link web entrepreneurs with mentors across Europe•to create exposure to new financing opportunities•to link acceleration programmes across Europe

6 M€; small projects expected

ICT 13 - 2014

ICT 13: Web Entrepreneurship - CSAs (4 M€)

Strengthen the environment for web entrepreneurship in Europe and exploit synergies across stakeholder communities

Page 29: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

EU-Japan R&D Cooperation in Net Futures

30

EU - Japan

• Technologies combining big data, internet of things in the cloud

• Optical communications super high rate core

• Access networks for densely located users

• Experimentation and development on federated Japan – EU testbeds

(Research and Innovation actions – 1.5 M€ each)

Developing common positions, standards and interoperable systems for critical networks and computing platforms

Page 30: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

ICT 5. Smart Networks and novel Internet Architectures 2/2

1. Expected impact:

- Key scientific publications (ACM Sigcomm)

- Contributions to standards (IRTF..)

- FI architecture network of researchers and users

- Links with related International developments, (US, Korea and Japan) standards

- Migration/deployment strategies and roadmaps

- Closer integration of datacom and telecom industries in EU

- Contribution towards large scale validation trials

Page 31: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

ICT 6. Smart optical and wireless network technologies 5/5

• Expected Impact- Optical NW industrial capability in Europe: ≥ 20% of the global market;

- Energy consumption of basic infra reduced by a factor of ~10;

- Spectral radiation exposure decreased through low-EMF technologies;

- 10 Gbps/user in 10 yrs; 100 Gbps/user in longer term (fixed accesses);

- Support metro and core NWs with Pbps throughput and Tbps i/f speeds;

- Reach higher spectral efficiency; targeting a 10-fold increase;

- Enable new apps through the efficient use of higher spectrum bands;

- Achieve ubiquitous access to critical/societal applications;

- Open standards for w'less and optical comms and associated SEPs;

- Cooperation with US, Japan and Korea as priority countries (win win)

Type of Actions: Research and Innovation – Small projects

29 M€

Page 32: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

5G PPP - Three phases in EU

• Phase III (2017-2018)• Large-scale trials

• Phase II (2016-2017)• System optimisation

Phase I (2014-2015) • Research (I) work

• Ignition phase (2012-2013)• Project METIS, 5GNOW,

iJOIN, TROPIC, Mobile Cloud Networking, COMBO, MOTO, PHYLAWS..

33

Page 33: Update on the 5G PPP Pre FIA Workshop: Radio Access and Spectrum innovations for 5G 20 March, Athens "The views expressed in this presentation are those.

ICT 6. Smart optical and wireless network technologies 1/5

• a.Research & Innovation actions:• Optical networks

Small Research and Innovation Actions

• Wireless networks Small Research and Innovation Actions

• b. Support Actions:Coordination and Support Actions

29 M

€1

M€