Dummy sensor masksSensor performance simulationsMicrocables developmentSensor layout
3
Dummy sensor and chips
11/10/2011G. Contin - Strip R&D Update
Dummy sensor mask submitted to FBK 2 rows of 20 mm strip per side 2 dummy chip included in the wafer
128 channels nominal size: 5900 um X 6250 um input pad pitch: 42.5 um
256 channels nominal size: 11850 um X 6250 um input pad pitch: 44.5 um
production expected for end 2011 15 sensors 400 chips w/ 128 ch. 350 chips w/ 256 ch.
microcables bonding test
draft
Good and ghost points - present configuration
Simulation:● present layout● 500 MeV/c pions● normal to the sensor● realistic signal-to-noise ratio● 2D points with only geometric considerations
11/10/2011 G. Contin - Strip R&D Update 4
Miljenko Šuljić, Stefano. Giacomo
Good and ghost points - new configuration
Simulation:● half-length strip layout● 500 MeV/c pions● normal to the sensor● realistic signal-to-noise ratio● 2D points with only geometric considerations
11/10/2011 G. Contin - Strip R&D Update 5
Miljenko Šuljić, Stefano. Giacomo
G. Contin - Strip R&D Update
6
11/10/2011
Miljenko Šuljić, Stefano. Giacomo
G. Contin - Strip R&D Update
7
SSD micro-cables
11/10/2011
Specifications: Kapton-Aluminum Thickness: 10 mm + 14 mm Pitch: 44 mm (chip) / 47.5 mm (sensor) Length: ~ 25 mm / ~ 50 mm
Assembly and folding TAB bonding technique Bonding windows facing sensor/chip different hybrid layouts for P/N side
G. Contin - Strip R&D Update
8
Microcable specifications
Chipcable layout
Cable-to-hybrid
bonding area
Cable-to-Chip bonding area (output
pads)
Cable-to-Chip bonding area (input
pads)
Transmitting area
Cable-to-sensor bonding area
Trace pitch, um 136 136 44 47.5 47.5Trace width, um
~ 80 ~ 50 ~30 ~22 ~30
Trace quantity, pcs
43 43 128 128 128
Bonding pads one row one row two rows (staggered)
- two rows (staggered)
Technological area(electrical test pads, bond test
elements)
Work area
Work area
• Chipcable developed for assembling to ALICE 128 dummy chips• Material: an aluminum-polyimide adhesive-less foiled dielectric FDI-A20 • Thickness: Al 10um, Polyimide 10um
11/10/2011
SE SRTIIE - Karkhov
G. Contin - Strip R&D Update
9
Microcable prototypes
Automatic test equipmentfor chipcables and tabbed dummy chips testing
Contact device based on
YAMAICHI socket for TAB-70 frames
First manufactured chipcables in TAB-70 frame
Work area
Work area
•Prototypes dimension adapted to TAB-70 frames:• Allows automatic test of cables and tabbed chips (cable-to-chip
assembly)• 2 cables per sample
•Shorter transmitting area wrt design to fit the TAB-70 frame•Cable width corresponds to the ALICE 128 dummy chip width
11/10/2011
SE SRTIIE - Karkhov
10
In the pipeline…
11/10/2011G. Contin - Strip R&D Update
New simulations Point reconstruction with p-n charge matching Spatial resolution as a function of the stereo angle
Manufacturing of microcables with different layouts
Bonding / assembly test of chip-cables-sensorComplete module design
Hybrid layout Cooling pipes placement Space for support holders in cables/hybrids Cable folding on sensor
G. Contin - Strip R&D Update
11
BACKUP
11/10/2011
G. Contin - Strip R&D Update
12
ASIC development
11/10/2011
ASIC specs HAL25 (Present SSD)
Upgrade target
CMOS technology 0.25 µm 0.13 µm (?)
Input pitch 80 µm ~44 µmOn 2 staggered rows (?)
ASIC size 3.65 x 11.90 mm2 5-6 x 6 mm2 (?)
Dynamic range 1MeV~290000 e-
≿1.3MeV (15 Mip)~360000 e-
Charge resolution ~1 keV~290 e-
~1 keV (0.1 Mip)~290 e-
Noise (ENC for 5 pF load cap.)
< 300 e- < 300 e-
Investigating for available solutions for strip ASIC front-end chip: contacts with UK and CERN Groups
Specification definition in progress:
G. Contin - Strip R&D Update
13
ASIC specifications
11/10/2011
ASIC specs HAL25 (Present SSD)
Upgrade target
Peaking time 1.4 – 2.2 µs ≤1 µs
Readout & Format Serial, analogue Digital (?)
ADC Off-detector On chip (?)
Common Mode correction
Off-detector On chip (?)
Power dissipation per channel[µW]
<1ms> : 265 - 360Readout: 680 - 759Acquisition: 290 – 355
Less than present
# channels per chip 128 128
Total # of channels 2.6 M ~1 – 5 M (?)
Expected Dose/Hadron Fluence (10 years)
// 30 kRad (TID)6*1011 cm -2 (hadron fluence in 1MeV n)