N SOUTH MAIN ST. WICKENDEN ST. ST. TRAVERSE ST. ST. RAMP WSM COHAN BLVD TOCKWOTTON ST. SOUTH WATER ST. THOMPSON ST. RAMP SME INDIA ST. INTERSTATE I-195 WESTBOUND INTERSTATE I-195 EASTBOUND BROOK INDIA ST. OVERLOOK PARK COHAN BLVD RAMP SME RAMP EI INTERSTATE I-195 WESTBOUND INTERSTATE I-195 EASTBOUND FOX POINT ELEMENTARY SCHOOL INDIA ST. INDIA ST. BROWN BOATHOUSE DRIVE GANO ST. GANO ST. WICKENDEN ST. TRENTON ST. I-195 OFF RAMP GANO ST. ON RAMP WADE ST. FURNACE ST. SCHOFIELD ST. IVES ST. ANN ST. HOPE ST. TOCKWOTTON HOME ARMSTRONG ST. SOUTH WATER ST. SHELDON ST. TRANSIT ST. BROOK PIKE ST. ST. ST. WICKENDEN BENEFIT ST. ST. DOLLAR ST. SOUTH MAIN ST. SOUTH ST. PIKE JAMES ST. T. HENDERSON DUDLEY ST. RHODES ST. GOFF ST. EDDY ST. WILLARD AVE. INTERSTATE ROUTE 95 SOUTHBOUND INTERSTATE ROUTE 95 NORTHBOUND RAMP WS EUDORA ST. O'CONNELL ST. BAY ST. ST. CRARY ST. ROUTE ROUTE INTERSTATE 95 SOUTHBOUND INTERSTATE 95 NORTHBOUND RAMP NE RAMP WN RAMP WP RAMP PE RAMP PS RAMP SES CRARY ST. BORDEN ST. HOSPITAL ST. PARSONAGE ST. RICHMOND ST. EDDY ST. MARENGO ST. GLOBE ST. FRANKLIN SQUARE GLOBE ST. ALLENS AVENUE CRARY ST. HURRICANE BARRIER WESTMINSTER STREET RAMP PINE SE WEST FRANKLIN ST. FRIENDSHIP ST. ST. POINT MAPLE ST. PRINCE ST. SOUTH ST. HOPPIN ST. EMMETT ST. RAMP POINT ST. MANCHESTER PL. PLAIN ST. INTERSTATE ROUTE 95 SOUTHBOUND YMCA BROAD ST. CLAVERICK ST. BROAD ST. PINE ST. ST. FOSTER ST. FRIENDSHIP ST. CLAVERICK ST. PN INTERSTATE ROUTE 95 NORTHBOUND CLIFFORD ST. BASSETT ST. EAST FRANKLIN ST. RICHMOND STREET SHIP STREET CHESTNUT STREET CLIFFORD STREET FRIENDSHIP STREET MEMORIAL BOULEVARD CRAW DORRANCE STREET SOUTH WATER STREET SOUTH MAIN STREET POINT STREET BRIDGE RAMP SE RAMP SE H H SEEKONK RIVER INDIA POINT PARK RHODE ISLAND HOSPITAL PROVIDENCE RIVER JEWELRY DISTRICT DAVOL SQ. 54" NBC SEWER WASHINGTON BRIDGE PROJECT PROVIDENCE RIVER PEDESTRIAN BRIDGE UPDATE 13 UPDATE 13 CONSTRUCTION CONTRACT INTERSTATE ROUTE 195 IMPROVEMENTS TO SEQUENCE PLAN Providence, Rhode Island 02905 Architects/Engineers/Planners 225 Chapman Street Maguire Group Inc. DEPARTMENT OF TRANSPORTATION RHODE ISLAND I F O S H E P O E T S T A L A R E D O H D N JANUARY 26, 2009 PROVIDENCE RHODE ISLAND 0 200 400 200 Scale in Feet CONTRACT 3 - $5.29 M (AS BID) 11/02 CONTRACT 5 - $2.89 M (AS BID) 8/02 CONTRACT 6 - $63.99 M (AS BID) 7/04 CONTRACT 6A - $15.50 M (AS BID) 10/05 CONTRACT 8 - $53.99 M (AS BID) 7/05 CONTRACT 9 - $26.11 M (AS BID) 5/05 CONTRACT 10 & 11- $60.5 M (AS BID - 12/07) CONTRACT 12 - $6.02 M ** (2011) CONTRACT 13 - $19.31 M ** (2010) CONTRACT 14 - $22.47 M ** (2011) CONTRACT 15 - $8.00 M ** (2011) LEGEND CONTRACT 4 - $9.59 M (AS BID) 2/02 WEST RIVER WALLS, DYER & EDDY STREETS NBC OVERFLOW CULVERTS CONTRACT 2 - $0.94 M (AS BID) 11/98 CONTRACT 1 - $4.44 M (AS BID) 1/99 SOUTH WATER STREET - CRAWFORD STREET BRIDGE TO JAMES STREET STORM DRAIN RETROFIT DEMONSTRATION PROJECT RI Contract No. 9910 RI Contract No. 9834 POINT STREET OVERPASS RAMP NE, WES & WS BRIDGES, H.B. CONSTRUCTION PUBLIC, O'CONNELL & OXFORD ST BRIDGES I-95 SOUTH - PUBLIC TO THURBERS RAMPS SE, WN, WP & NP PED. BRIDGE / EASTBOUND ON & OFF RAMPS INDIA & GANO STREETS / 54" NBC SEWER I-195 RECONSTRUCTION I-95 MAINLINE & ON / OFF RAMPS SERVICE ROADS & RAMP PS BRIDGE DEMOLITION I-195, WICKENDEN ST. TO I-95 I-95 NORTH - THURBERS TO EDDY DUDLEY ST CONNECTOR CONSTRUCT CITY STREETS, CONSTRUCT CITY STREETS, PROPERTY ACQUISITIONS - $45.02 M (TO DATE) PILE LOAD TEST PROGRAM RAMP WN PRELOAD FRANKLIN SQ. UTILITIES - $30.03 M (TO DATE) UTILITY RELOCATIONS Contract 1 Contract 2 Contract 3 Contract 4 Contract 5 Contract 7 Contract 8 Contract 9 Contract 10&11 Contract 12 Contract 13 Contract 14 Contract 15 Contract 6 YEAR 00 01 02 03 04 05 06 07 08 09 10 11 12 13 ADV. UTILITIES / RIGHT OF WAY COMPLETE 06/02 COMPLETE 04/00 CITY STREETS DREDGING - $7.00 M PROVIDENCE RIVER Contract 6A CONTRACT 7 - $84.55 M (AS BID) 5/03 RELOCATED INTERSTATE 195 PROVIDENCE RIVER BRIDGE 00 01 02 03 04 Demo 1 - 5 CONSTRUCTION CONTRACTS RI Contract No. 2002-CH-060 RI Contract No. 2002-CB-023 RI Contract No. 2002-CH-055 00 01 02 03 04 05 06 07 08 09 10 11 12 13 DEMO CONTRACTS MAY 2008 48 MONTHS 36 MONTHS 59 MONTHS 45 MONTHS 36 MONTHS 33 MONTHS 24 MONTHS 12 MONTHS 24 MONTHS BUILDING DEMOLITION CONTRACTS BUILDING DEMO CONTRACT 1 RI Contract No. 2000-CH-066 $245,000 BUILDING DEMO CONTRACT 2 RI Contract No. 2001-CH-054 $737,885 BUILDING DEMO CONTRACT 3 RI Contract No. 2003-CH-021 $1,773,222 AS BID AS BID BUILDING DEMO CONTRACT 4 RI Contract No. 2002-CH-007 $157,935 AS BID BUILDING DEMO CONTRACT 5 RI Contract No. 2003-CH-022 $164,565 AS BID AS BID RI Contract No. 2003-CB-011 ALLENS AVE, BLACKSTONE ST. HENDERSON ST. 24 MONTHS RI Contract No. 2004-CH-050 05 RI Contract No. 2005-CH-100 RI Contract No. 2005-CH-051 RI Contract No. 2005-CH-052 COMPLETE 10/05 COMPLETE 04/05 COMPLETE 03/07 RI Contract No. 2007-CH-048 I-95 TO PROVIDENCE RIVER WICKENDEN ST. TO PROVIDENCE RIVER WASHINGTON GANO STREET WALL PP & SHARED USE PATH PROVIDENCE RIVER ** DENOTES PROJECTED CONTRACT ESTIMATES (2001 ESTIMATE VALUES HAVE BEEN INCREASED USING PAST INFLATION RATES BY THE US DEPT. OF LABOR, BUREAU OF LABOR STATISTICS THRU 2007. AN ESTIMATED INFLATION RATE WAS APPLIED FROM 2007 TO THE PROPOSED CONSTRUCTION YEAR. PEDESTRIAN BRIDGE - $2.04 M ** (2011) PEDESTRIAN BRIDGE - $3.29 M ** (2009) LANDSCAPE CONTRACTS LANDSCAPE CONTRACT "A" - $1.77 M (2009) LANDSCAPE CONTRACT "B" - $1.14 M (2010) LANDSCAPE CONTRACT "C" - $2.00 M (2011)