Top Banner
19

UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

Jul 20, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP
Page 2: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

UP-West Line Background

& Project Development Process

Page 3: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

UP North Line

70 Metra Trains

8 UP Trains

UP West Line

Avg. Daily

Trains:

60 Metra Trains

50+ UP Trains

Des Plaines

West Chicago

Barrington

To Harvard

and Janesville

To

Wisconsin

Elburn

Coach Yard

Proviso/

Global II

Kedzie

North Ave

Canal St.Global I

Clybourn

Mayfair

Elk

Grove

EJ&

E

UP-Metra Commuter Territory

IHB

To Belvidere

Chrysler Plant

Geneva

Evanston

Wilmette

Lake

Bluff

Arlington Heights

WheatonElmhurst

UP Northwest Line

70 Metra Trains

2 UP Trains

West Line Challenges

• Extreme mix of

passenger & freight

• Two curfew “windows”

per day

• Daily rail “traffic jam”

backup into and

across Iowa

• Unable to support

growth

• Preservation of Metra

Performance

Oak Park

Ogden Jct.

Park

MP 15

Elburn

MP 44.00

Ogilvie

Transportation

Center

Page 4: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

UP-West Line Overall Project

• Metra and UP have been working on a four

phase improvement program on the entire

UP-W line since 2008 in order to increase safety

and reduce congestion

• Program is jointly developed and funded by

Metra and UP

• The first 3 phases are complete

• Phase 4 is the addition of a third mainline track

in two key sections – Vale interlocking in River

Forest to 25th Avenue in Melrose Park; and

Kress Road in West Chicago to Peck Road in

Geneva

Page 5: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

2008

Joint

Investment

Agreement

Planning & Analysis

2015-2019

3rd Main Track

Design/

Construction

2011-2014

Universal

Crossovers

Constructed

Implementation

UP-W Line Overall Project Timeline

2007

UP/Metra

Joint Evaluation

and Improvement

Recommendation

December 2006

UP/Metra

Agree to

Joint Study

Fall 2006

Metra request

For Long Term

Plan

2011-2014

Station Safety

Upgrades

2010-2011

Signal

Modernization

2009-2010

Project

Design

Page 6: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

• Complete Pedestrian Gate Coverage

– On road or pedestrian crossings adjacent to platforms

• End of Platform Diversions

– Channel commuter flow away from tracks

– Eliminate mid platform pedestrian crossings

– Direct flows behind pedestrian gates

• “Another Train” Warning System

– Alert commuters that a 2nd train is entering station

– Prevent unsafe behavior

• Fencing Between Tracks

– Extensions beyond platform areas

– Address flows from parking areas

• 3 New Commuter Grade Separations

UP-W Line Recently Completed Improvements

UP/Metra have made several improvements

across the UP-W Line in recent years

Page 7: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

Ogden Jct.

Kedzie

MP 3.6

Proviso/Global II

BR

C

Elburn

Coach

Yard

Peck

MP 38.41

Kress

MP 32.00

Park

MP 15

Vale

MP 9.73 Coach

Yard

Provo

Jct.Turner

MP 29.5

Oak P

ark

Mayw

ood

Melrose

Park

Bellw

ood

Berk

ele

y

Elm

hurs

t

Vill

a P

ark

Lom

bard

Gle

n E

llyn

Colle

ge A

ve

Wheato

n

Win

field

W. C

hic

ago

La F

oxElburn

MP 44.00 West

Chicago

MP 24.5

MP 19.4

25th Ave

MP 11.7

Geneva

Riv

er

Fore

st

2 mile gap6.4 mile gap

Ogilvie

UP-W Third Mainline Includes 2 Projects

Eastern Section

(Maywood/Melrose Park)

Construction Start: Fall 2017

Western Section

(Geneva/West Chicago)

Purpose of Tonight’s Open House

Construction Start: 2018

Addition of third mainline rail will remove these 2 critical bottlenecks

Page 8: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

UP-W Third Mainline – Western Section

West Chicago to Geneva

Page 9: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

Project Location – Western Section

• Kress Road to Peck Road

• Cities of Geneva and West Chicago

Page 10: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

Benefits

• Decrease commuter and freight train congestion

• Decrease commuter delays affecting Metra performance times and schedules

• Reduce motorist wait times at grade crossings

• Preserve Metra performance times

• Eliminate commuter curfews for freight trains

• Decrease the number of idling freight and passenger trains

Page 11: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

Key Features

• Track added on south side of existing tracks

– Exception: Roosevelt Road to Crissey Avenue (IL Route 25)

• Majority of track addition within UP right-of-way (property)

– Some temporary easements and permanent right-of-way needed

• Crossing improvements

– IL Route 31 (1st Street), Third Street, Western Avenue

• Geneva commuter parking lot improvements

– Lots 1, 3 and 5

– No net loss of parking with Third Street Parking Garage addition

• Addition of new bridge spans on Fox River Bridge

– Added to existing bridge substructure

Page 12: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

Local/Agency Coordination

Metra and UP have coordinated with local municipalities and federal, regional and local agencies throughout the design process.

• City of Geneva

• City of West Chicago

• Forest Preserve District of Kane County

• Geneva Park District

• Chicago Metropolitan Agency for Planning

• Illinois Department of Natural Resources

• Illinois Environmental Protection Agency

• Illinois Historic Preservation Agency

• US Army Corps of Engineers

• US Fish and Wildlife Service

Page 13: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

Proposed Construction Detour Routes

• Road Detours

– IL Route 31 (anticipated to last 16 weeks), Third Street, Western Avenue

– Staggered closures

• Parking Lot Closures

– Lots 1, 3, and 5

– Staggered closures

• Fox River Trail Access

– West Side Access: Closed on south side of bridge for 12 months; detour via north access point

– East Side Access: City emergency vehicle/trail access on north side of Wastewater Treatment Plant will be shifted south

Detour Map

See Exhibit Board for Details

Page 14: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

• National Environmental Policy Act (NEPA)

– Analysis of physical and social environment

– Documented Categorical Exclusion (DCE) for Federal Transit Administration (FTA)

– FTA approved DCE in July 2017

• National Historic Preservation Act (Section 106)

– Area of Potential Effects (APE) identified in November 2016

– National Register of Historic Places identified:

• Central Geneva Historic District (listed)

• Island Park South Bridge (eligible)

• Weber Farmstead (eligible)

– No Adverse Effect recommended in the Section 106 Technical Report distributed in April 2017

– State Historic Preservation Officer (SHPO) concurred with the overall finding in June 2017

Environmental Documentation

Note: FTA is not currently anticipated to provide funding for

construction of the UP-W Third Mainline – Western Section.

Page 15: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

• Section 4(f) Resources (Parks & Trails)

– Minor temporary occupancy adjacent to railroad during construction

• Geneva Park District

– Sunset and Dryden Parks

• Forest Preserve District of Kane County

– Fox River Trail

• Trail would remain open during construction. Minor disruptions may occur that would require a flagger.

– Fox River Access Trail (west side of river)

• Access point on south side of bridge closed for approximately 12 months

• Access point on the north side of the bridge to remain open throughout construction

– Fox River Access Trail (east side of river)

• Access point on south side of the bridge to remain open throughout construction

Environmental Documentation

Page 16: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

• Efforts have been made to reduce need for real estate acquisition

• Narrow strips of property adjacent to the existing UP right-of-way need to be acquired in parts of the project corridor

• No expected acquisitions of any existing buildings or structures with overall acquisition impacts being minimal

• Project representatives are currently contacting affected property owners to discuss the real estate acquisition process

Real Estate

Note: All acquisitions will comply with the federal Uniform Relocation

Assistance and Real Property Acquisitions Act of 1970.

Page 17: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

• NEPA environmental clearance granted July 2017

• Expected construction start – summer 2018

• UP/Metra to work with City of Geneva and West Chicago to provide construction updates

• Advance notice of detours and closings

• No anticipated impact to Metra schedules

• Construction anticipated to last 19 months

Next Steps & Construction Start

Page 18: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

• Exhibit boards displayed throughout the room

• Comment form available

• Project staff available to answer questions

• Email: [email protected]

• Website: www.metrarail.com/upw-third-main

• NEPA Environmental Document (DCE) available on project website

Thank you for attending!

UP-W Third Mainline – Western Section

Page 19: UP-West Line Background€¦ · Ogden Jct. Kedzie MP 3.6 Proviso/Global II RC Elburn Coach Yard Peck MP 38.41 Kress MP 32.00 Park MP 15 Vale MP 9.73 Coach Yard Provo Jct. Turner MP

Thank you

This presentation will repeat