Revision Client Drawing number Date Project Scale Drawn Description All levels and dimensions to be checked on site by contractor prior to commencement; Any variations to be reported to the client. This drawing is to be read in conjunction with all others relating to the project and all information derived accordingly; any anomolies to be reported to the client. Do not scale from this drawing. Use figured dimensions only. Work shown on this drawings to be carried out in accordance with current British Standards and Codes of Practice. © Copyright to DEP Landscape Architecture Limited. The information shown on this drawing shall not be reproduced or copied in any form without prior written consent from DEP Landscape Architecture Limited. BLACKFRIARS HOUSE, PARSONAGE MANCHESTER, M3 2JA T : 0161 2419878 E : [email protected] W : www.dep.co.uk DEP LANDSCAPE ARCHITECTURE LTD Copyright DEP Landscape Architecture Ltd Job number Status Kier Construction 3645 E Planning 3-16 Catholic School, Rhyl Security Strategy July 2017 05 TR 1:500@A1 NORTH SOUTH EAST WEST Rev A: Layout revised TR 14/08/2017 Rev B: Layout revised TR 30/08/2017 Rev C: Layout revised TR 11/09/2017 Rev D: Layout revised TR 12/09/2017 Rev E: Secure line adjusted adjacent KS2 TR 18/09/2017 UP UP Stair 2 103.95 m² Food Room Pð 8.81 m² Food St. Pð 8.81 m² DT St. Pð 83.03 m² Constructional Textiles Pð 95.7 m² Resistant Materials Pð 32.22 m² Multi Materials St. Pð 150.3 m² Drama Studio Pð 199.96 m² Main Hall Pð 97.09 m² 3D Art Pð 80.23 m² Design Technology Pð 8.04 m² Practice Pð 8.01 m² Practice Pð 10.31 m² Music St. Pð 12.76 m² Drama. St. Pð 10.89 m² Art St. Pð 4.23 m² Kiln Pð 1.29 m² Repro Pð 48.84 m² Boiler ? 2.4 m² WC ? 2.4 m² WC ? 5.6 m² DT St. Pð 8.2 m² Practice Pð 8.21 m² Practice Pð 16.1 m² Ext. Practice Pð 16.2 m² Retract. Seating Pð 5.3 m² Inst. St. Pð 91.58 m² Music Pð 10.68 m² Server Pð 11.78 m² SEN Mi Pð 15.92 m² Lrg Group Pð 9.98 m² SEN Office Pð 18.65 m² SEN Resource Pð 3 m² Pupil WC ? 2.55 m² Laundry Pð 4.74 m² SEN St. Pð 121.38 m² Small Hall Pð 49.08 m² Chapel Pð 4.43 m² Lift 114.36 m² Kitchen Pð 1.67 m² Riser 2.15 m² Riser 48.39 m² Staff Social Pð 37.41 m² Gen Office Pð 16.6 m² Conf. Pð 10.4 m² Pri. Isolation Pð 6.22 m² Sick Room Pð 11.98 m² HoUS Off. Pð 6.99 m² PA Pð 7.15 m² Maint. St. Pð 4.77 m² Exam St. Pð 12.15 m² Premises Pð 14.84 m² Exec. Off Pð 7.58 m² St. Pð 8.45 m² Small Group Pð 55.2 m² Play Group Pð 3.63 m² Cloak Pð 10.96 m² WCs ? 69.07 m² Nursery Pð 65.97 m² Reception Pð 21.3 m² Rec. WC Pð 9.67 m² Cloak Pð 66.18 m² Reception Pð 4.22 m² St. Pð 3.37 m² St. Pð 60.53 m² Yr 1 Classroom Pð 60.13 m² Yr 1 Classroom Pð 1.65 m² St. Pð 2.96 m² Cloak Pð 38.07 m² Nurture Pð 233.71 m² Dining Pð 3.18 m² WC ? 6.01 m² Int. Pð 3.36 m² Acc WC Pð 1.76 m² Repro Pð 45.91 m² PE St. Pð 8.46 m² Ext PE St. Pð 6 m² Acc. Chng Pð 12.56 m² Hygiene Pð 20.3 m² Sunshine Pð 8.16 m² Spec. St. Pð 9.06 m² Hygiene Pð 12 m² Small Group Pð 67.16 m² LRC Pð 86.33 m² Activity Studio Pð 6 m² Acc. Chng Pð 9.72 m² Activity St. Pð 2.6 m² LRC St. Pð 3.75 m² Acc WC ? 4.4 m² Cent St. Pð 7.04 m² Office Pð 10.22 m² Small Group Pð 5.46 m² Office Pð 48.5 m² LRC/ ICT/ B/O Pð 3 m² Cloak Pð 1.5 m² St. Pð 3 m² Cloak Pð 1.5 m² St. Pð 60.1 m² Yr 2 Classroom Pð 60.53 m² Yr 2 Clasroom Pð 8.85 m² Office (Chaplain) Pð 20.39 m² Chair St. Pð 21.63 m² WC Pð 45.66 m² Food/ Science/ DT Pð 16.99 m² Switch 600.85 m² Sports Hall Pð 3 m² Cloak Pð 1.5 m² St. Pð 1.35 m² Riser ? 1.35 m² Riser ? 16.84 m² Circ. ? Stair 1 Stair 4 33.26 m² Stair 3 19.57 m² Circ. ? 20.11 m² WC ? 19.01 m² WC ? 5.31 m² Acc. WC ? 58.49 m² Changing Pð 56.28 m² Changing Pð 3 m² St. Pð 13.61 m² WC ? 1.13 m² Cl. Pð 1.48 m² Whlchr St. Pð 1.43 m² Whlchr St. Pð 3.01 m² Cl. Pð 46.94 m² Circ. 4.22 m² Lift ? 32.37 m² Circ. ? 65.72 m² Circ. ? 10.96 m² WCs ? 3.14 m² Cloak Pð 7.7 m² Spec. St. Pð 9.77 m² Sp. St. Pð 4.23 m² Acc WC ? 12.31 m² HoLS/ Mtg Pð 9.8 m² Office Pð G0.2 Ht4 PLAYGROUP EXTERNAL PLAY (160m²) RECEPTION EXTERNAL PLAY (411m²) NURSERY EXTERNAL PLAY (240m²) VEHICULAR EXIT ELECTRICITY/ GAS SUBSTATION PEDESTRIAN ENTRANCE SECONDARY PEDESTRIAN ENTRANCE KITCHEN DELIVERIES SCHOOL VEHICLE DROP-OFF/ ADDITIONAL PARKING PEDESTRIAN ACCESS MAINTENANCE VEHICLE ACCESS KITCHEN DELIVERY/BIN COLLECTION ACCESS ROUTE VEHICULAR ENTRANCE 10 16 30 10 5 5 CAR PARK 80 CAR PARKING SPACES (+ 4 DISABLED) KS1 EXTERNAL PLAY (1130m²) 55x37M FOOTBALL PITCH (61x43M INCL RUN-OFF) U9-U10 MINI SOCCER KS2 EXTERNAL PLAY (1810m²) LOW RETAINING WALL TO FRONT EDGE OF PITCH (MAX 1.1m HEIGHT) FAITH GARDEN BIN STORE CYCLE STORE STEPS 4 5 TAXI DROP-OFF BAYS 2No 14x4M COACH BAYS 2No MINI-BUS BAYS FEATURE LANDSCAPE DISABLED PARKING 4 No SPACES RAISED PLATFORM HABITAT AREA SPRINKLER TANK & SERVICES PARENT DROP-OFF/ MEETING SPACE EMERGENCY VEHICLE ACCESS EMERGENCY VEHICLE ACCESS ENTRANCE PLAZA SLOPED BANK TO EDGE OF PITCH WITH EMBANKMENT REINFORCEMENT SYSTEM (MAX 1 IN 3 GRADIENT) ENTRANCE FEATURE HARD PLAY ALL WEATHER PITCH - UNLIT (86x49M INCL RUN-OFF) U15-U16 FOOTBALL BUILDING FINISHED FLOOR LEVEL 8.20 HARD PLAY KEY Proposed Primary Secure Line (2.0m height paladin fencing) Proposed Secondary Secure Line (1.2m height vertical rail/bow top fencing) Existing fencing to be retained (1.8m height palisade fencing) Proposed sports pitch fencing 2.4m+ height (continuation of secure boundary) Proposed access gates to match fencing Controlled access to public: entrance and car park area Private areas: secure learning space Existing fencing to be replaced (2.4m height palisade fencing)