1 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

UNLOADING PROCEDURE OF AN

AIRFLOW CONTAINER WITHOUT

PUMP

LCO2 / LN2O

Page 2: UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER …

2 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

1. Security rules

1. Wear all required safety equipments for

discharging.

2. Never open totally the valves.

3. Be aware of all gas related hazards

4. In case of Nitrous oxide, de sure that no grease is used and that the container is not located over asphalt.

Page 3: UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER …

3 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

2. Open the side doors of the container and check its general state.

Page 4: UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER …

4 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

3. Be sure that all the valves of both container and tank are fully closed.

Page 5: UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER …

5 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

4. Make sure that the pressure of the container does not under 14 bar. Use V5 if needed to rise this pressure once V4 is open.

Page 6: UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER …

6 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

5. Connect DN50 Hose between the HC1 connection of the container and the liquid Valve of the tank.

Page 7: UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER …

7 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

6. Purge the connected DN50 hose. Open the liquid valve of the tank and the purge valve V11 of the container

Do this operation 3 times and let the liquid valve of the recieving tank open.

V11

Page 8: UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER …

8 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

7. Open V2 and V4 valve of the container (yellow globe valves) using the dedicated key.

V2

V4

Page 9: UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER …

9 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 2 : Discharge of the container

8. To start the transfer, open V1.

V1

Page 10: UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER …

10 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 2 : Discharge of the container

9. Open the gaz phase valve of the receiving tank.

– Make sure the the pressure of the tank does not go under 14 bar.

– If it happens, close the gaz phase valve of the tank.

If a hazard appears, stop the transfer, tight the flences and/or change the seals and start again.

Page 11: UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER …

11 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 2 : Discharge of the container

10.Maintain the pressure of the container 4 bar above the one of the recieving tank by opening or closing V5.

V5

Pressure gauge

Page 12: UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER …

12 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 4 : End of discharging process

11.When the level reach 90%, open the trycock of the tank and check.

When the tank is full, stop the transfer by closing the gaz phase valve of the recieving tank.

Page 13: UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER …

13 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 4 : End of discharging process

12.Close V2 and V4 of the container (use the dedicated key or the security cable).

V2

V4

Page 14: UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER …

14 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 4 : End of discharging process

13.Close V1 and the gas phase valve of the recieving tank.

Purge the hose HC1 by opening V11.

V1

V11

Page 15: UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER …

15 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 4 : End of discharging process

14.Disconnect the hose HC1.

Attention : Cold burns hazards due to remaining liquid in the hose.

Page 16: UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER …

16 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 4 : End of discharging process

15.Close V11.

V11

Page 17: UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER …

17 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 4 : End of discharging process

16.Check that all the valves are closed and shut the containers doors.