Office of Facilities Planning and Construction MEMORANDUM Michael O’Donnell Associate Vice Chancellor for Facilities Planning and Construction (512) 499.4545 voice (512)499.4604 fax [email protected] [Date] TO: President’s Name President [Institution] TO/VIA: Institution’s Points-of-Contact - If Applicable FROM: Mr. Michael O’Donnell Associate Vice Chancellor for Facilities Planning and Construction REFERENCE: [Institution Name] [Project Number] [Project Name] SUBJECT: Appointment of Construction Manager-at-Risk / Design-Build Contractor / General Contractor Selection Committee Members (Document Type 510.8) Pursuant to Rule 80302, Section 5, of The University of Texas System Board of Regents’ Rules and Regulations, this memo is to notify you that the following representatives from the Office of Facilities Planning and Construction (OFPC) and The University of Texas Institution Name have been appointed to select a Construction Manager-at-Risk / Design-Build Contractor / General Contractor for the above referenced project through a Request for Qualifications / Proposal process. OFPC Representatives Institution Name Representatives 1. Selection Committee Member’s Name & Title (Chairman) 4. Selection Committee Member’s Name & Title 2. Selection Committee Member’s 5. Selection Committee Member’s Appointment_of_Selection_Committee_Members (CM,CSP&DB)