UNIVERSITY OF REGINA UNIVERSITY OF REGINA FACULTY OF ENGINEERING FACULTY OF ENGINEERING W I S E LAB W I S E LAB Process of Supplier Selection for Process of Supplier Selection for New Product Development New Product Development Diego A. Carrera Diego A. Carrera Dr. Rene V. Mayorga Dr. Rene V. Mayorga 2003 2003
25
Embed
UNIVERSITY OF REGINA FACULTY OF ENGINEERING W I S E LAB Process of Supplier Selection for New Product Development Diego A. Carrera Dr. Rene V. Mayorga.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
UNIVERSITY OF REGINAUNIVERSITY OF REGINAFACULTY OF ENGINEERINGFACULTY OF ENGINEERING
W I S E LABW I S E LAB
Process of Supplier Selection for Process of Supplier Selection for New Product DevelopmentNew Product Development
Diego A. CarreraDiego A. CarreraDr. Rene V. MayorgaDr. Rene V. Mayorga
20032003
The system was constructed in three macro groups:
1. One connected with all the information concerned with the firm, to obtain the strategic option which meet the project characteristics.
2. The other related to the making decision problem showing the actual performance of the suppliers.
3. The third one analyzes the project details and supplier offers.
Fuzzy Inference System
First Group – Supplier Characteristics
INPUTS
Technological Level: refers to plants, equipments and machinery available.
Economical Situation: evaluation of economic-financial risk factors.
Production Capacity: is the evaluation of the provider potential to produce the part at the required volume.
Market Share: refers to the market share at the moment of the project development.
OUTPUT
Strategic Option.
First Group – Fuzzy System Characteristics
TypeType MamdaniMamdani
Number of Inputs Number of Inputs 44
Number of OutputsNumber of Outputs 11
Number of RulesNumber of Rules 2222
Defuzzification Defuzzification MethodMethod
mommom
First Group – Inputs
First Group – Output
Strategic Option
First Group – Rules
Second Group – Supplier Performance
INPUTS
Quality Level: it refers to the consistency of the supplier to deliver high-quality products.
Delivery Rate: evaluate if the products arrive on time, to the correct location, in the proper quantity and with the correct information.
Cost Reduction: evaluate the cost reduction objectivesaccomplishment.
OUTPUT
Supplier Performance.
Second Group – Fuzzy System Characteristics
TypeType MamdaniMamdani
Number of Inputs Number of Inputs 33
Number of OutputsNumber of Outputs 11
Number of RulesNumber of Rules 3535
Defuzzification Defuzzification MethodMethod
mommom
Second Group – Inputs
Second Group – Output
Performance
Second Group – Rules
Third Group – Supplier Quotation
INPUTS
Part Quotation: refers to the price quoted by the supplier.
Investment Cost: it is the initial investment the firm has to incur if it decides to go on with the project.
Project Time: is the evaluation of the time needed since the purchase order placement until the first part is produced.