Page 1 of 3
UNIVERSITY OF NORTH BENGAL
Enlightenment to Perfection
OFFICE OF THE UNIVERSITY ENGINEER
(Raja Rammohunpur, PO-North Bengal University, Dist-Darjeeling, Pin-734013)
----------------------------------------------------------------------------------------------------------------------------- --------------------------------
Ref. No.: Date: 17.03.2020
Abridged Notice Inviting Quotation NIQ No. - NBU/UE/131/19-20 (2nd Call)
Sealed quotations are invited from the reputed vendors/agencies on their letter-head for the following
materials required by the Engineering department of University of North Bengal at their Main campus, Raja
Rammohunpur, Siliguri, Dist-Darjeeling---
Sl No.
Description of work/supply Quantity required
Basic rate in INR
GST in INR Total amount in INR
1 Supply of Geyser---Make: Venus,
Model: Venus Magma Plus 25GV, 25Litre
storage water Heater (White, BEE Star
Rating- 5 Star), Power consumption:
2KW, Pressure: 8 bar, Inner Tank:
Porcelain Enamel Glass- lined Tank,
Heating Element: Glass-lined double
Ceramic Heating Element, Outer body
material: PP Plastic outer body.
Guarantee- 5 years on inner tank, 2 years
on Heating Element & 2 Years on product.
16 nos
2. Supply of Time Switch--Quartz-
clock time switches with power reserve for
DIN rail mounting, day disk, 1CO,
250Vac. (Make—Seimens, ref no.-
7LF53016 or equivalent as approved by
the EIC).
16 nos
3 Supply of 4 pole power contactor--40A 415V 4pole power contactor (make-
Seimens, type-3RT2326-1A..0) or
equivalent as approved by the EIC).
5 nos
4 Supply of 2 pole power contactor--
18A 415V 2 pole power contactor (make-
Seimens, type-3TS3210-0A..2-8K) or
equivalent as approved by the EIC).
11 nos
5 Supply, fitting & fixing of LED
Television--Sony Bravia R252F
101.6cm (40 inch) FULL HD LED TV
(KLV-40R252F).
6 nos
Page 2 of 3
Last date & time of submission of quotation—-----24/03/2020 up to 1.00 p.m.
Tentative date & time of opening of quotations--- 24/03/2020 after 1.30 p.m.
Terms and Conditions:
a) The following documents are required to be uploaded/attached with the quotation— i) Valid Trade Licence. ii) PAN card. iii) GST Registration certificate. iv) Valid PT certificate/challan.
v) EMD –A sum of Rs. 10,000.00 (rupees ten thousand only) in the form of CTS
Demand Draft from any Bank as recognised by the RBI in favour of University of North Bengal payable at Siliguri is to be submitted with the tender documents as earnest money deposit, failing which the tender/quotation will be treated as cancelled. EMD will be released after expiry of 1 year from the date of successful supply, installation and maintenance of warranty/guarantee in case of successful bidder. Otherwise, shall be forfeited.
b) Quoted rate should be valid for at least 4 (four) months.
c) L1 will be calculated/finalized on basis of gross lowest quoted rate. d) Price should not exceed MRP/Latest price-list of the manufacturer, if any and should be inclusive of
all taxes as mentioned in the format. e) Time of delivery shall be reckoned 10 (ten) days from the date of receipt of work order. f) Warranty period will be considered as per manufacturer specifications or as mentionedfrom the
actual date of supply/installation. g) Taxes will be deducted as per prevailing Government norms. h) Payment will be made through account payee cheque. i) Price shall be quoted in Indian Rupees (INR). j) All material(s) supplied by the vendor(s) from the market should possess IS specification or as
recommended in the tender notice or as approved by the University Engineer or by his authorized representatives.
k) Tools and tackles for any installation work as/if required shall have to be arranged by the agency at their own cost.
l) Agency shall maintain & comply with all standard/relevant safely norms and measures at their own
cost during installation of any such equipment, if applicable.
m) Supervision of electrical components of works/supply will be carried out by concerned electrical wing of the department (office of the University Engineer) under the overall coordination of the University Engineer as the case may be.
n) Quantity of materials required may vary as per requirement of the University authority. Quantity required may increase or decrease as per decision taken by the University authority.
o) Recommendation of payment will be done only after successful delivery, installation & commissioning of the materials, as applicable.
p) Bidders are requested to be present at the time of opening of quotations/tenders. q) For any further detail bidders may contact the office of the undersigned during office hours except
Saturday, Sunday and Holidays. r) The bidders, at their own responsibility and risk is encouraged to visit and examine the site of works/supply and
its surroundings and obtain all information that may be necessary for preparing the bid for the work/supply as mentioned in the NIT/NIQ, before submitting offer with full satisfaction, the cost of visiting the site shall be at his own expense.
s) Whatever the reasons may be, no claim of idle labour, enhancement of labour rate, additional establishment cost, cost of TOLL and hire &labour charges of tools and plants, railway freight etc. would be entertained under any circumstances.
Page 3 of 3
t) The site shall be cleared of malba, debris caused by working at site by the contractor without any extra cost to the department.
u) The electrical contractor/agency will ensure that all the skilled persons managed / deployed for executing the electrical work possesses the wireman licence/workmen permit/supervisory licence etc. as required for the work and such licence should be from the Government/competent authorities. Consequences arising due to the fault of the contractor to comply with this condition would be contractor’s responsibility only.
v) The University Engineer, NBU reserves the right to deny or accept or reject any or all the applications and to amend/change/supplement/cancel any clause or the whole tendering process, at any point of time without any obligation & assigning any reasons what-so-ever and without thereby incurring any liability to the affected bidder or bidders or any obligation to inform the affected bidder or bidders of the ground for such action.
w) University authority has the liberty to take administrative/legal steps as they deem fit against the successful bidder at their discretion if the warranty/guarantee/services are not provided properly and in time by the agency/service provider. For any discrepancies, decision taken by the Vice Chancellor, University of North Bengal is final and binding. And for any court cases the jurisdiction will be Calcutta High Court.
Sd/- Sd/- Registrar University Engineer
University of North Bengal University of North Bengal
Page 1 of 4
UNIVERSITY OF NORTH BENGAL
Enlightenment to Perfection
OFFICE OF THE UNIVERSITY ENGINEER
(Raja Rammohunpur, PO-North Bengal University, Dist-Darjeeling, Pin-734013)
----------------------------------------------------------------------------------------------------------------------------- --------------------------------
Ref. No.: Date:17/03/2020
Abridged Notice Inviting Quotation NIQ No. - NBU/UE/132/19-20 (2
nd Call)
Sealed quotations are invited from the reputed vendor(s)/suppliers on their letterheadas per the
following format for the Electrical Goods required by the University of North Bengal at Raja Rammohunpur,
Siliguri, Darjeeling---
Sl. No.
Description of item Unit Quantity Basic rate in
INR
GST Total amount in INR
1 Supply of 16A 3 pin S.S combined with PVC box (Anchor/Hevells make) Nos. 100
2 Supply of 5A piano key type switch (Anchor/Hevells make) Nos. 200
3 Supply of 5A 3pin plug socket (Anchor/Hevells make) Nos. 50
4 Supply of holder (Anchor/Hevells make) a) Pendent holder Nos. 50 b) Angle holder Nos. 100
5 Supply of starter for 40W tube light (Philips/Hevells make) Nos. 400
6 Supply of 9W LED lamp (Philips/Hevells make) Nos. 200 7 Supply of Tube holder (Philips/Hevells/Surya make)
a) Big Nos. 100 b) Small Nos. 100
8 Supply of Capacitor for ceiling fan (Universal/Hevells/Tibcon make)
a) 2.5 mfd Nos. 200 b) 3.15 mfd Nos. 50
9 Supply of C series MCB (Legrand/Seimens make) a) 16A/20A SP Nos. 20 b) 63A TPN Nos. 5
10 Supply of 36/40W Electronic Ballast ((Philips/Hevells) Nos. 400
11 Supply of Ding Dong type call bell with push button. Nos. 20
12 Supply of PVC tape Nos. 90
Page 2 of 4
13 Supply of one way modular switch (Crabtree make Thames) as per IS 3854:199
a) 6A Nos. 200 b) 16A Nos. 100
14 Supply of 3 pin shuttered plug socket modular type (Crabtree make Thames) as per IS 1293:1988.
a) 6A Nos. 100 b) 16A Nos. 50
15 Supply of 2module high speed fan regulator for ceiling fan. (Crabtree make Thames)
Nos. 15
16 Supply of surface mounting plastic boxes (Crabtree make Thames)
a) 2 Module Nos. 10 b) 3 Module Nos. 30 c) 4 Module Nos. 10 d) 6 Module Nos. 50 e) 12 Module Nos. 50
17 Supply of Sapphire front plate (white) Crabtree make
Sapphire.
a) 2 Module Nos. 10 b) 3 Module Nos. 30 c) 4 Module Nos. 10 d) 6 Module Nos. 50 e) 12 Module Nos. 50
18 Supply of 36/40W Tube Rod (Philips/Hevells make) Nos. 400
19 Supply of flexible Wire (Polycab/KEI) Coil. 5 20 Supply of 60w Bulb (Philips/Hevells make) Nos. 300 21 Supply of China Kathi
a) 2" Pcked 4 b) 1.5" Pcked 4
22 Supply of 3.5c x 50 sq mm PVC armored Alluminium
cable (Polycab/KEI/RR Currency make
Mtr.
100
23 Supply of 11KV grade single core PVC insulated &
unsheathed stranded Copper wire
(Polycab/KEI/Currency make) of 90Mt. long coil
a) a) 1.0 sq mm Coil. 15 b) a) 1.5 sq mm Coil. 15 c) a) 2.5 sq mm Coil. 10 d) a) 4.0 sq mm Coil. 4
GROSS TOTAL==
Last date & time of submission of quotation—-----24/03/2020 up to 1.00 p.m.
Tentative date & time of opening of quotations--- 24/03/2020 after 1.30 p.m.
Terms and Conditions:
a) The following documents are required to be uploaded/attached with the quotation—
Page 3 of 4
i) Valid Trade Licence.
ii) PAN card.
iii) GST Registration certificate.
iv) Valid PT certificate/challan.
v) EMD –A sum of Rs. 6,000.00 (rupees six thousand only) in the form of CTS Demand Draft from any Bank as recognised by the RBI in favour of University of North Bengal payable at Siliguri is to be submitted with the tender documents as earnest money deposit, failing which the tender/quotation will be treated as cancelled. EMD will
be released after expiry of 1 year from the date of successful supply/installation and
maintenance of warranty/guarantee in case of successful bidder. Otherwise, shall be forfeited.
b) Quoted rate should be valid for at least 4 (four) months.
c) Price should not exceed MRP/Latest price-list of the manufacturer, if any and should be inclusive
of all taxes as mentioned in the format.
d) L1 will be calculated/finalized on basis of gross lowest quoted rate. e) Time of delivery shall be reckoned 20 (twenty) days from the date of receipt of work order.
f) Warranty period will be considered as mentioned from the actual date of supply/installation.
g) Taxes will be deducted as per prevailing Government norms.
h) Payment will be made through account payee cheque.
i) Price shall be quoted in Indian Rupees (INR).
j) All material(s) supplied by the vendor(s) from the market should possess IS specification or as
recommended in the tender notice or as approved by the University Engineer or by his authorized
representatives.
k) Tools and tackles for any installation work as/if required shall have to be arranged by the agency at their
own cost.
l) Agency shall maintain & comply with all standard/relevant safely norms and measures at their own cost
during installation of any such equipment, if applicable.
m) Supervision of electrical components of works/supply will be carried out by concerned electrical wing of
the department (office of the University Engineer) under the overall coordination of the University
Engineer as the case may be.
n) Quantity of materials required may vary as per requirement of the University authority. Quantity required
may increase or decrease as per decision taken by the University authority.
o) Recommendation of payment will be done only after successful delivery, installation & commissioning of
the materials, as applicable.
p) Bidders are requested to be present at the time of opening of quotations/tenders.
q) For any further detail bidders may contact the office of the undersigned during office hours except
Saturday, Sunday and Holidays.
r) The bidders, at their own responsibility and risk is encouraged to visit and examine the site of
works/supply and its surroundings and obtain all information that may be necessary for preparing the bid
for the work/supply as mentioned in the NIT/NIQ, before submitting offer with full satisfaction, the cost
of visiting the site shall be at his own expense.
s) Whatever the reasons may be, no claim of idle labour, enhancement of labour rate, additional
establishment cost, cost of TOLL and hire &labour charges of tools and plants, railway freight etc. would
be entertained under any circumstances.
t) The site shall be cleared of malba, debris caused by working at site by the contractor without any extra
cost to the department.
u) The electrical contractor/agency will ensure that all the skilled persons managed / deployed for executing
the electrical work possesses the wireman licence/workmen permit/supervisory licence etc. as required
for the work and such licence should be from the Government/competent authorities. Consequences
arising due to the fault of the contractor to comply with this condition would be contractor’s
responsibility only.
v) The University Engineer, NBU reserves the right to deny or accept or reject any or all the applications
and to amend/change/supplement/cancel any clause or the whole tendering process, at any point of time
without any obligation & assigning any reasons what-so-ever and without thereby incurring any liability
Page 4 of 4
to the affected bidder or bidders or any obligation to inform the affected bidder or bidders of the ground
for such action.
w) University authority has the liberty to take administrative/legal steps as they deem fit against the
successful bidder at their discretion if the warranty/guarantee/services are not provided properly and in
time by the agency/service provider. For any discrepancies, decision taken by the Vice Chancellor,
University of North Bengal is final and binding. And for any court cases the jurisdiction will be Calcutta
High Court.
Sd/- Sd/- Registrar University Engineer
University of North Bengal University of North Bengal
Page 1 of 2
UNIVERSITY OF NORTH BENGAL
Enlightenment to Perfection
OFFICE OF THE UNIVERSITY ENGINEER
(Raja Rammohunpur, PO-North Bengal University, Dist-Darjeeling, Pin-734013)
----------------------------------------------------------------------------------------------------------------------------- --------------------------------
Ref. No.: Date:17/03/2020
Abridged Notice Inviting Quotation NIQ No. - NBU/UE/134/19-20
Sealed quotations are invited from the reputed vendor(s)/suppliers on their letterheadas per the
following format for the Electrical Goods required by the University of North Bengal at Raja Rammohunpur,
Siliguri, Darjeeling---
Sl. No.
Description of item Unit Quantity Basic rate in
INR
GST Total amount in INR
1 Supply of Wall Fan of Sweep 400 mm, power inputs 50 watts, speed 1300 rpm. (make- Crompton Greaves, model no-- High Flo NEO or equivalent as approved by the EIC)
Nos. 50
Last date & time of submission of quotation—-----24/03/2020 up to 1.00 p.m.
Tentative date & time of opening of quotations--- 24/03/2020 after 1.30 p.m.
Terms and Conditions:
a) The following documents are required to be uploaded/attached with the quotation—
i) Valid Trade Licence.
ii) PAN card.
iii) GST Registration certificate.
iv) Valid PT certificate/challan.
v) EMD –A sum of Rs. 2,000.00 (rupees two thousand only) in the form of CTS Demand Draft from any Bank as recognised by the RBI in favour of University of North Bengal payable at Siliguri is to be submitted with the tender documents as earnest money deposit, failing which the tender/quotation will be treated as cancelled. EMD will
be released after expiry of 1 year from the date of successful supply/installation and
maintenance of warranty/guarantee in case of successful bidder. Otherwise, shall be forfeited.
b) Quoted rate should be valid for at least 4 (four) months.
c) Price should not exceed MRP/Latest price-list of the manufacturer, if any and should be inclusive
of all taxes as mentioned in the format.
d) L1 will be calculated/finalized on basis of gross lowest quoted rate. e) Time of delivery shall be reckoned 20 (twenty) days from the date of receipt of work order.
f) Warranty period will be considered as mentioned from the actual date of supply/installation.
g) Taxes will be deducted as per prevailing Government norms.
h) Payment will be made through account payee cheque.
i) Price shall be quoted in Indian Rupees (INR).
Page 2 of 2
j) All material(s) supplied by the vendor(s) from the market should possess IS specification or as
recommended in the tender notice or as approved by the University Engineer or by his authorized
representatives.
k) Tools and tackles for any installation work as/if required shall have to be arranged by the agency at their
own cost.
l) Agency shall maintain & comply with all standard/relevant safely norms and measures at their own cost
during installation of any such equipment, if applicable.
m) Supervision of electrical components of works/supply will be carried out by concerned electrical wing of
the department (office of the University Engineer) under the overall coordination of the University
Engineer as the case may be.
n) Quantity of materials required may vary as per requirement of the University authority. Quantity required
may increase or decrease as per decision taken by the University authority.
o) Recommendation of payment will be done only after successful delivery, installation & commissioning of
the materials, as applicable.
p) Bidders are requested to be present at the time of opening of quotations/tenders.
q) For any further detail bidders may contact the office of the undersigned during office hours except
Saturday, Sunday and Holidays.
r) The bidders, at their own responsibility and risk is encouraged to visit and examine the site of
works/supply and its surroundings and obtain all information that may be necessary for preparing the bid
for the work/supply as mentioned in the NIT/NIQ, before submitting offer with full satisfaction, the cost
of visiting the site shall be at his own expense.
s) Whatever the reasons may be, no claim of idle labour, enhancement of labour rate, additional
establishment cost, cost of TOLL and hire &labour charges of tools and plants, railway freight etc. would
be entertained under any circumstances.
t) The site shall be cleared of malba, debris caused by working at site by the contractor without any extra
cost to the department.
u) The electrical contractor/agency will ensure that all the skilled persons managed / deployed for executing
the electrical work possesses the wireman licence/workmen permit/supervisory licence etc. as required
for the work and such licence should be from the Government/competent authorities. Consequences
arising due to the fault of the contractor to comply with this condition would be contractor’s
responsibility only.
v) The University Engineer, NBU reserves the right to deny or accept or reject any or all the applications
and to amend/change/supplement/cancel any clause or the whole tendering process, at any point of time
without any obligation & assigning any reasons what-so-ever and without thereby incurring any liability
to the affected bidder or bidders or any obligation to inform the affected bidder or bidders of the ground
for such action.
w) University authority has the liberty to take administrative/legal steps as they deem fit against the
successful bidder at their discretion if the warranty/guarantee/services are not provided properly and in
time by the agency/service provider. For any discrepancies, decision taken by the Vice Chancellor,
University of North Bengal is final and binding. And for any court cases the jurisdiction will be Calcutta
High Court.
Sd/- Sd/- Registrar University Engineer
University of North Bengal University of North Bengal