Jan 18, 2016
May 19th, 2005 Formula SAE Presentation Event
May 19th, 2005 Formula SAE Presentation Event
– Focused Driver– Monthly Enthusiast– Thrill Seeker
May 19th, 2005 Formula SAE Presentation Event
27 Alabama Region SCCA Members Surveyed
May 19th, 2005 Formula SAE Presentation Event
May 19th, 2005 Formula SAE Presentation Event
May 19th, 2005 Formula SAE Presentation Event
– 0-60mph: 3.9sec– 60-0mph: 75ft ******– 1.45g lateral acceleration– 450lbs dry weight– 75hp @ rear wheels
May 19th, 2005 Formula SAE Presentation Event
– Aesthetic appeal– High performance qualities– Reliability testing
May 19th, 2005 Formula SAE Presentation Event
– Purchased Parts
– Conventional Machining
Processes– CNC Mill– Tig Welding
May 19th, 2005 Formula SAE Presentation Event
– 4 vehicles/day– 800 min/vehicle– 8 man production team
May 19th, 2005 Formula SAE Presentation Event
$ 19,068.35 $ 304.50 $ 191.40 $ 18,607.25 Total Vehicle
1,731.24 17.40 -1,713.84 Wheels & Tires
4,139.36 52.20 -4,087.16 Suspension & Shocks
671.39 26.10 -645.29 Steering System
780.02 26.10 -753.92 Miscellaneous, Fit & Finish
1,752.86 52.20 -1,700.66 Instruments & Wiring
1,105.89 69.60 104.40 931.89 Frame & Body
8,093.98 34.80 87.00 8,006.98 Engine & Drivetrain
$ 793.60 $ 26.10 $ -$ 767.50 Brake System
Total
Labor for Assembly to
VehicleJig TimeSub-TotalArea Totals
$ 19,068.35 $ 304.50 $ 191.40 $ 18,607.25 Total Vehicle
1,731.24 17.40 -1,713.84 Wheels & Tires
4,139.36 52.20 -4,087.16 Suspension & Shocks
671.39 26.10 -645.29 Steering System
780.02 26.10 -753.92 Miscellaneous, Fit & Finish
1,752.86 52.20 -1,700.66 Instruments & Wiring
1,105.89 69.60 104.40 931.89 Frame & Body
8,093.98 34.80 87.00 8,006.98 Engine & Drivetrain
$ 793.60 $ 26.10 $ -$ 767.50 Brake System
Total
Labor for Assembly to
VehicleJig TimeSub-TotalArea Totals
May 19th, 2005 Formula SAE Presentation Event