UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 8, 2013 South Carolina Electric and Gas ATTN: Mr. Ronald A. Jones Vice President, New Nuclear Operations P.O. Box 88 (Mail Code P40) Jenkinsville, SC 29065-0088 SUBJECT: MEETING SUMMARY – CATEGORY I – REGULATORY CONFERENCE VIRGIL C. SUMMER NUCLEAR STATION, UNIT 2, DOCKET NUMBER 52-027 Dear Mr. Jones: This letter refers to the meeting conducted on April 30, 2013 at the NRC Region II office in Atlanta GA. The purpose of this meeting, which was scheduled at your request, was to provide an opportunity for you to present to the U.S. Nuclear Regulatory Commission (NRC) your perspective on the facts and assumptions the NRC used to arrive at, and assess the significance of, the finding and associated apparent violation (AV) documented in Inspection Report No. 05200027/2013008 (ML13085A058). This finding dealt with the failure to assure that applicable regulatory requirements were correctly translated into design specifications, drawings, procedures, and instructions, as required by Criterion III, “Design Control,” of Appendix B to Title 10 of the Code of Federal Regulations (10 CFR) Part 50. As a result of this nonconformance, the anchorage and spacing of the headed shear reinforcement in multiple structural components of the nuclear island (NI), as detailed on the final design drawings, did not comply with the provisions of the “Code Requirements for Nuclear Safety Related Concrete Structures (ACI 349-01),” as required by the Updated Final Safety Analysis Report (UFSAR). Topics discussed included the apparent violation, the significance of the finding, and completed and planned corrective actions. Enclosed are a list of attendees and the presentation handouts. In accordance with 10 CFR 2.390 of the NRC’s “Rules of Practice,” a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from
28
Embed
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION … · 2013. 5. 10. · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA,
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
UNITED STATES
NUCLEAR REGULATORY COMMISSION REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
May 8, 2013
South Carolina Electric and Gas ATTN: Mr. Ronald A. Jones Vice President, New Nuclear Operations P.O. Box 88 (Mail Code P40) Jenkinsville, SC 29065-0088 SUBJECT: MEETING SUMMARY – CATEGORY I – REGULATORY CONFERENCE VIRGIL C. SUMMER NUCLEAR STATION, UNIT 2, DOCKET NUMBER 52-027 Dear Mr. Jones: This letter refers to the meeting conducted on April 30, 2013 at the NRC Region II office in Atlanta GA. The purpose of this meeting, which was scheduled at your request, was to provide an opportunity for you to present to the U.S. Nuclear Regulatory Commission (NRC) your perspective on the facts and assumptions the NRC used to arrive at, and assess the significance of, the finding and associated apparent violation (AV) documented in Inspection Report No. 05200027/2013008 (ML13085A058). This finding dealt with the failure to assure that applicable regulatory requirements were correctly translated into design specifications, drawings, procedures, and instructions, as required by Criterion III, “Design Control,” of Appendix B to Title 10 of the Code of Federal Regulations (10 CFR) Part 50. As a result of this nonconformance, the anchorage and spacing of the headed shear reinforcement in multiple structural components of the nuclear island (NI), as detailed on the final design drawings, did not comply with the provisions of the “Code Requirements for Nuclear Safety Related Concrete Structures (ACI 349-01),” as required by the Updated Final Safety Analysis Report (UFSAR). Topics discussed included the apparent violation, the significance of the finding, and completed and planned corrective actions. Enclosed are a list of attendees and the presentation handouts. In accordance with 10 CFR 2.390 of the NRC’s “Rules of Practice,” a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from
R. A. Jones 2
the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact me at (404) 997-4437. Sincerely,
/RA/ M. Scott Freeman, Chief Construction Inspection Branch 2 Division of Construction Inspection
Docket No. 52-027 License No. NPF-93 Enclosures: 1. List of Attendees 2. SCE&G Presentation Slides cc: (See pages 3 – 5)
R. A. Jones 2
the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact me at (404) 997-4437. Sincerely,
/RA/ M. Scott Freeman, Chief Construction Inspection Branch 2 Division of Construction Inspection
Docket No. 52-027 License No. NPF-93 Enclosures: 1. List of Attendees 2. SCE&G Presentation Slides cc: (See pages 3 – 5) Distribution: D. Huyck, OEDO, Region II Regional Coordinator NRO_cROP Resource OEMAIL.Resource OEWEB.Resource J. Ledford, Public Affairs Officer, RII R. Hannah, Public Affairs Officer, RII V. McCree, RII F. Brown, RII J. Munday, RII M. Miller, RII J. Yerokun, RII M. Ernstes, RII R. Jackson, RII A. Masters, RII S. Freeman, RII G. Khouri, RII K. O'Donohue, RII R. Musser, RII J. Fuller, SRI-Vogtle Units 3 & 4 P. Miles, Region II Administrator’s Administrative Assistant S. DuBose, Region II DRAC’s Administrative Assistant X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE
ADAMS: X Yes ACCESSION NUMBER: ML13128A298 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED
OFFICE RII:DCI/CIB2 RII:DCI/CIB2 SIGNATURE AFP1 via e-mail MSF1
NAME A. Ponko S. Freeman
DATE 5/ 8 /2013 5/ 8 /2013
E-MAIL COPY YES NO YES NO
OFFICIAL RECORD COPY DOCUMENT NAME: G:\CCI\DCI\CIB2\VC SUMMER\VCS RC PUBLIC MEETING SUMMARY 30 APR 2013 REV0.DOCX
R.A. Jones 3
cc: Mr. Jeffrey B. Archie Sr. Vice President, Nuclear Operations South Carolina Electric & Gas Company MC D304 220 Operation Way Cayce, SC 29033-3172 Chairman Fairfield County Council Drawer 60 Winnsboro, SC 29180 Ms. Shannon Bowyer Hudson Office of Regulatory Staff State of South Carolina 1401 Main Street Suite 900 Columbia, SC 29201 Mr. George McKinney Director South Carolina EMD 1100 Fish Hatchery Road West Columbia, SC 29172 Ms. Gidget Stanley-Banks Director Allendale County EPA 426 Mulberry Street Allendale, SC 29810 Email [email protected] (Al Bynum) [email protected] (Amy Monroe) [email protected] (Al Paglia) [email protected] (Adrian Heymer) [email protected] (April Rice) [email protected] (April R. Rice) [email protected] (Anne W. Cottingham) [email protected] (Brian Bedford) [email protected] (Bill Jacobs) [email protected] (Bill McCall, Jr.) [email protected] (Charles T. Baucom) [email protected] (Christina Barnett) cc: (Continued on page 4)