Copyright © 2006 ULA. All rights reserved. File no. United Launch Alliance Overview Dan Collins May 18, 2007 United Launch Alliance Overview Dan Collins May 18, 2007
Copyright © 2006 ULA. All rights reserved.File no.
United Launch Alliance Overview
Dan CollinsMay 18, 2007
United Launch Alliance Overview
Dan CollinsMay 18, 2007
File no. | 1 Copyright © 2006 ULA. All rights reserved.
ULA Joint Venture Team
Two World Class Launch Systems Operated by a Single Provider to the U.S. Government– Lockheed Martin’s Atlas Program– The Boeing Company’s Delta Program– Commercial Sales Through LMCLS or BLS– Does Not Include: Reusable or Shuttle Derived
A Century of Combined Experience in Expendable Launch Systems Providing Assured Access to Space– Pooled Experience of (850) Launches– Legacy Reaching Back to the 1950s
File no. | 2 Copyright © 2006 ULA. All rights reserved.
ULA Vision & Mission
Vision– One Team Launching the Quest for Knowledge, Peace,
and Freedom
Mission– ULA provides the best expendable launch systems and
services to assure access to space for our customers. Together, we protect our nation, explore the universe, and enable the commerce of space. We are a values-based team and, building on our heritage, are committed to mission success, continuous improvement, and stakeholder satisfaction.
File no. | 3 Copyright © 2006 ULA. All rights reserved.
ULA Guiding Principles
Ethical Behavior
Mission Success
Performance Excellence
Business Excellence
Employee Involvement
File no. | 4 Copyright © 2006 ULA. All rights reserved.
ULA Leadership
President and ChiefExecutive Officer
Michael Gass
ChiefOperating Officer
Dan Collins
Atlas Programs
Jim Sponnick
Delta Programs
Mark Wilkins
Engineering
Matthew Smith
Office of InternalGovernance
Cindy Corrigan
HumanResources
Eric Anderson
ProductionOperations
Phil Marshall
ChiefFinancial Officer
Joe PotterControllerJim Hardin
Officers
Chief InformationOfficer
Carmine Orsini
Quality Assurance& System Safety
Mike Jensen
SubcontractManagement
& Procurement
Mike Thomas*
MissionSuccess
Wayne Brown
Business Development
George Sowers
Transition
Mike Greichen
5.14.07
Communications
Julie Andrews
GeneralCounsel
Kevin MacCary
Corporate Secretary& Deputy
General Counsel
Peter Sloane
* Acting
File no. | 5 Copyright © 2006 ULA. All rights reserved.
ULA Launch Vehicles
Atlas
401 431 551 HLV Delta 2 Medium 4 Medium 5,4 Heavy
Delta
File no. | 6 Copyright © 2006 ULA. All rights reserved.
Mission Success
Delta II - THEMISFebruary 17, 2007
Atlas V – STP-1March 8, 2007
Delta II – NROL-21December 14, 2006
File no. | 7 Copyright © 2006 ULA. All rights reserved.
Early Accomplishments
100% Mission Success100% compliance with FTC Consent Order100% compliance with Administrative AgreementTop level organization completeExcellent Huntington Beach acceptance rateExtensive learning at all levels of organizationDemonstrated ULA synergies
Excellent Customer Support Enabling Early ULA SuccessExcellent Customer Support Enabling Early ULA Success
File no. | 8 Copyright © 2006 ULA. All rights reserved.
CY 2007 INTEGRATED LAUNCH MANIFEST
17 Launches Planned for 2007
File no. | 9 Copyright © 2006 ULA. All rights reserved.
CY 2008 INTEGRATED LAUNCH MANIFEST
21 Launches Planned for 2008
File no. | 10 Copyright © 2006 ULA. All rights reserved.
ULA ConsolidationDenver, CO
ULA HeadquartersAtlas Program Office and EngineeringAtlas V Booster Fabrication, Assembly, and TestAtlas V Centaur Assembly and TestGX Booster Final Assembly and Test
Pueblo, CODelta II Storage
Decatur, ALDelta II and IVFabrication,Assembly, andTest
Cape CanaveralAir Force Station(CCAFS), FL
Atlas V – SLC-41Delta II –SLC-17A/BDelta IV – SLC-37
Harlingen, TXAtlas V and GX Mechanical StructuresPayload Fairing Fabrication and AssemblyAdapter Fabrication and Assembly
San Diego, CAAtlas V Centaur Tank FabricationAtlas V Booster Fluid andPneumatic LinesGX Booster Tank Fabrication
Vandenberg Air ForceBase (VAFB), CA
Atlas V – SLC-3Delta II – SLC-2Delta IV – SLC-6
Huntington Beach, CADelta Program Officeand Engineering
File no. | 11 Copyright © 2006 ULA. All rights reserved.
Summary
Mission Success continues to be top priorityFocus on one team cultureInitial Concept of Operations in place; will continue to evolveAtlas/Delta working together yielding successesTransition program is baselined; Moving into execution phase