Schedule of Rate - Division Network Improvement and Key Account Works
I GENERAL REQUIREMENTS
Generally
General requirements shall include : Item- mobilisation and demobilisation- field engineering (survey)- site management- temporary utilities (electrical and lighting)- temporary controls (dewatering and sand bags)- coordinations and approvals from local concerned authority- shop drawings and as-built drawing- reporting and documentation- construction tools and equipments- site cleaning-
A
Total project cost :1 Less than 50.000.000 % 15
2 50.000.000 - 100.000.000 % 13
3 100.000.000 - 200.000.000 % 11
4 200.000.000 - 400.000.000 % 10
5 More than 400.000.000 % 9
B For project located in Divisi Utara
Total project cost :1 Less than 50.000.000 % 14
2 50.000.000 - 100.000.000 % 11
3 100.000.000 - 200.000.000 % 10
4 200.000.000 - 400.000.000 % 9
5 More than 400.000.000 % 8
C For project located in Divisi Tengah or Divisi Selatan
Total project cost :1 Less than 50.000.000 % 11
2 50.000.000 - 100.000.000 % 9
3 100.000.000 - 200.000.000 % 7
4 200.000.000 - 400.000.000 % 6
5 More than 400.000.000 % 4
FRAMEWORK AGREEMENT 2014
Item No Item Description Unit
any coordination required with concerned institution during implementation of contract (from Purchase Order issued to closing Purchase Order)
For project located at busway track, toll way, highway, railway, Harbour area.
Rate - 2014
1 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
D For all projects (percentage to total project cost)
1 traffic management (road sign, barrier, banner) % 1
Less than 50.000.000
50.000.000 - 100.000.000
100.000.000 - 200.000.000
200.000.000 - 400.000.000
More than 400.000.000
2 temporary site office and stockyard % 2
Less than 50.000.000
50.000.000 - 100.000.000
100.000.000 - 200.000.000
200.000.000 - 400.000.000
More than 400.000.000
3 health and safety equipments % 2
Less than 50.000.000
50.000.000 - 100.000.000
100.000.000 - 200.000.000
200.000.000 - 400.000.000
More than 400.000.000
2 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
REMEASUREMENT
II SITE WORKS
Test Pits / Trial Holes as specified
Price shall include :- Mobilisation and Demobilisation- Road sign, Barriers, Banners, and all necessary Safety Provision - Standard Tools and Safety Equipments- Heavy equipment such as excavator, steel padding, crane,
asphalt/concrete breaker, sheet pile, etc shall be included in unit rate- Site Cleaning- All necessary Coordinations with related Institutions
A Excavation as specified (maximum depth 2.00 meter)
1 excavation in asphalt pavement (1.0mx0.6mx1.3m, 1 pit) m3 120,700
2 excavation in concrete rigid pavement (1.0mx0.6mx1.3m, 1 pit) m3 140,300
3 excavation in concrete floor (1.0mx0.6mx1.3m, 1 pit) m3 111,300
4 excavation in interblock (1.0mx0.6mx1.3m, 1 pit) m3 61,900
5 excavation in berm (1.0mx0.6mx1.3m, 1 pit) m3 60,300
B Demolition of existing concrete rigid pavement
1 1 layer pavement, thickness 30cm m3 220,000
2 2 layers pavement, thickness 60cm m3 220,000
C Removing as specified
1 removing and reinstalling concrete paving block m2 31,500
2 transport and disposal of demolished material / soil m3 31,500
D Bedding and backfilling as specified
1 to pits in asphalt pavement m3 223,600
2 to pits in concrete rigid pavement m3 167,500
3 to pits in concrete floor m3 132,300
4 to pits in interblock (conblock) including reinstatement m3 174,200
5 to pits in berm including reinstatement m3 67,800
E Pavement reinstatement as specified
1 macadam layer 250-300mm average thickness m2 49,800
2 asphalt pavement 50-70mm average thickness m2 99,000
3 Asphalt Treatment Base (ATB) pavement m2 87,800
4 concrete rigid pavement 200-300mm average thickness m2 325,100 (including rebar dowel if required)
5 concrete floor 70-100mm average thickness m2 63,400
The Contractor shall note that all items and quantities stated below will subject to remeasure based on site implementation and condition
3 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
III PIPE WORKS
Pipelaying work including:
internal cleaning all necessary cutting, trimming & connecting installation of as specified, in-line accessories construction tools and equipments such as pumps, lighting, etc water charge for testing, flushing, chlorinating, etc : Rp.12.500,- per m3 testing and commissioning
Clean water pipe installation as specified
A HDPE - Pipe WJ
1 < 63mm m 21,400
2 63mm m 21,400
3 90mm m 21,400
4 110mm m 36,700
5 160mm m 42,100
6 200mm m 46,400
7 250mm m 62,000
Clean water pipe fittings installation as specified
B HDPE - Mitter Bend 90 WJ
1 < 63mm no 15,700
2 63mm no 18,100
3 90mm no 27,500
4 110mm no 34,300
5 160mm no 49,300
6 200mm no 62,800
7 250mm no 89,200
C HDPE - Mitter Bend 90 with single flange FJ/WJ
1 < 63mm no 14,700
2 63mm no 18,200
3 90mm no 27,500
4 110mm no 34,300
transportation of as specified, Employer's supplied material from Employer's storage to the Site
4 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
III PIPE WORKS
C HDPE - Mitter Bend 90 with single flange FJ/WJ
5 160mm no 47,200
6 200mm no 61,400
7 250mm no 88,200
D HDPE - Mitter Bend 90 all flange FJ
1 < 63mm no 14,100
2 63mm no 18,100
3 90mm no 25,000
4 110mm no 31,300
5 160mm no 44,400
6 200mm no 58,100
7 250mm no 80,500
E HDPE - Mitter Bend 45 WJ
1 < 63mm no 15,700
2 63mm no 18,100
3 90mm no 27,500
4 110mm no 34,300
5 160mm no 49,300
6 200mm no 62,800
7 250mm no 89,200
F HDPE - Mitter Bend 45 with single flange FJ/WJ
1 < 63mm no 14,700
2 63mm no 18,100
3 90mm no 27,500
4 110mm no 34,300
5 160mm no 47,200
6 200mm no 61,400
7 250mm no 88,200
G HDPE - Mitter Bend 45 all flange FJ
1 < 63mm no 14,100
2 63mm no 18,100
3 90mm no 25,000
5 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
III PIPE WORKS
G HDPE - Mitter Bend 45 all flange FJ
4 110mm no 31,300
5 160mm no 44,400
6 200mm no 56,700
7 250mm no 80,500
H DCI - Flange Adaptor for PE FJ/MJ
1 50mm no 23,600
2 75mm no 26,400
3 100mm no 34,200
4 150mm no 41,000
5 200mm no 57,700
6 250mm no 74,100
I DCI - Flange Adaptor for DIP FJ/MJ
1 50mm no 23,600
2 75mm no 26,400
3 100mm no 34,200
4 150mm no 41,000
5 200mm no 57,700
6 250mm no 74,100
J DCI - Blank Flange FJ
1 50mm no 18,900
2 75mm no 21,200
3 100mm no 28,600
4 150mm no 34,100
5 200mm no 41,200
6 250mm no 49,300
K DCI - Dismantling Joint FJ
1 50mm no 30,700
2 75mm no 34,100
3 100mm no 41,000
4 150mm no 44,400
5 200mm no 52,500
6 250mm no 65,500
6 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
III PIPE WORKS
L DCI - Gate valve with straatpot/street boxPrice shall include : installation of gate valve and related accessories installation of thrust block installation of precast concrete cover measured separately rental of GPS equipment to identify valve position in international coordinate
1 50mm no 292,100
2 75mm no 326,500
3 100mm no 415,100
4 150mm no 565,400
5 200mm no 645,200
6 250mm no 777,000
M HDPE - Mitter Tee WJ
1 63mm no 19,000
2 90mm no 40,900
3 110mm no 49,600
4 160mm no 72,400
5 200mm no 81,900
6 250mm no 100,100
N HDPE - Stub Flange WJ/FJ
1 63mm no 21,600
2 90mm no 31,000
3 110mm no 42,200
4 160mm no 62,200
5 200mm no 74,200
6 250mm no 83,700
O PIPE DECOMMISSIONINGPrice shall include : disconnection to existing pipe branching (taking out existing tee, pipe cutting, etc to ensure no flow) installation of temporary valve (if required to ensure no connection to existing customers)
1 63mm unit 290,000
2 90mm unit 380,000
3 110mm unit 420,000
4 160mm unit 571,000
5 200mm unit 647,000
6 250mm unit 760,000
7 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
III PIPEWORKS
Connection to Existing Network as specified
Price shall include :
internal cleaning disconnecting to existing pipe all necessary cutting and connecting installation of thrust block
all necessary construction tools and equipments testing and commissioning site cleaning installation of fittings measured separately coordinations with related institutions
P Connection to PVC / Asbestos Cement Existing Pipe as specified
1 to 50mm diameter existing networks no 218,900
2 to 75mm diameter existing networks no 328,900
3 to 100mm diameter existing networks no 498,000
4 to 150mm diameter existing networks no 692,600
5 to 200mm diameter existing networks no 841,500
6 to 250mm diameter existing networks no 956,100
7 to 300mm diameter existing networks no 1,237,500
8 to 350mm diameter existing networks no 1,553,500
Q Connection to GIP / Ductile Iron / Steel Existing Pipe as specified
1 to 50mm diameter existing networks no 313,800
2 to 75mm diameter existing networks no 423,700
3 to 100mm diameter existing networks no 524,800
4 to 150mm diameter existing networks no 784,300
5 to 200mm diameter existing networks no 888,800
6 to 250mm diameter existing networks no 1,045,000
7 to 300mm diameter existing networks no 1,306,800
8 to 400mm diameter existing networks no 1,742,400
9 to 600mm diameter existing networks no 2,612,500
demolition and reinstatement of existing pavement including excavation, bedding, backfilling and removaltransportation of as specified, Employer's supplied material from Employer's storage to the Site
removing of unused pipe and fittings to Employer's warehouse
8 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
III PIPEWORKS
R Connection to HDPE Existing Pipe as specified
1 to 63mm diameter existing networks no 229,900
2 to 90mm diameter existing networks no 345,300
3 to 110mm diameter existing networks no 522,900
4 to 160mm diameter existing networks no 727,200
5 to 200mm diameter existing networks no 884,000
6 to 250mm diameter existing networks no 956,100
7 to 315mm diameter existing networks no 1,375,000
8 to 350mm diameter existing networks no 1,553,500
9 to 400mm diameter existing networks no 1,627,600
10 to 630mm diameter existing networks no 2,441,400
11 to 800mm diameter existing networks no 3,662,100
S Transfer of Regular Service Connection as specified
Price shall include :
internal cleaning
all necessary cutting and connecting
all necessary construction tools and equipments testing and commissioning coordinations with related institutions
1 Generally unit 176,000
IV CONCRETE WORKS
Precast Concrete Cover
A Precast concrete for straatpot cover
1 no 302,500
- Transportation and equipment- Excavation, backfilling and compaction- Concrete support, lean concrete, crushed stone, sand bed- Vertical sleeve installation- Demolish and remove unapproved soil/material
2 RC Cover 125mm + RC Surround 190mm no 342,000
demolition and reinstatement of existing pavement including excavation, bedding, backfilling and removaltransportation of as specified, Employer's supplied material from Employer's storage to the Site
disconnecting to existing pipe including taking out existing clamp saddle
removing of unused pipe and fittings to Employer's warehouse
Installing new precast surface box size 600x600x200mm (install only), including :
Installing new precast concrete cover and shaft (install only), including transportation, grouting, waterproofing, rubber ring and equipment :
9 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
IV CONCRETE WORKS
Pipework Support
B Thrustblock Concrete as specified
1 unreinforced concrete thrustblock K-175 m3 554,600
2 reinforced concrete thrustblock K-175 m3 1,773,600
3 reinforced concrete thrustblock K-225 m3 1,861,000
4 reinforced concrete thrustblock K-250 m3 2,008,000
5 reinforced concrete thrustblock K-350 m3 2,251,200
6 reinforced concrete thrustblock K-500 m3 3,350,500
Reinforced Concrete Chamber
C Reinforced Concrete and Thrustblock (concrete support)
1 Lean concrete 50mm thick m2 27,700
2 sand bed 100mm thick m2 18,800
3 cast in situ poured concrete K-225 to concrete post including Formwok m3 781,000
4 Reinforcement bar 8mm diameter kg 16,000
5 cast in situ poured concrete K-350 to concrete post including Formwok m3 957,000
6 Reinforcement bar 19mm diameter kg 17,200
7 cast in situ poured concrete K-500 to concrete post including Formwok m3 1,210,000
8 Reinforcement bar 22mm diameter kg 19,800
D Foundation
1 wooden pilling (cerucuk dolken) dia.10mm m 8,800
2 wooden pilling (cerucuk dolken) dia.8mm m 7,100
3 bore piling 400mm (manual) m 566,200
4 bore piling 300mm (manual) m 424,700
10 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
V PIPE BRIDGE WORKS
Price shall include :
Notification :
A Preparation / Surface Cleaning
1 mechanical brushing m2 37,300
2 sand blasting m2 65,200
3 cement mortar plastering and trowell smooth finishing m2 26,900
B Painting Work
4 air sprayed steel painting (primary coating, intermediate and top surface finishing) m2 124,600
5 brushed steel painting (primary coating, intermediate and top surface finishing) m2 104,200
6 rolling or brushing concrete/wall painting (acrylic emulsion paint for exterior wall) m2 22,400
C WF Work
1 WF kg 21,000
2 Channel kg 18,300
3 Angle Steel kg 16,400
4 Anchor Bolt 13 L=700mm no 15,300
D Install Clamp and Support for steel pipe
1 Install Clamp Plate l =100mm, t =2mm with bolt 12mm =2 bolt and Baja L 200x200x2.5mm P =150mm with dynabolt 16 L =100mm distance @ 1500mm no 137,500
E Install stiffener
1 Stiffener kg 21,000
2 Base Plate kg 20,000
mobilisation & demobilisation, site management, tools & equipment (scaffolding, steel plate bordes or wooden beams & piles, health & safety tools, barriers, etc)
approval of painting material specification (color, painting layer & coatingthickness, type of painting, etc) from PT. Aetra
11 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
VI NEW CONNECTION WORKS
A
1 for 3/4" Meter size unit 787,500
PE - Clamp saddle & Frle ( Stfs ) Push Fit x 1" =1nos
PE - Service pipe 1" =6m
GIP - Pipe Sleeve TJ 11/2"
BRASS - Lockable valve MCF/TJ 1''x3/4" =1nos
BRASS - Water meter including joint adaptor TJ 3/4" =1nos
BRASS - Check or Non Return valve ( Female & Male ) TJ 3/4" =1nos
BRASS - Double Nipple TJ 3/4" =1nos
BRASS - Ball valve TJ 3/4" =1nos
STEEL - Seal wire =1nos
Concrete - Meter box =1nos
2 for 1" Meter size unit 840,000
PE - Clamp saddle & Frle ( Stfs ) Push Fit x 11/2" =1nos
PE - Service pipe 11/2" =6m
GIP - Pipe Sleeve TJ 2"
BRASS - Lockable valve MCF/TJ 11/2''x1" =1nos
BRASS - Water meter including joint adaptor TJ 1" =1nos
BRASS - Check or Non Return valve ( Female & Male ) TJ 1" =1nos
BRASS - Double Nipple TJ 1" =1nos
BRASS - Ball valve TJ 1" =1nos
STEEL - Seal wire =1nos
Concrete - Meter box =1nos
Standard of Service Connection Large Meter Connection ( Type-I ) as specified
12 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
VI NEW CONNECTION WORKS
A
3 for 11/2" Meter size unit 892,500
PE - Clamp saddle & Frle ( Stfs ) Push Fit x 2" =1nos
PE - Service pipe 2" =6m
GIP - Pipe Sleeve TJ 21/2"
BRASS - Lockable valve MCF/TJ 2''x11/2" =1nos
BRASS - Water meter including joint adaptor TJ 11/2" =1nos
BRASS - Check or Non Return valve ( Female & Male ) TJ 11/2" =1nos
BRASS - Double Nipple TJ 11/2" =1nos
BRASS - Ball valve TJ 11/2" =1nos
STEEL - Seal wire =1nos
Concrete - Meter box =1nos
B
1 for 3/4" Meter size unit 840,000
PE - Clamp saddle & Frle ( Stfs ) Push Fit x 1" =1nos
PE - Service pipe 1" =6m
GIP - Pipe Sleeve TJ 11/2"
PE - Adaptor Coupling with Male Thread TJ 1''x3/4" =1nos
BRASS - Plug Valve TJ 3/4" =1nos
BRASS - Water meter including joint adaptor TJ 3/4" =1nos
BRASS - Check or Non Return valve ( Female & Male ) TJ 3/4" =1nos
BRASS - Double Nipple TJ 3/4" =1nos
BRASS - Ball valve TJ 3/4" =1nos
STEEL - Seal wire =1nos
Concrete - Meter box =1nos
Standard of Service Connection Large Meter Connection ( Type-I ) as specified
Standard of Service Connection Large Meter Connection ( Type-II ) as specified
13 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
VI NEW CONNECTION WORKS
B
2 for 1" Meter size unit 892,500
PE - Clamp saddle & Frle ( Stfs ) Push Fit x 11/2" =1nos
PE - Service pipe 11/2" =6m
GIP - Pipe Sleeve TJ 2"
PE - Adaptor Coupling with Male Thread TJ 11/2''x1" =1nos
BRASS - Plug Valve TJ 1" =1nos
BRASS - Water meter including joint adaptor TJ 1" =1nos
BRASS - Check or Non Return valve ( Female & Male ) TJ 1" =1nos
BRASS - Double Nipple TJ 1" =1nos
BRASS - Ball valve TJ 1" =1nos
STEEL - Seal wire =1nos
Concrete - Meter box =1nos
3 for 11/2" Meter size unit 945,000
PE - Clamp saddle & Frle ( Stfs ) Push Fit x 2" =1nos
PE - Service pipe 2" =6m
GIP - Pipe Sleeve TJ 21/2"
PE - Adaptor Coupling with Male Thread TJ 2''x11/2" =1nos
BRASS - Plug Valve TJ 1" =11/2nos
BRASS - Water meter including joint adaptor TJ 11/2" =1nos
BRASS - Check or Non Return valve ( Female & Male ) TJ 11/2" =1nos
BRASS - Double Nipple TJ 11/2" =1nos
BRASS - Ball valve TJ 1" =11/2nos
STEEL - Seal wire =1nos
Concrete - Meter box =1nos
Standard of Service Connection Large Meter Connection ( Type-II ) as specified
14 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
VI NEW CONNECTION WORKS
C Standard of service connection communal meter Type I installation as speified
1 for 1/2" meter size no 1,421,000 HDPE - Clamp saddle & ferule (Stfs) TJ 00x2" =1 nosHDPE - Service pipe WJ 2" = 7.5 mBRASS - Lockable valve MCF/TJ 3/4"x1/2" = 5 nosBRASS - Water Meter TJ 1/2" = 5 nosBRASS - Ball Valve TJ 1/2" =5 nosSTEEL - Seal Wire = 5 nosBRASS - Check or Non return Valve TJ 1/2" = 5 nosGIP - Pipe Sleve TJ 21/2" =3 mHDPE - Bend 90 CJ 2" = 2 nosHDPE - Tee Equal CJ 2"x2" =1 nosHDPE - Reducer CJ 2"x1" = 2 nosHDPE - Tee CJ 2x1" = 3 nosHDPE - Service Pipe 3/4" = 1 mHDPE - Reducer CJ 1"x3/4" = 5 nosHDPE - Service Pipe 1" = 1 mBRASS - Double Nipple TJ 1/2" = 5 nos
Box Meter Works
2 cast in situ poured concrete K-175 to concrete post m3 529,300 including formworks
3 Reinforcement bar 8mm diameter kg 15,700
4 no 854,300
D Standard of service connection communal meter Type II installation as speified
1 for 1/2" meter size no 1,995,000 HDPE - Clamp saddle & ferule (Stfs) TJ 00x2" =1 nosHDPE - Service pipe WJ 2" = 9 mBRASS - Lockable valve MCF/TJ 3/4"x1/2" = 10 nosBRASS - Water Meter TJ 1/2" = 10 nosBRASS - Ball Valve TJ 1/2" = 10 nosSTEEL - Seal Wire = 10 nosBRASS - Check or Non return Valve TJ 1/2" = 10 nosGIP - Pipe Sleve TJ 21/2" =3 mHDPE - Bend 90 CJ 2" = 2 nosHDPE - Tee Equal CJ 2"x2" =1 nosHDPE - Reducer CJ 2"x1" = 2 nosHDPE - Tee CJ 2x1" = 8 nosHDPE - Service Pipe 3/4" = 2.2 mHDPE - Reducer CJ 1"x3/4" = 10 nosHDPE - Service Pipe 1" = 1 mBRASS - Double Nipple TJ 1/2" = 10 nos
Box Meter Works
2 cast in situ poured concrete K-175 to concrete post m3 529,300 including formworks
3 Reinforcement bar 8mm diameter kg 15,700
4 no 1,522,800
Install Cover Plate L =1.5m, W = 0.70m, T = 3mm including frames ;hinge; padlock; all necessary cutting and welded
Install Cover Plate L =3.1m, W = 0.70m, T = 3mm including frames ;hinge; padlock; all necessary cutting and welded
15 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
VI NEW CONNECTION WORKS
E Standard of service connection communal meter Type III installation as speified
1 for 1/2" meter size no 3,150,000 HDPE - Clamp saddle & ferule (Stfs) TJ 00x2" =1 nosHDPE - Service pipe WJ 2" = 10.5 mBRASS - Lockable valve MCF/TJ 3/4"x1/2" = 15 nosBRASS - Water Meter TJ 1/2" = 15 nosBRASS - Ball Valve TJ 1/2" = 15 nosSTEEL - Seal Wire = 15 nosBRASS - Check or Non return Valve TJ 1/2" = 15 nosGIP - Pipe Sleve TJ 21/2" =3 mHDPE - Bend 90 CJ 2" = 2 nosHDPE - Tee Equal CJ 2"x2" =1 nosHDPE - Reducer CJ 2"x1" = 2 nosHDPE - Tee CJ 2x1" = 13 nosHDPE - Service Pipe 3/4" = 4.5 mHDPE - Reducer CJ 1"x3/4" = 15 nosHDPE - Service Pipe 1" = 1 mBRASS - Double Nipple TJ 1/2" = 15 nos
Box Meter Works
2 cast in situ poured concrete K-175 to concrete post m3 529,300 including formworks
3 Reinforcement bar 8mm diameter kg 15,700
4 no 1,522,800
F Standard of Service Connection installation as specified
1 for 50mm mains set 450,700
2 for 75mm mains set 532,400
3 for 100mm mains set 645,200
4 for 150mm mains set 1,162,800
5 for 200mm mains set 1,320,000
6 for 250mm mains set 1,884,000
7 for 300mm mains set 2,070,600
DCI - Flange Adaptor For HDPE FJ/MJ =1 nosDCI - Wall Pipe All Flange FJ = 2 nosDCI - Gate Valve FJ = 2 nosDCI - T.Strainer FJ = 1 nosSS - Flow Stabilizer FJ = 1 nosDCI - Water Meter FJ = 1 nosHDPE - Stub Flange + Spool Pipe WJ/FJ = 1 nosDCI - Check Valve FJ = 1 nosTapping Clamp w ...x3/4" tap =1nosCoupler 1/2" =1nosBushing 3/4"x1/2" =1nosSeal Wire =1nosBolt with hole for seal wire =8nosTin seal =1nosHDPE - Pipe WJ = 0.5 m
Install Cover Plate L =3.1m, W = 0.70m, T = 3mm including frames ;hinge; padlock; all necessary cutting and welded
16 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
VI NEW CONNECTION WORKS
F Standard of Service Connection installation as specified
8no 302,500
- Transportation and equipment- Excavation, backfilling and compaction- Concrete support, lean concrete, crushed stone, sand bed- Vertical sleeve installation- Demolish and remove unapproved soil/material
Pipeworks Support
Reinforced concrete Chamber and thrustblock (concrete support)
G Reinforced concrete thrustblock (concrete support)
1 Lean concrete 50mm thick m2 26,500
2 sand bed 100mm thick m2 18,000
3 cast in situ poured concrete K-225 to concrete post including Formwok m3 745,500
4 Reinforcement bar 8mm diameter kg 15,700
Cover Plate Work
5 no 715,000
Service Pipe Connecion Non Standard
Additional Pipelaying Work
Price shall include :- cutting and breaking of the existing pavement- all necessary sheeting and bracing- disposal of material arising from excavations- sand bedding, filling materials, surface pavement- compaction and finishing-
- internal cleaning- all necessary cutting, trimming & connecting- installation of as specified, in-line accessories- construction tools and equipments such as pumps, lighting, etc- testing and commissioning
Excavation, bedding, backfilling, pavement reinstatement and pipelaying work as specified
H for HDPE 32mm service pipe
1 in asphalt pavement m 177,300
2 in concrete floor m 107,600
3 in concrete rigid pavement m 216,700
4 in paving block (conblock) m 77,600
5 in berm m 59,000
Installing new precast surface box size 600x600x200mm (install only), including :
Install Cover Plate L =1.731m, W =0 .8m, T = 2mm including frames L 50 x 50 x 5; hinge; padlock; all necessary cutting and welded as speified
transportation of as specified, Employer's supplied material from Employer's storage to the Site
17 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
VI NEW CONNECTION WORKS
Service Connecion Non Standard
Additional Pipelaying Work
Excavation, bedding, backfilling, pavement reinstatement and pipelaying work as specified
I for HDPE 40mm service pipe
1 in asphalt pavement m 198,600
2 in concrete floor m 120,500
3 in concrete rigid pavement m 244,800
4 in paving block (conblock) m 84,700
5 in berm m 679,800
J for HDPE 50mm service pipe
1 in asphalt pavement m 228,400
2 in concrete floor m 141,000
3 in concrete rigid pavement m 281,600
4 in paving block (conblock) m 101,600
5 in berm m 81,400
K for HDPE 63mm service pipe
1 in asphalt pavement m 190,600
2 in concrete floor m 149,100
3 in concrete rigid pavement m 246,600
4 in paving block (conblock) m 124,200
5 in berm m 90,600
L for HDPE 90mm service pipe
1 in asphalt pavement m 276,400
2 in concrete floor m 183,200
3 in concrete rigid pavement m 330,700
4 in paving block (conblock) m 113,100
5 in berm m 111,900
M for HDPE 110mm service pipe
1 in asphalt pavement m 286,600
2 in concrete floor m 207,000
3 in concrete rigid pavement m 343,200
4 in paving block (conblock) m 134,500
5 in berm m 133,700
18 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
VI NEW CONNECTION WORKS
Service Connecion Non Standard
Additional Pipelaying Work
Excavation, bedding, backfilling, pavement reinstatement and pipelaying work as specified
N for HDPE 160mm service pipe
1 in asphalt pavement m 306,100
2 in concrete floor m 231,900
3 in concrete rigid pavement m 391,600
4 in paving block (conblock) m 154,300
5 in berm m 152,500
O for HDPE 200mm service pipe
1 in asphalt pavement m 332,600
2 in concrete floor m 269,000
3 in concrete rigid pavement m 413,400
4 in paving block (conblock) m 170,400
5 in berm m 154,300
P for HDPE 250mm service pipe
1 in asphalt pavement m 397,500
2 in concrete floor m 309,300
3 in concrete rigid pavement m 451,900
4 in paving block (conblock) m 186,300
5 in berm m 204,400
Q for HDPE 300mm service pipe
1 in asphalt pavement m 406,100
2 in concrete floor m 352,600
3 in concrete rigid pavement m 469,700
4 in paving block (conblock) m 206,800
5 in berm m 159,500
19 of 20
Schedule of Rate - Division Network Improvement and Key Account WorksFRAMEWORK AGREEMENT 2014
Item No Item Description Unit Rate - 2014
VII HEAVY EQUIPMENTS
A Equipment (All-inclusive Rate)
1 drain pump portable; 3 inch day 183,700
2 drain pump portable; 6 inch day 367,500
3 drain pump portable; 8 inch day 493,500
4 generator set 60KVA day 1,113,000