Top Banner
Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level
30

Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

Dec 14, 2015

Download

Documents

Quinten Ezell
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

Unit 7.2. Respirator fit testing

TB Infection Control Training for Managers

at National and Subnational Level

Page 2: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

2

Objectives of the Unit

After this unit, the participant will:

• Be able to correctly put on (don) a disposable N95, FFP2 or FFP3 respirator

• Be able to perform a qualitative fit test on a subject

• Undergo a qualitative fit test to select an appropriate respirator for him or herself (if desired)

Page 3: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

3

Outline

• Practice donning a respirator

• How to perform a qualitative fit test on a subject

• Practice qualitative fit testing

Page 4: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

4

Personal protective equipmentRespirator vs Mask

Page 5: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

57

Page 6: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

6

Find centre of nose piece and bend gently

Page 7: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

7

Open the respirator

Page 8: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

8

Place straps on back of hand

Page 9: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

9

Place respirator on face

Page 10: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

10

Pull top strap over head

Page 11: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

11

Place top strap on crown of head

Page 12: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

12

Pull lower strap over head

Page 13: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

13

Place bottom strap at base of head

Page 14: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

14

Mould to the shape of your nose

Right way Wrong way

Page 15: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

15

User seal check

Cover respirator with both hands

1. Exhale sharply• Should feel positive pressure inside respirator• If leakage, adjust, retest

2. Inhale deeply• Negative pressure should make respirator cling to face• If leakage, adjust, retest

Page 16: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

16

Qualitative fit test procedure

Subjects should not eat, drink (except water) or chew gum for 15 minutes before the fit test

Steps:• Sensitivity test• Challenge exercises• Document results

Materials needed: test kit, range of respirator models and sizes, watch, pen, paper

Page 17: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

17

Sensitivity test

Page 18: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

18

Sensitivity Test Solution

• Inject 10 squeezes of Sensitivity Test Solution• If detected, and proceed to Challenge

Exercises• If not tasted, inject an additional 10 squeezes.

Repeat with 10 more if necessary. • Record the number of squeezes needed (10,

20 or 30).• Remove hood, and give the the subject a few

minutes to clear the taste from his/her mouth

Page 19: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

19

Challenge exercises

Have subject: • Don respirator• Perform a user seal check• Wear respirator at least 5 minutes

before testing begins

Page 20: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

20

Fit Test Solution

• Inject 10, 20, or 30 squeezes of Fit Test Solution (same number required in the Sensitivity Test)

• Continue injecting half the number (5, 10 or 15) every 30 seconds during the challenge exercises

Page 21: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

21

Challenge exercises

1. Normal breathing2. Deep breathing3. Move head side-to-side4. Move head up and down5. Talk non-stop6. Jogging in place7. Normal breathing

Page 22: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

22

1. Normal breathing

Page 23: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

23

2. Deep breathing

Page 24: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

24

3. Move head side-to-side

Page 25: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

25

4. Move head up-and-down

Page 26: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

26

5. Talk non-stop

Page 27: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

27

6. Jogging or walking in place

Page 28: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

28

7. Normal breathing

Page 29: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

29

If the subject detects the taste….

• Terminate the test, because this indicates an inadequate fit

• Wait 15 minutes and perform the test again

• A second failure may indicate that a different size or model respirator is needed

Page 30: Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.

30

If you did not taste the test solution, smile… you passed!

Document results