Unit 5University of Sunderland COMM80 Risk Assessment of Systems Change
Risk Identification: Specific Risk Identification: Specific Techniques for Particular Techniques for Particular
Perspectives.Perspectives.COMM80: Risk Assessment of
Systems Change
Unit 5
Unit 5University of Sunderland COMM80 Risk Assessment of Systems Change
Objectives of UnitObjectives of Unit
• To focus on specific techniques for risk identification that fit well with particular perspectives
– To practise their use.
• To evaluate the techniques.
Unit 5University of Sunderland COMM80 Risk Assessment of Systems Change
Personnel Personnel Perspective.Perspective.
Risk Perspective
Risk Lifecycle
(B) Personnel
Identify SSM,RAMESES
questionnaires
• Possible approaches:–generic techniques of
brainstorming and interviews.
–RAMESES questionnaires –SSM’S (Soft System
Methodology’s) rich pictures.
Typical personnel risks: (re)training, demotivation loss of personnel, resistance to change.
Unit 5University of Sunderland COMM80 Risk Assessment of Systems Change
SSM’S rich pictures.SSM’S rich pictures.
• Rich pictures were developed within SSM for understanding problem situations.• They are not limited to use in a risk management
approach • and are more typically used to define systems
requirements or examine problematic, unstructured, situations.
• A “free form” pictorial format is recommended • this represents structures, processes and issues of
the organisation. In the context of this module this would particularly be from a risk/conflict perspective.
Unit 5University of Sunderland COMM80 Risk Assessment of Systems Change
Rich Picture ExampleRich Picture Example ((from Avison and Fitzgerald’s IS Developemnt: from Avison and Fitzgerald’s IS Developemnt: Methodologies, Techniques and Tools. McGraw-Methodologies, Techniques and Tools. McGraw-
Hill, 2nd Edition, 1995.Hill, 2nd Edition, 1995.
The Secretary of a growing Professional Association believed many of its operations could be computerised: including membership, examination, and tuition administration. Before commissioning any new systems she wanted an overview of where potential benefits would be found and what problems might exist. A consultancy looked at what was going on in the organisation and created an initial rich picture of the situation. This is shown on the next slide.
Unit 5University of Sunderland COMM80 Risk Assessment of Systems Change
Rich Picture for the Rich Picture for the ScenarioScenario
This picture demonstrates a a fairly high level some personnel type risks, for instance:
•conflict between the secretary and the education secretary about the how and what to computerise
•Worries of the education assistant about the thought of automation - should alert to the risk of poor usage, resistance, also need for training and support.
Unit 5University of Sunderland COMM80 Risk Assessment of Systems Change
Rich Picture ExampleRich Picture Example
A vehicle rental company (VCR) rents cars and vans to private and business users. They have had a significant rise in the level of business rentals and predict that this will be the fastest growing market sector over the next five years. VCR is trying to decide whether to establish a separate corporate service operation to target medium to large organizations. VCR’s aim is to become a sole supplier of vehicle rentals to its corporate customers.
(from Linda MacAulay’s “Re(from Linda MacAulay’s “Requirements quirements Engineering”, Springer-Verlag London LtdEngineering”, Springer-Verlag London Ltd))..
Unit 5University of Sunderland COMM80 Risk Assessment of Systems Change
Rich Picture for Rich Picture for the Scenariothe Scenario
Unit 5University of Sunderland COMM80 Risk Assessment of Systems Change
Detail of Rich Detail of Rich PicturePicture
Area of agreement denoted by “handshake”
Area of conflict denoted by “crossed swords”
Unit 5University of Sunderland COMM80 Risk Assessment of Systems Change
SSM’S rich pictures.SSM’S rich pictures.
• Typically a rich picture of a situation should contain • main structures both formal and informal• elements of process.
• Sets of rich pictures of a situation for different stakeholders can be created and compared.
Unit 5University of Sunderland COMM80 Risk Assessment of Systems Change
Systems Development Systems Development Perspective.Perspective.
Unit 5University of Sunderland COMM80 Risk Assessment of Systems Change
SEI’s Taxonomy SEI’s Taxonomy Based Questionnaire Based Questionnaire
(TBQ)(TBQ)• Assumption: project team members have a lot of
tacit risk information.– The TBQ provides an instrument for unearthing this.
• The taxonomy is based on– risks identified in the literature on software development
(e.g. Boehm’s “top ten”), – SEI team members’ experience and – Analysis of the field trials results of the method. – It identifies characteristics of software development.
Unit 5University of Sunderland COMM80 Risk Assessment of Systems Change
The SEI TaxonomyThe SEI TaxonomyRisk Class: Product Engineering•Risk Element: Requirements