Transcript
Page 1: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA
Page 2: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

Unexploded Ordnance (UXO)

Management and the CIRIA Guides

C681 Terrestrial & C754 Maritime

Robin Rickard Programme

Manager

Page 3: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

CIRIA Guides & UXO Management

C681/C754 - Aims and Objectives

Add company logo here

UXO Incidents

UXO Risks

Core Principles

Guides Preview - Main Elements

UXO Risk Management Generic

Application

ALARP and De-Minimis

Examples of Specific Application

Questions

Page 4: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

UXO in the News 2015

Add company logo here

Source: www/oggshorewindbiz 6th April

2015

Source: www/bbc.com 7th June

2015

Page 5: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

BBC News September 2015

Add company logo here

Page 6: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

UXO Risks to Terrestrial & Maritime projects

Add company logo here

• Core Principles of UXO Risk

Management

• Generic Application to Onshore &

Offshore

• Questions

Page 7: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

CIRIA Guide – Onshore &Offshore UXO

Risks

• 2009 Land Based CIRIA Guide (C681)

• 2014 RH DHV and 6 Alpha appointed (C 754)

• Simon Cooke and Dr Nick Cooper - lead

authors

• 12 month contract - completed May 2015

published ~ Feb 2016

• Drew upon the principles of the terrestrial

guide and incorporated best offshore UXO

risk management practice

• Takes account of renewables and other

offshore schemes

• It has UK focus yet EU application

• It is not intended as a technical guide for

UXO professionals or EOD experts

Add company logo here

Page 8: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

Guide Preview - C754 Main Elements

• Background (Chapters 2 - 4) UXO in the Marine Environment

– The near and offshore environments

– Sources and types of UXO

– Legislation and regulation including HSE

• UXO Risk Management Framework (Chapters 5 - 8)

– UXO threat and risk management principles

– Threat Assessment

– Risk Assessment

– Risk Management Strategy and a selection of options

Page 9: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

Guide Preview - C754 Main Elements

• UXO Risk Mitigation (Chapters 9

and 10)

– Roles and Responsibilities

of UXO Specialists - UXO

Consultants, EOD

Contractors and Surveyors

– Delivery of UXO Risk

Management Services

• Conclusions and

Recommendations (Chapter 11)

– Assess the threat and risks

– R = P x C

– Reduce risks ALARP (Law)

– Strategy - survey for and

avoid UXO if at all possible

Page 10: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

5 Core Principles

UXO Risk Management • Threat Assessment

• Desk Study

• What type of UXO? • Risk Assessment • Risk Management

• Share • Transfer • Mitigate

• Tolerate/Carry • Risk Mitigation

• Geophysical UXO Survey

• Avoidance • Verification • Render Safe (Destroy)

• ALARP Sign-off

Page 11: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

Mitigation

Costs

ALARP

6 Alpha Associates mitigating special risks

Risk

0% 100%

Acceptable

Residual

Risk

Cost to Attain

Acceptable Residual Risk

“Acceptable”

Threshold

Mitigated Residual

de minimis

Grossly

Disproportionate

Page 12: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

UXO Risk Management

Generic Application

Page 13: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

Marine Geophysical UXO Survey

Techniques • The guides recommend a joint

approach between independent UXO and survey specialists

• Survey factors are presented (e.g. types of UXO, position, shape, mass, materials etc.)

• Survey platforms are discussed (e.g. vessels, ROV, AUVs)

• Data Capture i.e. equipment and techniques are discussed (e.g. MBES, SSS, SBP, MAG, PI MAG, MAG CONE)

• Data interpretation factors are considered (e.g. experienced UXO specialists are required to interpret processed data

Page 14: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

CIRIA Guides C681 & C754 - A Quick

Summary

UXO Guides Background

Core Principles

Guides Preview - Main Elements

Questions

Page 15: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

ALARP Sign Off - Components

Desk

Study

Survey Risk

Mitigation

Risk Risk

Mitigation Threat

Avoidance

Investigation

Georeference

Target Selection

Specification

Verification & QC

Specialist

Data Processing

6 Alpha

ALARP

Sign-off

Page 16: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

6 Alpha

Specific Application

Terrestrial Project

Page 17: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

Report 1

Generic Land DTS - March 2013

• Threat Assessment

• GE Bombs 250Kg SC

• GE Incendiaries

• GB LSA/AXO

• Risk to:

• Geo-tech Investigation

• Excavations

• Tunneling Operations (TBM)

• Risk Mitigation

• Geophysical NI UXO Survey

• Data Processing

• Target Selection

• Target Investigation

• Tech Notes?

• ALARP Sign-off

Page 18: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

Report 2

Operational Risk Management Plan -

March 2015

• Background threat

• Taken from Executive Summary

• Regulations

• MHSW act 1999

• COSH 2002

• CDM 2007/2015

• PPE 1992

• EXPL act 2005

• RIDDOR 2013

• Planning

• Cordon & Evacuation

• Ordnance Specs

• Actions on Discover

Page 19: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

Report 3

Technical Analysis of Prospective UXO -

February 2016 • Atkins/S.A.N.D - Geophysical Survey

2016 • Generic (for UXO)

• 6 Alpha SSS Contact Review • 6 Alpha Mag processing • Residual UXO Threat Evaluation

• Recommendations • Proactive Measures -Survey

Avoidance • Reactive Measures (Vessel EMOP

and TBB for Crews)

• Refinement Risk Mitigation • Design UXO strategy for planned

dredging operations • ALARP/SoC

Page 20: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA
Page 21: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA
Page 22: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA

?

Page 23: Unexploded Ordnance (UXO) - AGS · 2017-11-14 · Unexploded Ordnance (UXO) Management and the CIRIA Guides C681 Terrestrial & C754 Maritime Robin Rickard Programme Manager . CIRIA